Browse > Article
http://dx.doi.org/10.6106/KJCEM.2019.20.3.077

A Study on Reconstruction and Remodeling's Selection Factors of Old Apartment Houses Using PROMETHEE-AHP  

Yoo, Seung-Min (Department of Architecture, Soongsil University)
Kwon, Oh-kyung (Department of Architecture, Soongsil University)
Choi, Yoonki (Department of Architectural Engineering, Soongsil University)
Publication Information
Korean Journal of Construction Engineering and Management / v.20, no.3, 2019 , pp. 77-85 More about this Journal
Abstract
Reconstruction and remodeling have been introduced as a part of renewal (redevelopment) projects for old apartments built after the mid-1970's and government policies for revitalizing each project has been changed continually. However, the frequent changes of the policies have caused conflicts among business entities in selecting business methods. The conflicts from their early stages have made serious problems in the entire business process. Therefore, this study deduced factors of business selection by applying comparison analysis between the two business projects on how certain factors have an influence on selecting reconstruction and remodeling business projects. Based on the analysis, four categories and 26 factors were finally selected. After then, the priority of each selection factor was deduced through the AHP method and PROMETHEE method used for analysis of relative importance and impact values regarding to the business selection.
Keywords
Apartment; Reconstruction; Remodeling; Selection Factor; PROMETHEE-AHP Method;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Kim, G. (2010). "A Study on the selection factors of re-construction and remodeling of old high rise apartment complexes: centered on empirical analysis using AHP." University of Seoul.
2 Kim, J., and Choi, K. (2010). "Introduction to PROMETHEE Technique for Highway Investment Priority Decision." Korea Research Institute for Human Settlements, 67, pp. 73-86.
3 Lee, K. (2014). "Study of Status and Problems domestic Apartment Remodeling." Journal of the Korea Institute of Building Construction, 14(2), pp. 20-24.
4 Im, J. (2014). "An Approach to Establish a Fundamental Plan of Apartment Remodeling." Journal of the Korea Institute of Building Construction, 14(2), pp. 30-35.
5 Seo, G. (2010). "Study on key determinants in selection between reconstruction projects and re-modeling projects." Konkuk University.
6 Son, S. (2015). "Study on Reconstruction and Remodeling's Selection Factors of Old Apartment Houses Using AHP." Korean Journal of Construction Engineering and Management, KICEM, 16(6), pp. 12-21.   DOI
7 Ko, J. (2007). "A Case Study on the Choice of One to One Reconstruction or Remodeling." 55, pp. 253-270.
8 Brans, J., and Vincke, P. (1985). "A Preference Ranking Organization Method (the PROMETHEE Method for Multi Croteria Decision-making)." Management Science, 31(6), pp. 647-656.   DOI
9 George, P. (1974). "Multi-attributeutility models:A review offield and field-likestudies, Management Science." 20(10), pp. 1392-1402.
10 Roy, B. (1991). "The Outranking Approach and The Foundation fo ELECTRE Methods, Theory and Decision." 31, pp. 49-73.   DOI
11 Kim, J. (2009). "A Highway Investment Priority Evaluation Using Multicriteria Decision Making Method of PROMETHEE." Ajou University.