• 제목/요약/키워드: Combined cycle power plant

Search Result 196, Processing Time 0.024 seconds

A Study for the Optimal Operating Conditions of the Gas Turbine Based Combined Cycle Cogeneration Power Plant (가스터빈 복합 열병합 발전의 최적 운전조건에 관한 연구)

  • Cho, Young-Bin;Sohn, Jeong-Lak;Ro, Sung-Tack
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.28 no.12
    • /
    • pp.1582-1590
    • /
    • 2004
  • The purpose of this study is to show the existence of optimal operation conditions for minimum fuel consumption of the gas turbine based combined cycle cogeneration power plant. Optimal operational condition means the optimal distribution of the power generated by each gas turbine and the heat generated by each HRSG. Total fuel consumption is calculated by the sum of the fuels for gas turbines and supplementary boiler. Fuel consumption is calculated by numerical methods of energy equations which contain the power generated from gas and steam turbines, the heat generated by HRSG and the heat extracted from high pressure steam turbine.

A Study on the Bidding Strategies of Combined Cycle Plants in a Competitive Electricity Market (경쟁적 전력시장에서 복합화력발전의 입찰전략에 대한 연구)

  • Kim, Sang-Hoon;Lee, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.4
    • /
    • pp.694-699
    • /
    • 2009
  • Combined cycle plants which feature distinct advantages for power generation such as fast response, high efficiency, environmental friendliness, fuel flexiblity represent the majority of new generating plant installations across the globe. Combined cycle plants have different operating modes where the operating parameters can differ greatly depending which mode is operating at the time. This paper addresses the bidding strategy model of combined cycle plants in a competitive electricity market by using a characteristic of multiple operating modes of combined cycle plants. Simulation results of case studies show that an operating mode among multiple ones is selected strategically in generation bidding for more profit of generation company.

Evaluation of Performance and Economics of Organic Rankine Cycle Integrated into Combined Cycle Cogeneration Plant (복합열병합발전소에 적용된 유기랭킨사이클의 성능 및 경제성 평가)

  • Kim, In Seop;Kim, Chang Min;Kim, Tong Seop;Lee, Jong Jun
    • The KSFM Journal of Fluid Machinery
    • /
    • v.20 no.1
    • /
    • pp.41-47
    • /
    • 2017
  • This study aimed to analyze organic Rankine cycle(ORC) which recovers discarded heat from a gas turbine based combined cycle cogeneration(CC-cogen) plant in terms of both performance and economics. The nominal electric power of the CC-cogen plant is around $120MW_e$, and heat for district heating is $153MW_{th}$. The major purpose of this study is to compare various options in selecting heat source of the ORC. Three heat sources were compared. Case 1 uses the exhaust gas from the HRSG, which is purely wasted to environment in normal plant operation without ORC. Case 2 also uses the exhaust gas from the HRSG. On the other hand, in this case, the DH economizer, which is located at the end of the HRSG, does not operate. Case 3 generates power using some of the district heating water which is supplied to consumers. The estimated ORC power generation ranges between 0.3 to 2.3% of the power generation capacity of the CC-cogen plant. Overall, Case 3 is evaluated to be better than other two options in terms of system design flexibility and power generation capacity.

Thermodynamic Performance Evaluation of an Integration Design between the Combined-cycle and Air Separation Unit in an IGCC Power Plant (IGCC 발전 플랜트에서 복합발전공정-공기분리장치의 연계에 관한 열역학적 성능 평가)

  • Won, On Nu-ri;Kim, Hyun-jeong;Park, Sung-koo;Na, Jong-moon;Choi, Gyung-min;Kim, Duck-jool
    • 한국연소학회:학술대회논문집
    • /
    • 2012.11a
    • /
    • pp.49-51
    • /
    • 2012
  • In this paper, the integration issue, such as an air-side integration design between the gas turbine and air separation unit, is described and analyzed by the exergy and energy balance of the combined-cycle power block in an IGCC power plant. The results showed that the net power of the system was almost same, but that of the gas turbine was decreased as the integration degree increased. The highest exergy loss was occurred in the combustor of gas turbine, which was affected by the chemical reaction, heat conduction, mass diffusion, and viscous dissipation.

  • PDF

Performance Analysis of the Integrated Gasification Combined Cycle Power Plant with Steam Integration (증기연계 공정을 가지는 석탄가스화 복합발전플랜트의 성능해석)

  • Lee, Chan
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.1
    • /
    • pp.43-50
    • /
    • 2009
  • Waste heat recovery process designs and performance analyses are conducted on the IGCC(Integrated Gasification Combined Cycle) power plants integrated with two different coal gasification and gas cleanup processes by Shell and GE/Texaco. Through the analysis results, the present study provides the steam integration concept between the HRSG and the chemical processes of IGCC power plant, and investigates the effect of steam integration on the power generation of IGCC power plant. The present simulation results show less steam power output and higher overall IGCC efficiency of the Shell-based power plant than the GE/Texaco.

A Study on the Cost Function Based on Operating Modes for Combined Cycle Power Plant (복합화력발전기의 운전조합별 비용함수에 관한 연구)

  • Lee, Jaehee;Yoon, Hyeok-Jun;Oh, Chang-Jin;Noh, Yu-Rim;Joo, Sung-Kwan;Ryu, Sangmin;Wi, Young-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.3
    • /
    • pp.358-364
    • /
    • 2018
  • In this study, the theoretical methodology is presented for estimating cost function based on operating modes for Combined Cycle Power Plant. The proposed method has estimated cost functions using the relationship between the gas turbine heat input and the output ratio of the steam turbine. In order to verify the proposed method, a regression analysis was performed using the single cost function estimated by the existing performance test method and the cost function for each operating mode estimated by the proposed method. The results of case studies using the 2016 generator input and output data are presented to show the effectiveness of the proposed method.

Study on The Preventive Structure of field Lead Connector's V-Notch on Synchronic (동기발전기 회전자 계자접속부의 예각변형 방지구조에 관한 연구)

  • Cho, Ji-Won;Cho, Chang-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.937-939
    • /
    • 2000
  • The preventive structure of field lead connector's V-notch on synchronous generator has been developed. The preventive structure of field lead, installed in the generator, prevent from V notch of field lead connector in rotor on daily start and stop (on-line). This development of study was performed at the Seoinchon combined cycle power plant on gas turbine generator. This preventive structure of field lead will be prevent from V-notch of field lead on synchronous generator's field.

  • PDF

Analysis of the Influence of Post-Combustion $CO_2$ Capture on the Performance of Fossil Power Plants (후처리를 이용한 $CO_2$ 포집이 화력 발전설비 성능에 미치는 영향 해석)

  • Tak, Sang-Hyun;Kim, Tong-Seop;Chang, Young-Soo;Lee, Dae-Young;Kim, Min-Sung
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.8
    • /
    • pp.545-552
    • /
    • 2010
  • Research and development efforts to reduce $CO_2$ emission are in progress to cope with global warming. $CO_2$ emission from fossil fuel fired power plants is a major greenhouse gas source and the post-combustion $CO_2$ capture is considered as a short or medium term option to reduce $CO_2$ emissions. In this study, the application of the post-combustion $CO_2$ capture system, which is based on chemical absorption and stripping processes, to typical fossil fuel fired power plants was investigated. A coal fired plant and a natural gas fired combined cycle plant were selected. Performance of the MEA-based $CO_2$ capture system combined with power plants was analyzed and overall plant performance including the energy consumption of the $CO_2$ capture process was investigated.

Comparative Part Load Performance Analysis of Gas Turbine Power Generation Systems Considering Exhaust Heat Utilization (배열 이용도를 고려한 가스터빈 발전시스템의 부분부하 성능 비교분석)

  • Kim, T. S.
    • 유체기계공업학회:학술대회논문집
    • /
    • 2002.12a
    • /
    • pp.290-297
    • /
    • 2002
  • This paper presents analysis results for the effect of power control strategies on the part load performance of gas turbine based power generation systems utilizing exhaust heat of the gas turbine such as cumbined cycle power plants and regenerative gas turbines. For the combined cycle, part load efficiency variations were compared among different single shaft gas turbines representing various technology levels. Power control strategies considered were fuel only control and IGV control. It has been observed that gas turbines with higher design performances exhibit superior part load performances. Improvement of part load efficiency by adopting air flow modulation was analyzed and it is concluded that since the average combined cycle performance is affected by the range of IGV control as well as its temperature control principle, a control strategy appropriate for the load characteristics of the individual plant should be adopted. For the regenerative gas turbine, it is likewise concluded that maintaining exhaust temperature as high as possible by air flow rate modulation is required to increase part load efficiency.

  • PDF

Performance Analysis of Gas Turbine for Large-Scale IGCC Power Plant

  • Joo, Yong-Jin;Kim, Mi-Yeong;Park, Se-Ik;Seo, Dong-Kyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.415-419
    • /
    • 2016
  • As the need for clean coal technology has grown, so has the global research and development efforts into integrated gasification combined cycle (IGCC) plants. An IGCC plant couples a gas turbine to a gasification block. Various technical and economic problems exist in designing such a system. One such problem is the difficulty in realizing economies of scale because the single-train flow capacity of commercial IGCC synthetic gas turbine plants is limited; the capacity does not exceed a net power rating of 300 MW. To address this problem, this study modeled and simulated a synthetic gas turbine with the goal of evaluating the feasibility of a 500 MW or larger IGCC plant. First, a gas turbine with the best output and efficiency was chosen for use with natural gas. The turbine was modeled using GateCycle (a simulation tool), and the integrity of the model validated by comparing the result to the design value. Next, off-design modeling was carried out for a gas turbine with synthetic gas based on its on-design model, and the result was compared with the study result of the gas turbine manufacturer. The simulation confirmed that it is possible to create a large capacity IGCC plant by undertaking the remodeling of a gas turbine designed to use natural gas into one suitable for synthetic gas.