Appropriate Rate for Estimating Safety Management Cost in Civil Work (토목공사 안전관리비 적정요율 산정)

  • Son, Ki-Sang;Lee, Gi-Tae;Park, Jong-Keun;Park, Jung-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.73-84
    • /
    • 2006
  • Standard safety management cost system was established in 1988 as a decree Number of 88-13, first time. And then, it has been revised fourteen times, up to now. A lot of practical investigations have been made for the revision but many problems at sites are continued to be put out so that it should be revised. This study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. Budget and actually performed amount of safety management costs in this study are investigated. costs for temporary work which is clarified in Japan is collected in order to compare domestic cost rate with Japanese one related to the total project amount. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

Optimization of Estimating Duration of the Structural Frame for the High-rise Apartment Housing during the Winter season -Focusing on One Cycle Time Scheduling Mechanism of the Typical Floor- (동절기 아파트 골조공사의 적정공기 산정에 관한 연구 - 기준층 사이클 공정분석을 중심으로 -)

  • Bang Jong-Dae;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.170-178
    • /
    • 2004
  • Public construction companies have strictly followed a rule that they should not work in the wet area such as structural frame for a certain period during the winter season. It is usually known that the non-working period during the winter causes increase of the project duration, and the project cost escalation. Also, it makes negative effects on national economy because it reduces workers income. Therefore, the site work for the structural frame should be performed even during the whiter season. But the site work for the structural frame during that period cannot proceeds in the same way as during other periods, and requires a different method for estimating project duration. Through an analysis of time scheduling mechanism, actual working days are obtained for 1 cycle of typical floors in the structural frame during these periods, and non-working days of 5 years average are calculated based on calendar day using data of 5 years weather forecasts for that season. This study proposes an optimized way of estimating project duration for 1 cycle of typical floors in the structural frame during these periods. This estimating method uses the combined actual working days and non-working days of 5 years' average, and the estimated results are confirmed by being compared with field data. This study is expected to be used in estimating the construction duration of the structural frame during the winter season.

Analysis and Suggestion of Environment-friendly Interior Finishing Materials for Aged Apartment Remodeling (노후 공동주택 리모델링의 친환경 실내 마감재료 분석 및 제안)

  • Kim, Ki-Hyun;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.118-126
    • /
    • 2007
  • Environmentally Sound and Sustainable Development (ESSD)" is a key word in recent years. The construction industry, have put a great influence on ergonomic and sustainable environment. Recently, "green building certifications", such as Indoor Air Quality (IAQ) and eco-friendly material regulation have been established. With this regard, new construction and aged-housing remodeling projects are required to meet these certification criteria. Apartment residents have great concern on eco-product, since many cases are reported that Sick Building Syndrome is caused by toxic substance from building materials. Aged-housing remodeling construction has a unique characteristic in that the residents are already determined prior to construction execution. Therefore, the analysis of resident's need for building materials in aged-housing remodeling is relatively easy compared to new building construction. As such, it is very important to analyze their preferences for eco-friendly materials prior to project execution. The purpose of this study is to find the needs of residents and priority of their needs. Based on their needs and priority, this paper provides a new strategy in using environment-friendly materials and maximizing their satisfaction level when aged housing remodeling is constructed. In addition, this paper provide new criteria in selecting new developed environmental materials in remodeling projects for the purpose of improving the safety and health level in construction industry.

Analysis of Sunshine Amount for Education Environment according to Installation of Apartment Structures (아파트 구조물 설치에 따른 교육환경 일조량 분석)

  • Jang, Ho-Sik
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.2
    • /
    • pp.117-124
    • /
    • 2012
  • Due to recent urban maintenance project for the aged towns, the reconstruction of apartments into super-high-rise and high-rise apartment structures has been approved for concentrated use of land, and accordingly the infringement on sunshine for nearby residential area is rising as a social issue. Especially the educational environment conditions according to infringement on sunshine in educational facilities are posing many problems. Accordingly in this study, for such sunshine analysis of educational environment, Auto $CAD^{(R)}$ software has been used to construct the 3D model for the educational facility structures. And with the simulation technique, the windows and the schoolyard of the education facility were set to be the lighting standard surface to take measurements for the sunshine environment of the educational facilities by the minute from 8:00AM until 4:00PM for the sunshine amount by true solar time according to the movement of the sun. Also, the sunshine environment of the education facility according to the damage before/after new construction of apartments was charted, and through comparison with the video produced by sun shadow projection method, the sunshine amount of the educational environment could be verified. In future, it is expected to be efficiently used in the sunshine analysis of education environment utilizing such simulation techniques.

Analysis of the Economic Efficiency of the District Heating and Gas Engine Co-Generation System Compared with the Central Heating System (중앙난방방식을 지역난방과 소형열병합난방 방식으로 전환 시 경제성 비교 분석)

  • Kim, Kyu Saeng
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.10
    • /
    • pp.544-551
    • /
    • 2015
  • This study was conducted to determine the LCC of apartment complexes with district heating and a cogeneration system. For the purpose of analyzing LCC according to the size of the apartment complex, 500, 1,500, and 4,000-unit model apartments were selected. Analysis was performed on the design of the heating system and the life cycle cost including total construction cost, maintenance and operation cost for the duration of the project period (15 years). According to the calculated results, 1) The initial cost of the cogeneration system for 500, 1,500, and 4,000-unit apartments is higher than that of the district heating system by 20%, 13%, and 12%, respectively. 2) In the case of the cogeneration system, the payback period by electric generation was found to be 5.21, 4.92 and 4.47 years, and saving cost was calculated to be 29 billion won, 94 billion won and 262 billion won after the payback period for 500, 1,500, and 4,000-unit apartments, respectively. 3) The LCC values of the cogeneration system were 1.12, 1.07 and 1.06 times larger than those of the district system according to the size of the apartment complex. In this study, the district heating system was found to be more efficient than the cogeneration system in terms of LCC reduction. 4) District heating is affected by fuel bills, so energy efficiency should be improved through recovering waste heat (incineration heat, etc.). Also, district cooling should be provided according to heat use to keep the temperature high in winter and low in summer.

A Study on Reconstruction and Remodeling's Selection Factors of Old Apartment Houses Using PROMETHEE-AHP (PROMETHEE-AHP 기법을 이용한 노후 공동주택의 재건축과 리모델링 사업선택요소 선정에 관한 연구)

  • Yoo, Seung-Min;Kwon, Oh-kyung;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.77-85
    • /
    • 2019
  • Reconstruction and remodeling have been introduced as a part of renewal (redevelopment) projects for old apartments built after the mid-1970's and government policies for revitalizing each project has been changed continually. However, the frequent changes of the policies have caused conflicts among business entities in selecting business methods. The conflicts from their early stages have made serious problems in the entire business process. Therefore, this study deduced factors of business selection by applying comparison analysis between the two business projects on how certain factors have an influence on selecting reconstruction and remodeling business projects. Based on the analysis, four categories and 26 factors were finally selected. After then, the priority of each selection factor was deduced through the AHP method and PROMETHEE method used for analysis of relative importance and impact values regarding to the business selection.

PARKING GUIDE AND MANAGEMENT SYSTEM WITH RFID AND WIRELESS SENSOR NETWORK

  • Gue Hun Kim;Seung Yong Lee;Joong Hyun Choi;Youngmi Kwon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1278-1282
    • /
    • 2009
  • In apartment type of housing, if resident's vehicle is registered in central control office and RFID TAG is issued, identification can be recognized from the time of entrance into parking lot and intelligent parking guide system can be activated based on the residents' profile. Parking Guide System leads a vehicle to the available parking space which is closest to the entrance gate of the vehicle's owner. And when residents forget where they parked their cars, they can query to the Parking Guide and Management System and get responses about the location. For the correct operation of this system, it is necessary to find out where the residents' cars have parked in real time and which lot is available for parking of other cars. RFID is very fancy solution for this system. RFID reader gathers the ID information in RFID TAGs in parked cars and updates the DB up to date. But, when non-residents' cars are parked inside apartment, RFID reader cannot identify them nor know the exact empty/occupied status of parking spaces because they don't react to RFID reader's query. So for the exact detection of empty/occupied status, we suggest the combined use of ultrasonic sensors and RFID. We designed a tree topology with intermediate data aggregators. The depth of tree is normally more than 3 from root (central office) to leaves (individual parking lots). The depth of 2 in tree topology brings about the bottleneck in communication and maintenance. We also designed the information fields used in RFID networks and Sensor Networks.

  • PDF

Improvement of Calculating Method of the Officially Assessed Individual House Price of Aged Apartment Remodeling Reflecting Feasibility Analysis (사업성분석을 반영한 공동주택 맞춤형 리모델링의 공시가격 산정방법 개선)

  • Bae, Byungyun;Kim, Kyungrai;Shin, Dongwoo;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.89-97
    • /
    • 2017
  • The number of Aged Apartment units is expected to increase as time went on. Living standards are getting better and they want a new apartment space as the economy progresses. Therefore, it is necessary to prepare for the increasing remodeling market through the feasibility evaluation method that can be applied to the remodeling project of the apartment house. The purpose of this study is to analyze the social pricing factors affecting the Officially assessed individual House Price for the analysis model of commercial house remodeling. The collected samples were analyzed using multiple regression analysis of 350 prices included in 127 lots. Middle school level, high school level, total number of households, and floor area ratio were extracted. As a result of comparing the Officially assessed individual House Price by applying to the remodeling case, the difference between the existing Officially assessed individual House Price and the improvement Officially assessed individual House Price is different. The accessibility with the subway station is included in the land price, and there is no change in the number of stories and directions because it is customized remodeling. There was a difference in the disclosure price depending on the type of factor extraction by the evaluator in a batch application of the disclosure price factors. The research can be used as a model for future remodeling business feasibility analysis.

A Study on the Improvement of the Quality Management in Apartment Construction Projects (공동주택 현장의 품질관리 개선에 관한 연구)

  • Moon Hyeon;Wang Ilkook;Chin Sangyoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.373-378
    • /
    • 2001
  • In order to analyze the problems and improvement methods in the quality management of domestic apartment construction projects, this study derived the four barrier factors through relevant literature survey and interviews with construction practitioners. Among these four factors, which are 1) policies and regulations, 2) technologies, 3) human and organization, and 4) other miscellaneous aspects, the human and organization factor is the main focus of this survey and it was decomposed into perception, management system, education, and system on quality management according to the Taguchi's S/N theory to survey existing problems and suggest improvement methods for them. The survey on the quality perception showed that all the members need to cooperate actively, and CEO and chief construction managers should recognize the quality as the highest priority and act by themselves accordingly. The survey on the quality management showed that they need to reform their business process to reduce redundant tasks and miscommunications among participants. Quality education should be provided in a way that people at different management level can be educated differently with close relation to their practices. Quality systems should help corrective actions against quality problems at construction fields. Also with clear quality management implantation polices and objectives, the quality system should be established in order to support better communication among project stakeholders.

  • PDF

Feasibility Study on Remodeling Project By Using Real Option Model : Focusing on Apartment House Remodeling (실물옵션을 활용한 공동주택 리모델링 사업성 평가에 관한 연구 - 아파트 리모델링 사례를 중심으로 -)

  • Yeon, JungHoon;Lee, Hyun-Soo;Park, Moonseo;Kim, Sooyoung;Ahn, Joseph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.39-50
    • /
    • 2014
  • After the global financial crisis, domestic construction industry has gone through a rapid recession. This resulted in gradual market shift towards architectural remodeling. Architectural remodeling not only improves residential environment but it has many advantages such as increase of each unit's exclusive area, free space within the horizontal or extension of an annex building, and increase number of household through splitting the household of bigger pyeong, etc. However, in case of the Korean market for apartment remodeling, due to various regulations and problem with business promotion procedures, majority of business is slow despite the figure that remodeling volume is not that small. Also, feasibility study which decides to push ahead public house remodeling business will have a flaw using net present value's law; it has a flaw of not considering properties of each phase of remodeling business and future's uncertainty. Hence, this research will improve the problem of traditional value assessment method of net present value's law. It will also consider one of the real options such as binomial model in order to supplement NPV which is used in current feasibility study. This research was based on real successful cases of public house remodeling and it was possible for feasibility study which was more realistic and valid. This research provided foundation for development of Korean public house remodeling market. There is high anticipation of increasing the validity by improving the problems of current feasibility study and economic efficiency assessment.