• Title/Summary/Keyword: Construction Breakdown Structure

Search Result 153, Processing Time 0.027 seconds

Exploratory Study on BIM-based Information Breakdown Structure for Construction Document Management

  • Lee, Dong Gun;Cha, Hee Sung
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.32-39
    • /
    • 2015
  • Construction industry is an aggregate of information that diverse information is integrated and controlled. To implement successful construction projects, it can be said that the information management is very important. In particular, because information of construction sites is controlled in a form of documents, importance of the document management in construction has been increased. But, by controlling information through documents, there are difficult problems in writing and classification of the documents and preservation and utilization of the information. Also, due to incompletion of the information management system, difficulty in systematic info management arises. For this reason, this study intends to suggest the document information breakdown structure for controlling document info efficiently which is generated at construction sites. For this, through the examination of preceding studies, establishment of the concept of the document info breakdown structure, the space breakdown structure, and the info breakdown structure, availability of document information is intended to heighten.

Analysis of Construction Work Breakdown Structure of Maintenance of Educational Facility (학교시설물 유지관리를 위한 공사 분류 체계 분석)

  • Ryu, Hanguk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.251-252
    • /
    • 2015
  • Enough school facility maintenance data should be accumulated in a database or data warehouse in order to supply information about school facility correct maintenance budget plan, budget assignment, and cycle and rate of maintenance or replacement. For those, this research analyze the present school facility maintenance practice and budget and construction cost structure. In order to solve the problems, this study analyze the present practice of maintenance and replacement and obtain LCC(Life cycle cost) data, perform expert interview and then establish construction work breakdown structure of maintenance of educational facility by combining work breakdown structure(WBS) and cost breakdown structure(CBS).

  • PDF

Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager (현장 관리자 중심의 건축공사 가설기술 표준분류체계구축)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

Life Cycle Cost Breakdown Structure Development of Buildings through Delphi Analysis

  • Jeong, Jae-Hyuk;Shin, Han-Woo;Ryu, Han-Guk;Kim, Gwang-Hee;Kim, Tae-Hui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.5
    • /
    • pp.528-538
    • /
    • 2012
  • With domestic construction projects becoming bigger, more specialized and more advanced, the construction industry is striving to improve quality and quantity, and is diversifying functions and shapes. Nevertheless, the process of a construction project causes problems when we estimate construction price, because the cost breakdown structures are different in each step. The primary aim of this study was to estimate building life cycle cost using the Delphi method. The cost breakdown structure for life cycle cost was classified into planning, design, construction, maintenance and waste disposal, and each detailed classification was determined by estimating life cycle cost. Moreover, the developed cost breakdown structure is verified by consulting with experts to secure objectivity and validity.

Improvement of Design Performance for the Minimization of Public Grievances Based on a Construction Public Grievance Breakdown Structure (건설공사 민원 최소화를 위한 민원분류체계 기반 설계성능향상)

  • Moon, Sungwoo;Jo, Hwani
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.12-20
    • /
    • 2018
  • Construction projects are often large in magnitude and high in construction amount. Therefore, construction activities have great impacts on business economics and social lives in the surrounding regional area. The residents can have public grievances if they are badly affected by the construction activities. Project owners should try to minimize adverse impacts in planning and design as well as in construction. The objective of this paper is to establish a public grievance breakdown structure and apply this breakdown structure to improving design functions in an effort to minimize public grievances. This research has been done in three steps of 1) analyzing the characteristics of public grievances in construction projects; 2) developing a public grievance breakdown structure; and 3) based on the public grievance breakdown structure, generating design alternatives that can improve the preparedness against public grievances. A case study has been done to demonstrate the applicability of the public grievance breakdown structure in generating design alternatives to minimize public grievances.

Development of Work Breakdown Structure for Nuclear Power Plant (원자력발전소 Work Breakdown Structure 개발)

  • Cho, Yeong-Heock;Yang, Myung-Duck
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

The Modeling of the Element Breakdown Structure(EBS) Applicable to Construction Fields for the Integration of the Construction Information in Apartment (공동주택에서의 건설정보통합을 위한 실무형 부위별 분류체계 구축에 관한 연구)

  • Song Hyuk;Ryu Seong-Ryong;Lee Han-Min;Chung Hwan-Wook;Im Jong-Seong;Go Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.98-105
    • /
    • 2000
  • The drawing information takes the most essential part of construction information. The management of construction information through drawing information facilitates input, output and search process, thus helping maximize the usage of construction information by effectively sharing construction experience and drawing information. This paper shows how construction information can effectively used to increase the productivity of the construction process as a whole. Construction information was extracted and classified by the elements of building which are the basic and very end components of building, to accumulate information of each construction phase. Based on the result, the Element Breakdown Structure(EBS) was developed for the practical usage of construction information integration.

  • PDF

Development of Framework for Integrated Work-Risk Breakdown Structurebased on Fatal Incident Cases in Construction Industry (중대재해 사례에 기반한 건설업의 작업 및 위험분류체계 통합 프레임워크 개발)

  • Jeong, Jaemin;Jeong, Jaewook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.11-19
    • /
    • 2020
  • Since an accident in construction industry has been higher than others for decades, the accident in construction industry should be decreased. To prevention this problem, the work breakdown structure (WBS) and risk breakdown structure (RBS) are presented. the WBS and RBS, are hierarchy structure which can find fatal incident considering type of building and type of work easily and quickly. So, this study aims to develop framework for the integrated WBS-RBS to prevent fatal incident on construction industry. The research process is conducted by following 3 steps: (I) collection of data; (II) classification of data; and (III) development of the integrated WBS-RBS. The result of this study can propose the most dangerous fatal incident aspect of type of building, type of work, and type of accident. Through the result, the decision maker can reduce or eliminate fatal incident considering type of building, type of work and type of accident in construction industry.

Cost Breakdown Structure for Reasonable Maintenance of Educational Facilities (교육시설물의 합리적인 유지관리를 위한 비용분류체계)

  • Jeong, Jae-Hyuk;Shin, Han-Woo;Kim, Tae-Hui
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.65-67
    • /
    • 2011
  • It is necessary to the development of the best maintenance system for applying the long-term maintenance plan using the cost breakdown structure in the educational facilities. This study developed the cost breakdown structure for the best maintenance system using the delphi method. For the convenience of maintenance, the maintenance cost breakdown structures are separated into building exterior wall, building inside wall, electric installation, heating installation and outdoor facilities. And these results atomized in each parts. And this study constructed the cost breakdown structure to maintenance's practicality and effectiveness through the expert analysis.

  • PDF