Various organizational factors effect successful implementation of IT enabled business transformation. Among them, the most critical success factor is deemed to overcoming change management problem. Lots of studies have been made on implementation methodologies and business process formalizations to encourage organizational members to accept new business process changes. However, the logic of process redesign still depends on qualitative problem solving techniques mostly depending on basically human intuition such as brainstorming, cause-and-effect analysis, and so on. In this paper, we develop algorithmic procedure applicable to designing various business process changes such as process automation, business process resequencing, and more radical process integration. The framework is employed from dynamic programming approach in the literature, which is based on the decision making paradigm of organizations to abstract business processes as quantitative decision models. As such, our research can fill the gap of limited development of theory based analytic methodologies for business process design, by providing objective rationale to reach the consensus among the organizational members including senior management.
Journal of the Korean Operations Research and Management Science Society
/
v.12
no.1
/
pp.19-26
/
1987
In analyzing time series, estimating the level or the current mean of the process plays an important role in understanding its structure and in being able to make forecasts. The studies the class of time series models where the level of the process is assumed to follow a random walk and the deviation from the level follow an ARMA process. The estimation and forecasting problem in a Bayesian framework and uses the Kalman filter to obtain forecasts based on estimates of level. In the analysis of time series, we usually make the assumption that the time series is generated by one model. However, in many situations the time series undergoes a structural change at one point in time. For example there may be a change in the distribution of random variables or in parameter values. Another example occurs when the level of the process changes abruptly at one period. In order to study such problems, the assumption that level follows a random walk process is relaxed to include a major level change at a particular point in time. The major level change is detected by examining the likelihood raio under a null hypothesis of no change and an alternative hypothesis of a major level change. The author proposes a method for estimation the size of the level change by adding one state variable to the state space model of the original Kalman filter. Detailed theoretical and numerical results are obtained for th first order autoregressive process wirth level changes.
This paper considers a recent environment in the manufacturing process in which data in large amounts can be obtained on-line in real-time. Under this environment an on-line real-time Statistical Process Control (SPC) scheme equipped with detection of a process change, change-point estimation, and recognition of the change pattern is proposed. The proposed SPC scheme is composed of a Cusum chart, filtering methods and Akaike Information Criterion (AIC). We examine the performance of this scheme by Monte Carlo simulation and show its usefulness.
Business Process Management (BPM) is an emerging trend of managing business process life cycles and integrating heterogeneous systems . Recently, BPM is considered as an essential element for automation of complex business processes involving many companies, particularly for those in an e-Business environment. In such an environment, it is very important for each business partner to trace history of resources. However, it has been a difficult problem for Workflow Management Systems(WFMSs) to support management of resource changes because of limited storage, complex process structure, and absence of formal change model. In this paper. a new framework is proposed, which can support change management for documents, one of core resources of business process. Under a traditional WFMSs framework, all workflow components belong to either build-time or run-time function, and executions of workflow processes are performed by the two functions . To manage changes of documents while process executing. a new framework with additional component modules are required. A version control method is introduced for the purpose of managing document changes. The proposed method includes five models for document structure, process structure, association between process and document, version management, and efficient version storage. A prototype system is developed to demonstrate the effectiveness of the proposed models.
Process change and modification, which are caused by process failure, equipment life cycle and economic environment, have been generated in the chemical plants. And the MOC (management of change) base on the reasonable process safety technology such as change judgment, hazard identification by accurate technical references and risk assessment. But it is difficult to carry out the MOC because of lack of experience, shortage of knowledge and none of process safety specialists. In this study, the MOC system which could make enhancement of safety by finding and complementing weakness of MOC in chemical facilities was developed. This developed MOC system based on QRA was recommended the obvious standard for decision-making process, MOC procedure based on risk assessment and risk estimation of the process modification. The study based on the above way sought the enhancement of safety by performing Risk Based MOC for chemical plants.
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.1D
/
pp.81-89
/
2009
CM(Configuration Management) is a field of management that focuses on establishing and maintaining consistency of a product's performance and its functional and physical attributes with its requirements, design, and operational information throughout its life. Recently upcoming concept of CM, regardless of various definitions, consists of the organization and the process for value creation through project change management, value preservation by Risk, Project Management implementation by Change management. The CM provide a basis for, and a record of, the project's performance in meeting the scope, time, cost. Overseas international companies have already adopted the CM system and enjoyed the benefits arising from such systems. And the CM provides perspectives and insights applicable to all types of projects. This study presents the review on the current systems now in use at jobsites and known to be efficient, and the introduction and application of configuration systems now at big issue. Hereby indicates the connective system consisted of work process, change control and knowledge referring to the methods and actual cases as an effective promotion of CM.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.365-366
/
2023
The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.
Korean Journal of Construction Engineering and Management
/
v.15
no.2
/
pp.79-86
/
2014
Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.
BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.
Journal of the Korean BIBLIA Society for library and Information Science
/
v.33
no.4
/
pp.49-72
/
2022
This study based on the 8-step strategy model for change management proposed by J. P. Kotter, tried to check the perception and experience about change management of the librarians at National Library of Korea. Also this study aimed to figure out the understanding of each 8-step strategy model. To this end, the concept and process of change management were presented through literature analysis, and survey was conducted targeting 58 librarians of the National Library of Korea. This study drews five results. First, the majority of librarians at National Library of Korea do not know about change management, and they do not have experience in using change management techniques. Second, the period required for the 8-step change management process is 5 years. Third, during the change management stage, librarians' awareness of the importance of stages 4 and 3 was high. Fourth, there is no difference in the librarians' perceptions of change management by gender, education, major, and tasks. Fifth, there is a significant difference in the age and service years of the librarian in the 3rd, 4th, and 7th stages of change management. Also there is a significant difference in the position of the librarian at the 1st and 3rd stage of change management, and between librarians' department and 1st stage of change management. The findings and results of this study can not only raise awareness of change management but also suggest organizational responses to change at individual or organizational level.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.