• Title/Summary/Keyword: 현장 자재 관리

Search Result 186, Processing Time 0.029 seconds

An Experimental Study for RFID Application of Construction Materials in an Apartment House Construction Site (건설자재의 공동주택 현장 적용을 위한 RFID 부착 및 인식에 관한 실험적 연구)

  • Ju, Ki-Beom;Han, Choong-Han
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.67-75
    • /
    • 2009
  • While the trend of all industries recently lies in combination, construction industry is much interested in enhancing efficiency and competitiveness in the aspect of site control by adopting RFID. Though RFID has been applied to diverse areas thus far, it cannot be easily applied to construction industry due to diverse physical, chemical and use-environmental properties of construction materials. Furthermore, it is rarely applied to the site because of many problems in its application. It is required to prepare RFID code issuance and system that can systematically control the code as well as to research the standardization of frequency, specification, protocol, package method, recognition method, etc in order to apply RFID to construction industry. In this research, RFID code issuance and management program are proposed as a part of program research to apply RFID. Furthermore, the restricted matters of existing RFID tag are drawn to produce pilot product of RFID tag that can solve it so as to perform site application test. According to the experiment, effective recognition distance varies depending on material/environmental property and control efficiency changes depending on attachment method and application method. Thus, preparing diverse restrictive factors and solutions by systematically analyzing control method(medium, process) of current architecture materials and applying it to construction site can be the way to successfully apply RFID.

Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing (지급자재 조달관리부담 평가에 기초한 중소기업 공사용자재 직접구매제도 대응방안: 공공아파트를 공급하는 발주자를 중심으로)

  • Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.425-434
    • /
    • 2013
  • The Small and Medium Business Administration specified 123 construction materials mandatory to purchase directly and forced the public owners to provide the contractors with materials as required by related law. This study extensively reviewed various characteristics and management factors of the owner-providing materials consumed in the public apartment housing under Direct Buying System(DBS) from the public owner's perspective. Subsequently, the major managed materials were identified, and the proper response plan was developed along the material procurement process. The Procurement Management Load Indices (PMLI) of 43 materials were evaluated according to rating criteria with procurement path, project-specified level, user requirement level, supplier's responsibility, on-site work requirement, additional parts, and inspection standards. The tile and aluminum windows were classified in the group needing high-level procurement efforts to reduce the errors and ensure the efficiency. The accurate quantity estimation method, definite purchase details, management activity definition before and after production, additional quantity for rework, interference coordination were defined as the essential activities for effectively responding to DBS.

A Study of Material Information System Model For Building Finishes (건축 마감자재정보 시스템 모델 연구)

  • Won, Seo-Kyung;Kang, Min-Woo;Woo, Ji-Youn;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.597-601
    • /
    • 2006
  • There are considerable amount of man power and time spent for analysis and selection of various materials due to the inadequate application system and rapid searching process of material related information in each stage of building production process. Also, due to the insufficiency in recycling system of important information created for each process, they are hoarded at each task stage and project completion. As a result, because of the repetition of the similar/identical tasks on each process, it is the major reason for impeding the efficient employment of manpower of the company and decreasing competition of the company. Moreover, in selecting finish material in the project field, there are many difficulties due to the lack of technical information such as product characteristics and field applications. The construction quality also affects the profit and loss of the product which calls for a need to develop continued information management system that the finish material related examples could be shared in real time. The objective of this study is to propose a building finish material information which the real time research and application is possible to raise the productivity. TO do this, the current material information task status analysis and questionnaire research should be conducted to understand the demand of system development and reflect the result onto the system for easy access and application. Therefore, the building finish material information system for enhancement of productivity of construction task proposed in this study is expected to be utilized in enhancement of construction quality, maximization of company profit, and strengthening of company competition.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재소요계획모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.598-601
    • /
    • 2003
  • As the scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which can extract necessary information is increased. However, compare with large companies, medium-sized companies's organization of head office and management system is weak, so it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and have not associated with schedule information. So when schedule if changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

  • PDF

Optimization for RFID Based on Construction Material Management System Using Genetic Algorithm (Genetic Algorithm을 이용한 RFID 건설 자재 관리 시스템 최적화)

  • Kim, Chang-Yoon;Kim, Hyoung-Kwn;Han, Seung-Heon;Park, Sang-Hyuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.511-514
    • /
    • 2006
  • Material Management is one of the most important task in construction projects. More than 50% of the cost in a construction project is related to material management process. Material management method using RFID(Radio Frequency Identification) is now trying to the construction field. However, there are no enough researches on effective material management in terms of how and where RFID transponder should be installed and there are no other research that which optimization method can be used for effective installation. Therefore, this paper suggest that where and how RFID transponder can be installed on the appropriate position in construction fields using Genetic Algorithm optimization method.

  • PDF

An Efficient Operation Scheme for the Material Procurement System in Construction Firms (대형 건설업체 자재수급관리시스템 효율적 운영방안)

  • Kim Tae-Gyum;Park Jong-Hyouk;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.299-302
    • /
    • 2003
  • Recently the timely delivery and the appropriate management for construction materials are of great significance in that the buildings are getting complicated and more various materials need to be handled. However, these systems have some problems, and do not seem to work effectively yet. The reason is that the lack of operation scheme for systematic management in project. In this study the efficient scheme for the .material procurement system in construction firms to manage the construction materials efficiently was discussed.

  • PDF

An Experiment Study for RFID Attachment Standardization of Construction Materials (건설자재의 RFID 부착표준화를 위한 실험적 연구)

  • Han, Choong-Han
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.753-757
    • /
    • 2008
  • The objects of this study are to increase the efficiency and competitiveness for construction management and field supervision by using IT technology which is a trend of construction industry thesedays. Using RFID technology can play an important role to achieve the goal, but it is necessary to research a standard of using frequency, specific, protocol, package method and reading method because it is hard to apply RFID to physical, chemical, environmental specifics. In this study as a part of planning research to standardize, a limitation item Is conducted with RFID tag attached building materials, and RFID Tag goods which solve the restriction are produced to conduct a field application test. From the result, available reading distance is different according to physical and environmental specifics. Furthermore because the different application method and attaching method make a various management efficiency, the current management of construction materials is analyzed and applied to a construction field to provide to various limitation items and recovery plan.

  • PDF

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

자재소식 - KS M 3862(발포 폴리에틸렌 보온재)의 KS인증 제품에 대한 표시 확인

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.312
    • /
    • pp.96-97
    • /
    • 2016
  • 건설현장의 자재는 종류가 다양하기 때문에 이를 관리하기란 쉬운 일이 아니다. 보온재 또한 크기와 모양이 비슷하기 때문에 복잡하고 다양한 배관작업을 수행하는 우리 기계설비건설업체 공사현장에서는 규격이 다른 보온재를 설치하여 금전적 손실로 이어질 위험이 크다. 이에 따라 이번호에 KS인증 표시기준을 준수하는 발포 폴리에틸렌 보온재의 제품인증 표시 확인 방법에 대해 알아본다.

  • PDF

Real-Time Construction Resource Monitoring using RFID/USN Inter-working System (RFID/USN 연동 시스템을 활용한 건설자원 실시간 모니터링 시스템)

  • Ryu, Jeoung-Pil;Kim, Hyoung-Kwan;Kim, Chang-Yoon;Kim, Chang-Wan;Han, Seung-Heon;Kim, Moon-Kyum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.90-94
    • /
    • 2007
  • Location tracking automation of resources in construction industry is one of the most important procedures to improve construction project performance and reduce the period of construction. Recently, location tracking technologies have proven to be effective in tracking construction materials and equipment in real time through the instrumentality of RFID (Radio Frequency Identification). By using wireless communication and inter-working system between RFID and USN, it is possible that construction engineers receive the location information of construction resources without additional efforts that move the RFID reader to read tags periodically. In the inter-working system, RFID reader delivers the acquired materials information to sensor node which is connected by serial interface. Then sensor node transmits the received data to the data aggregation terminal that is a sink node. The data aggregation terminal can transmit collected data to construction manager who is out of construction site using infrastructure such as CDMA(Code Division Multiple Access) network. The combination model of the two system and field test scenarios are presented in this paper.

  • PDF