• Title/Summary/Keyword: Concrete railway track

Search Result 304, Processing Time 0.031 seconds

Appliance of Slab tracks on the Prestressed Concrete Bridges (슬래브궤도의 콘크리트교량 적용성 검토)

  • Kim, Nam-Hoon;Lim, Young-Su;Shin, Yong-Joon
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1037-1043
    • /
    • 2007
  • The railroad systems with the ballast tracks have been widely used for a long time. But recently, the use of the slab track is being increased gradually with a technical developments. So, this paper deals with the appliance of the slab tracks on the railroad bridges. Firstly, review the design criteria of the railroad bridges related to the slab tracks for the stability and serviceability, based on DIN and EURO code. Then, perform the analysis of the railroad prestressed concrete bridges, and check whether the results of the analysis satisfy the design criteria. Finally, find the construction condition of bridges that all the design criteria are satisfied. As a result, to maintain the stability and serviceability of the bridges, bridges must have some restrictions, including a time of installation of the slab tracks. So, the construction schedule for the erection of the bridges will be carefully considered in case of the concrete railroad bridges with the slab tracks.

  • PDF

A Study on the Pile Material Suited for Pile Supported Embankment Reinforced by Geosynthetics (토목섬유로 보강된 성토지지말뚝 구조에 적합한 말뚝재료의 개발)

  • Choi, Choong-Lak;Lee, Kwang-Wu;Kim, Eun-Ho;Jung, Ji-Won
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.1
    • /
    • pp.21-35
    • /
    • 2016
  • It is a current trend that the concrete track is applied for high speed railway. In the case of the railway embankment constructed on soft ground, the damage to concrete track which is sensitive to settlement such as distortion and deflection could be caused by very small amount of long term settlement. Pile Supported Embankment method can be considered as the effective method to control the residual settlement of the railway embankment on soft ground. The Geosynthetics is used inside of the embankment to maximize the arching effect transmitting the load of the embankment to the top of the piles. But, PHC piles that are generally used for bridge structures are also applied as the pile supporting the load of embankment concentrated by the effect of the Geosynthetics. That is very low efficiency in respect of pile material. So, in this study, the cast in place concrete pile was selected as the most suitable pile type for supporting the embankment by a case study and the optimum mixing condition of concrete using a by-product of industry was induced by performing the mixing designs and the compressive strength designs. And it is shown that the cast in place pile with the optimum mixing condition using the by-product of industry is 2.8 times more efficient than the PHC pile for the purpose of Pile Supported Embankment by the finite element analysis method.

Study on the Shape Review of Rail Web-damper for Simulation of Rail Vibration Mode (레일 진동모드 해석을 통한 레일 웹댐퍼 형상 검토에 관한 연구)

  • Kim, Jin-Ho;Kim, Kyoung-Min;Lee, Kwang-Do
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2866-2869
    • /
    • 2011
  • Concrete track to increase R&D compared to the existing gravel track 3dB(A) over the growing problem of noise has been raised. Accordingly, the noise reduction solutions for reducing the vibration of the rail that you want to reduce the noise of the concept is to develop the rail web-damper. For this purpose, first, that occurs while driving the train to simulate the vibration modes of rail vibration part of the main draw for this part of the effective vibration reduction to be made, a review of various shapes to try.

  • PDF

The study of absorbing material performance for the noise mitigation of slab track (슬래브궤도의 소음저감을 위한 흡음재의 성능에 관한 연구)

  • Kim, Jin-Ho;Lee, Kwang-Do;An, Gang-Yell;Jun, Woo-Sang
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1044-1049
    • /
    • 2007
  • The construction of concrete slab track system is increased because the system has advantages which are maintenance free and so on, the other side, the system has weak points such as increase of the cost of the early stage construction and noise levels. The increment of noise is due to the reflection of generated noise on the slab tracks. Therefore the acoustic-absorptive materials are considered to reduce noise level. It has been made clear that acoustic-absorptive materials are effective for reducing the wheel/rail noise on slab tracks. The important performance of the acoustic-absorptive material is absorption rates and absorption rates are verified for the considered absorber elements using acoustic duct method. In addition, the required provisons for installing acoustic-absorptive block on slab tracks are considered.

  • PDF

Verified 20-car Model of High-speed Train for Dynamic Response Analysis of Railway Bridges (검증된 고속철도 차량의 20량편성 정밀모형에 의한 철도교량의 동적응답 분석)

  • 김상효;김병석;허진영;최성락
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.10a
    • /
    • pp.485-492
    • /
    • 2001
  • The dynamic analysis model is developed with the high-speed train (KTX) and a 2-span continuous prestressed concrete box girder bridge with a double track. The analytical results are compared with the dynamic field test results and found to be valid to yield quite accurate dynamic responses. The various trainset models with different number of cars are developed and compared with the results of the regular 20-car trainset model. It is concluded that the reduced trainset models, such as 7-car and 10-car models, cannot exactly produce the dynamic responses of bridges, especially when the train speed is high. Under the coincidence condition of two trains traveling with resonance velocity in the opposite directions, it is found that the impact factor under two-way coincidence is three times larger than that under one-way traffic. Consequently, for the bridge with a double-track it is necessary to check not only the dynamic responses of the bridge with one-way traffic but those with two-way coincidence.

  • PDF

A Study on the Anti-Vibration Characteristics of the Under Sleeper Pad (방진침목패드의 방진특성에 관한 연구)

  • 황선근;엄기영;고태훈;오상덕
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.369-374
    • /
    • 2001
  • It was estimated that the anti-vibration measures at the source location of railroad are the most active and effective ones. Among CWR(Continuously Welded Rail), elastic rail fastener, floating slab, ballast mat, under sleeper pad, etc. like these various kinds of measures in the source, under sleeper pad as an anti-vibration measure was constructed at the railroad track supporting structures in the Jeon-la Line. In this study, through the field measurement of vibration at the railroad track supporting structures and nearby the ground, the vibration reduction effect of under sleeper pad were evaluated by insertion loss. As a result, vibration reduction effects were 5.0∼12.5㏈ on the concrete slab of the bridge, 3.9∼7.5㏈ on the ground nearby the bridge respectively.

  • PDF

A Study on the Supportive Stiffness in Transitional Zones through Moving Load-Based Three-Dimensional Modeling (이동하중과 3차원 모델링을 통한 접속부 지지강성연구)

  • Woo, Hyeun-Joon;Lee, Seung-Ju;Kang, Yun-Suk;Cho, Kook-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1542-1549
    • /
    • 2011
  • The Transitional zone between bridge abutment and earthwork is one of the representative vulnerable zones in railway where differential settlements may take place due to the different supportive stiffness. Although transitional zones are managed with stricter standards than those of the other earthwork zones either in the design and construction stages, it is very difficult to prevent differential settlement perfectly. A three-dimensional numerical analyses were performed by applying train moving load in this study. The analytical model including abutments and earthwork zones was constituted with rail, sleepers, track concrete layer (TCL), hydraulic stabilized base (HSB), reinforced road bed, and road bed using railway and road base structure. The clamp connecting the rail and sleeper were also modeled as the element with spring coefficient. The train wheel is modeled in the actual size and moved on the rail with 300 km/hr speed. The deformation characteristics at each point of the rail and the ground were considered in detail when moving the train wheel. The analysis results were compared with those from the two-dimensional analysis without considering moving load. The research results show that displacement and stress were greater in the three-dimensional analysis than in other analyses, and the three-dimensional analysis with moving load should be performed to evaluate railway performance.

  • PDF

A Study on the tension of Geogid on Pile-supported Construction Method (성토지지말뚝공법 중 섬유보강재의 인장력 검토에 관한 연구)

  • Moon, In-Ho;Park, Jong-Gwan;Lee, Il-Wha
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.905-917
    • /
    • 2008
  • Road or Railway construction over soft ground is needed to be considered on secondary consolidation which will be caused differential settlement, lack of transport serviceability, higher maintenance cost. Especially for the railway construction in the second phase of Gyung-Bu or Ho-Nam high speed railway, concrete slab track has been adapted as a safe and cost effective geotechnical solution. In this case controlling the total settlement under the tolerance is essential. And pile supported geogrid reinforced construction method is suggested as a solution for the problem of the traditional method on soft soil treatments. Pile supported geogrid reinforced construction method consists of piles that are designed to transfer the load of the embankment through the compressible soil layer to a firm foundation. The load from the embankment must be effectively transferred to the piles to prevent punching of the piles through the embankment fill creating differential settlement at the surface of the embankment. The arrangement of the piles can create soil arching to carry the load of embankment to the piles. In order to minimize the number of piles geogrid reinforced pile supported construction method is being used on a regular basis. This method consists of one or more layers of geogrid reinforcement placed between the top of the piles and the bottom of the embankment. This paper presents several methods of pile supported geogrid reinforced construction and calculation results from the several methods and comparison of them.

  • PDF

Relationship between Crack Propagation Depth and Crack Width Movement in Continuously Reinforced Concrete Slab Systems (연속철근 콘크리트 슬래브 시스템의 균열진전 깊이와 균열폭 거동 관계 분석)

  • Cho, Young Kyo;Kim, Seong-Min;Oh, Han Jin;Choi, Lyn;Seok, Jong Hwan
    • International Journal of Highway Engineering
    • /
    • v.17 no.1
    • /
    • pp.83-90
    • /
    • 2015
  • PURPOSES : The purpose of this study is to investigate the relationship between the crack propagation depth through a slab and crack width movement in continuously reinforced concrete slab systems (CRCSs). METHODS : The crack width movements in continuously reinforced concrete pavement (CRCP) and continuously reinforced concrete railway track (CRCT) were measured in the field for different crack spacings. In addition, the crack width movements in both CRCP and CRCT were simulated using finite element models of CRCP and CRCT. The crack width movements, depending on the unit temperature change, were obtained from both the field tests and numerical analysis models. RESULTS : The experimental analysis results show that the magnitudes of the crack width movements in CRCSs were related to not only the crack spacing, but also the crack propagation depth. In CRCP, the magnitudes of the crack width movements were more closely related to the crack propagation depths. In CRCT, the crack width movements were similar for different cracks since most were through cracks. If the numerical analysis was performed to predict the crack width movements by assuming that the crack propagates completely through the slab depth, the predicted crack width movements were similar to the actual ones in CRCT, but those may be overestimated in CRCP. CONCLUSIONS : The magnitudes of the crack width movements in CRCSs were mainly affected by the crack propagation depths through the slabs.

Study on Optimal Design of Traverse Switch System for Maglev Train (자기부상열차용 트레버스 분기기 최적설계 연구)

  • Lee, Younghak;Kim, Chang-Hyun;Lee, Jong-Min
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.6
    • /
    • pp.717-726
    • /
    • 2016
  • Emergency tracks are necessary in case a broken down train evacuates, a train needs to make way for a faster train behind it, or a train suddenly stops and following trains must avoid colliding with it. Magnetic Levitated (maglev) Trains can change track to enter an emergency track using a segmented switch or a traverse switch. On a traverse switch, a train can change its track when the part of the track that the train is on moves to the other track. Currently manufactured Maglev trains have two bodies and the total length is 25 meters. If a traverse switch is used, it will only require 30 meters of track to move the train to the other track, so, when it comes to efficiency of costs and space, the traverse switch surpasses the articulated switch. Therefore, in this paper, an optimized design to secure structural safety and weight lightening is suggested. To achieve these results, the heights of the piled concrete and girders which are both placed on the top of the traverse switch, are set as design variables. The Finite Element Method (FEM), in application of kriging and in the design of the experiments (DOE), is used. Maximum stress, deformation, and structural weight are compared with the results, and through this process structural safety and weight lightening is proven.