• Title/Summary/Keyword: 프로젝트관리자

Search Result 563, Processing Time 0.029 seconds

Multi-dimensional Quality Model for Value Engineering in Planning Phase of Public Construction Program (공공 건설 프로그램의 기획단계 VE를 위한 다차원 품질모델)

  • Hyun, Chang-Taek;Kim, Jong-Hyeob;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.61-69
    • /
    • 2013
  • In the mixed-use development program, several conflicts occur due to the characteristics of construction program, such as large-scale, variety of stakeholders, long periods of time, etc. In particular, since the characteristics of the construction program having various complex projects lead to different requirements depending on stakeholders, it is crucial to plan the appropriate type and size of facilities. Therefore, it is necessary to derive solutions suitable for the needs of owner by conducting VE in the planning phase. In this study, a multi-dimensional quality model is developed to present proper facilities necessary for the construction program by clearly identifying the owner's requirements in performing VE in the planning phase. Through the development of the multi-dimensional quality model, the characteristics distribution of 15 major facilities by 12 performance indicators for mixed-use development programs is presented. The deduction method of appropriate facilities based on the requirements of owner and the multi-dimensional synthesis method among the performance indicators are also suggested. This study is significant as a basic research for the application of VE in the planning phase of construction program. It is expected that the multi-dimensional quality model proposed in this study could facilitate presentation and review of appropriate facilities based on the analysis of requirements of various stakeholders in the early stage of the construction program.

Comparative Assessment of Usability of Web-storming System between Administrator and Designer Groups in Space Design Process (공간디자인 프로세스에서 관리자·실무자 그룹의 웹스토밍 시스템 활용성 비교평가)

  • Choi, Gil-Dong;Kim, Kwang-Myung
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.9
    • /
    • pp.154-165
    • /
    • 2011
  • Considering the online idea generation, or web-storming, system would be used differently by space designers depending on their job characteristics, the present study tested the usability of web-storming using a factor correlation table with a designer group in the field. Then, for analyses, the results were compared with the previous findings on the usability of web-storming in a design administrator group to suggest comprehensive measures applicable to web-storming. The questionnaire results were analysed following a process of observation-interpretation-application, and the space design process and web-storming function factors were also analysed based on a factor correlation table. The analyses found that the most correlated space design process in both administrator and designer groups was the schematic design phase, and that the correlation started to lower upon division of labour. The assessment phase was found significantly different between the designer group and the administrator group. The assessment phase showed the second highest correlation in the designer group. In terms of the aspects related to project operation, the correlation was found higher in the designer group. Based on the findings, new applicable measures to each phase of web-storming were derived and summed up to suggest how to take advantage of web-storming in the field.

To Improve Production Process of the Modular Using the Conveyor System (모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 -)

  • Bae, Byung-Yoon;Kim, Kyung-Rai;Cha, Hee-Sung;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.103-112
    • /
    • 2012
  • Republic of Korea is recently becoming an advanced country with increasing standard of living. This is causing a lack of employment in the construction industry because of high labor costs and it is resulting rapid increase in foreign labors. Modular Method of Construction can be defined as 50%~90% of the entire process is completed in factory, and transferred to construction field to install. The main purpose of this process is to minimize the entire process that possibly can be done at construction field in order to maximize the quality. The current local usage of Modular Method of Construction started at Shin Ki Elementary School during 2003 and it is widely used for military facilities. It should be used more because it has strengths of spending short time period to complete and low production costs. It can make a change if Modular Method of Construction is applied. Toyota is currently producing vehicle with conveyor system and if Modular Method of Construction is applied, then it is possible to reduce the waste of labor, and automatic production time. Expansion of the modular Market can be expected by applying this method because it will improve producing costs, high quality, and enforced process. This research tried to solve the problem of factory's manufacturing production by applying local Modular Method of Construction to provide suggestions and analyze the profitability with applied conveyor system. It is depending on produced model, but this research's model will take 20 months including assessment of payback period.

A Comparative Study on Korean Compulsory Multiple Prime Contract System (건설산업 제도개선을 위한 분할·분리 발주 제도의 선진화 방안 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.184-193
    • /
    • 2013
  • Procurement System for Korean construction industry has mainly been controlled by the complicated regulatory system which has been recognized as unflexible and remotely separated from the global standard. This has been identified by many Korean construction experts as one of the main reasons that hamper the Korean construction industry becoming the global leader. One commonly discussed regulatory system is the compulsory multiple contracting system that has been enforced for a long time. According to the Korean governmental contracting law 68-3, all construction projects cannot be divided into separate contracting packages with a few exceptions. Exceptions stated in the law include construction activities related electrical, Information communication, fire-fighting, and cultural assets which all are governed by the separate laws/acts controlled by the different governmental bodies. This research is to closely investigate multiple prime contracting system that has been compulsory in Korean construction industry and to provide policy recommendations to these restrictions. Although, there has been a long history of this compulsory contracting system, this study attempted to provide objective analysis on current status of the system as well as global standard on the issue. This study suggests main considerations when considering different contracting system such as rights of owners, flexibilities of regulatory systems, and efficiencies of conducting a construction project. It is envisioned that recommendations from this study, if accepted by the regulatory bodies, would improve the Korean construction contraction system by making it more compatible with global standard. Moreover, these would help making the Korean industry more effective in terms of regulatory restrictions.

A Study on the Obstacle Factors and the Development Strategy of High Value Occupational Training for Women (여성 고부가가치 직업훈련의 장애요인과 발전방안 연구)

  • Lee, Ji-Eun;Lim, Hee-Jeong
    • Journal of Digital Convergence
    • /
    • v.17 no.3
    • /
    • pp.181-189
    • /
    • 2019
  • The purpose of this study is to derive obstacle factors to 'high value vocational training' and to suggest development strategies. The training aims to solve the quantitative and qualitative problems of female employment by providing professional training in high value areas such as ICT, SW and knowledge service. To verify the training to meet these objectives, 48 processes operated in 2018 were analyzed and field monitoring was conducted. As a result of the analysis, problems were identified and improvements were derived in terms of learners management, training course design, field practice operation, and performance evaluation. Based on these results, researchers suggested four ways to develop high value vocational training. First, select learners based on combined talent and second, strengthen the project of linking enterprises and structured field practices. Third, establish a performance evaluation system of its own and manage performance and fourth, expand support for excellent training courses and provide consulting for course development. The results of this study are expected to be used as a reference for establishing policies for high value occupational training. In the future, quantitative research should be conducted to clarify the performance and problems.

Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk (국내 시공책임형 CM 오픈북 정책 현황 분석을 통한 개선방안)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.3-11
    • /
    • 2016
  • CM at Risk has been introduced in Korea to keep up with the global standards of construction management and provide a higher quality of cm service in line with a rapid change of the construction industry recently. However, it is widely considered that more time would required to settle down the system due to a lack of understanding towards CM at Risk, shortage of reliability and low capability to manage and undertake CM at Risk. Therefore, this research is analyzed problems of contract types, open book policies, and contract conditions of 33 numbers of projects undertaken by a bespoke domestic construction management firm in this research. Moreover, this research is suggested a method to establish an open book policy of CM at Risk aiming a better customers satisfaction through staff training, simplifying and improving a payment system, and a way to settle down an open book policy by improving a performance management system on site. It's expected that this research will contribute to a more competitive system with more dominating the market and a differentiation of the service so as clients to rely more on the CM at Risk.

Developing Countermeasure Model to Prevent Planned Lawsuit on Apartment Construction Defects (공동주택 하자기획소송에 대한 건설사 사전 대응 모델 개발)

  • Cho, Youngsun;Cha, Heesung;Kim, Kyungrai;Hwang, Youngkyu;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.74-82
    • /
    • 2014
  • The proportion of apartment housing has been increased to solve the housing problems resulted from rapid growth in urban population and urban economy. With the increase in apartment's proportions and the concern about quality of housing, the contractors have made efforts to satisfy the customers in improving the quality of housing. Despite these efforts, the conflicts between the contractor and the customers are getting serious. Also the disputes and the litigation of defect are increasing because of the contractor's negative treatment and inadequate countermeasure. In this study the defect lawsuits which bring actions against the contractors are collected and analyzed. And then the strategic countermeasures are proposed according to the classifying the type of defect and size. The suggested countermeasure model before the defects are resulted is expected to contribute in developing the contractors strategies to reduce the conflicts against customers.

A narrative research on the job and the job-related learning of a mechanical engineer - an exemplary study on the characteristic of job-related learning of engineer in work place and it's implication on engineering education (기계설계분야 중견 엔지니어의 일과 학습에 관한 내러티브 연구 - 엔지니어의 직무관련 학습의 맥락과 공학교육에 대한 시사점 찾기)

  • Lim, Se-Yung
    • 대한공업교육학회지
    • /
    • v.38 no.2
    • /
    • pp.1-26
    • /
    • 2013
  • This study inquired following research questions by a narrative research method : What was the job of an engineer in mechanical design field? How did he fulfill his job-related learning in his workplace? What were the context and the characteristic of the job-related learning in the workplace? And some implications of the job-related learning on engineering education were discussed. We identified that the research participant's career as a mechanical engineer has developed through three stages. At first, he engaged on conceptual design of a semi-conductor test machine through self-initiated learning from basic to whole system of the machine. At second stage, he leaded a design group for the concrete design of a ball type semi-conductor test machine. In this stage he learned the meaning of cooperation and cooperative learning. At third stage, he initiated to found an entrepreneur company that was specified to design a semi-conductor test machine. He became CEO of the company. He learned the R & D policy making through contacts with global company, visiting exhibition in abroad. Eventually his main task as a mechanical engineer was the problem solving in the process of machine design. He had experienced and learned through his works : project management, independent fulfilling of tasks, functional analysis and reverse engineering, conceptualizing and test, cohesive cooperation, dialogue and discussion, mediation of conflict, human relationship, leadership. The implication of the narrative analysis on engineering education is, proposed, to give the students more chances to experience and to learn such activities.

Biodiversity Conservation and the Yellow Sea Large Marine Ecosystem Project (생물다양성 보전과 황해 광역 해양생태계 관리계획)

  • Walton, Mark
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.13 no.4
    • /
    • pp.335-340
    • /
    • 2010
  • The paper describes the objectives of Yellow Sea Large Marine Ecosystem (YSLME) project, focusing on procedural and practical aspects. YSLME is a highly productive sea yet possibly one of the most impacted large marine ecosystems, in terms of anthropogenic stressors, due the enormous coastal population. The aim of the YSLME project is the reduction of ecosystem stress through identification of the environmental problems in the Transboundary Diagnostic Analysis (TDA) that are then addressed in the Strategic Action Programme (SAP). One of the major problems found to be affecting biological diversity is habitat modification through wetland reclamation, conversion and degradation. Since the early 1900's more than 40% of intertidal wetlands have been reclaimed in Korea, and 60% of Chinese coastal wetlands have been converted or reclaimed. Damaging fishing practices, pollution and coastal eutrophication have further degraded the coastal environment reducing the biological diversity. To combat this loss, the YSLME project has mounted a public awareness campaign to raise environmental consciousness targeted at all different levels of society, from politicians at parliamentary workshops, local government officer training events, scientific conferences and involvement of scientists in the project research and reporting, to university and high school students in our visiting internship programmes and environmental camps. We have also built networks through the Yellow Sea Partnership and by liaising and working with other environmental organizations and NGOs. NGO's are recognised as important partners in the environmental conservation as they already have extensive local networks that can be lacking in international organisations. Effective links have been built with many of these NGOs through the small grants programme. Working with WWF's YSESP project and other academic and research institutions we have conducted our own biodiversity assessments that have contributed to the science-based development of the SAP for the YSLME. Our regional targets for biodiversity outlined in the SAP include: Improvements in the densities, distributions and genetic diversity of current populations of all living organisms including endangered and endemic species; Maintenance of habitats according to standards and regulations of 2007; and a reduction in the risk of introduced species. Endorsement of the SAP and its successful implementation, during the proposed second phase of the YSLEM project, will ensure that biological diversity is here to benefit future generations.

Modular Building for Urban Disaster Housing: Case Study of Urban Post-Disaster Housing Prototype in New York

  • Ford, George;Ahn, Yong Han;Choi, Don Mook
    • Fire Science and Engineering
    • /
    • v.28 no.6
    • /
    • pp.82-89
    • /
    • 2014
  • Disasters that destroy homes and infrastructure and cause significant financial damage are becoming more common as population centers grow. In addition, several natural disasters have resulted in a major loss of life and created countless refugees due to damage to housing. After major catastrophic disasters, it is very important that the government agencies respond to post-disaster housing issues and provide resources such as temporary housing before the full rehabilitation and reconstruction of destroyed and damaged housing. To provide affordable temporary housing for residents who may lose their homes as the result of a catastrophic disaster including storms, government agencies must develop a post-disaster housing prototype. In general, government agencies should explore several different forms of factory-built single-story, single family housing, such as modular homes, panelized homes, and precut homes. In urban cities including New York and Seoul, it is very important to provide housing which supports the demand for higher-density living spaces than single-family homes or trailers typically available due to the high population density and the desire to resettle as many residents as possible in their former neighborhoods. This study identified the urban post-disaster housing prototypes that may provide higher density housing with high quality living spaces, high air quality, and energy efficiency as well as rapid deployment. A case study of "Urban Post-Disaster Housing Prototype Program in New York" was conducted through a detailed interview process with a designer, engineer, contractor, the Office of Emergency Management (OEM) in New York, the U.S. Army Corps of Engineers (USACE), and temporary occupants. An appropriate disaster housing program that can provide living spaces for victims of disasters that keeps residents in their community and allows them to live and work in their neighborhoods was developed.