1 |
Brad Hardin (2009). BIM and Construction Management: Proven Tools, Methods, and Workflows, Sybex.
|
2 |
Eom, B. H., Kim, Y. H., Lee, Y. C., Min, D. S., R, J. H. (2017). Proposal of Material Takeoff Method Using the Object Concept of general 3D Modeling Tool, KIBIM annual conference, pp. 71-72.
|
3 |
Eom, J. U. (2010). A Study on the Automation System of Structural Detail Design and Modeling Process based on BIM for Steel Structures, Master thesis, The graduate school, Tongmyong University.
|
4 |
Jo, D. G., (2015). Hidden Values in BIM, Korean Journal of Construction Engineering and Management, Vol.16 No.5.
|
5 |
Kim, J. U. (2016). A Study on the Quantity Take-Off the Structural Members related to the Schedule by utilizing OpenBIM, Master thesis, The graduate school, Tongmyong University.
|
6 |
Kim, J. U., Shin, T. S. (2015). Feasibility of application of OpenBIM between structural analysis and architectural design, KIBIM annual conference, Vol.5, No.1.
|
7 |
Kim, J. U., Shin, T. S. (2015). Process planning and quantity take-off related to the schedule by utilizing the Open BIM, Proceedings of the 2015 Annual Conference of the Busan- Ulsan- Gyeongnam Chapter of Architecture Institute of Korea.
|
8 |
Lee, J. G., Lee, H. S., Park, M., Jung, M. (2013). A Framework Integrating Cost and Schedule based on BIM using IFC, Korean Journal of Construction Engineering and Management, Vol. 14 No. 3.
|
9 |
Lee, J. H. (2017). BIM based Reinforced Concrete Work Quanti ty and Cost Est imate Method, KIBIM annual conference, pp. 69-70.
|
10 |
Lee, K. (2010). Social network analysis of BIM collaboration, Master thesis, The graduate school, Yonsei University.
|
11 |
Moon, Y. N., Kwon, B. R. (2017). Schedule(4D) and Cost(5D) implementation using BIM integrated data, KIBIM annual conference, pp. 59-60.
|
12 |
Navisworks, http://www.autodesk.co.kr/Products/navisworks/overview, 2017.12.28.
|
13 |
Tekla Structures, http://www.tekla.com/, 2017.12.28.
|