1 |
Kim, S. J. and Ro, S. T., 1997, 'The Performance Analysis of a Single and Dual Pressure HRSG,' Proceeding of the KSME Spring Annual Meeting B, pp. 7-12
|
2 |
Yokoyama, R., Ito, K. and Matsumoto, Y., 1991, 'Optimal Sizing of a Gas Turbine Cogeneration Plant in Consideration of Its Operational Strategy,' ASME COGEN-TURBO, IGTI, Vol. 6, pp. 363-370
|
3 |
Gyarmathy, G., 1989, 'On Load Control Methods for Combined Cycle Plants,' ASME COGEN-TURBO, IGTI, Vol. 6, pp. 39-50
|
4 |
Kim, T. S., 1995, 'Design and Performance Analysis of Gas Turbines with Applications to Cogeneration Systems,' Ph. D. Thesis, Seoul National University
|
5 |
Kim, J. H., 2000, 'Analysis on Transient Behavior of Gas Turbines for Power Generation,' Ph. D. Thesis, Seoul National University
|
6 |
Ito, K., Yokoyama, R., Akagi, S. and Matsumoto, Y., 1990, 'Influence of Fuel Cost on the Operation of a Gas Turbine-Waste Heat Boiler Cogeneration Plant,' Transactions of the ASME, Journal of Engineering for Gas Turbine and Power, Vol. 112, pp. 122-128
DOI
|