1 |
Dell'Isola, A. (1997), Value Engineering Practical Applications, RS Means
|
2 |
Ha, S., Hyun, C., Son, M. and Kim, Y. (2011), "Development of Pre-workshop Phase for the VE application at the Early Planning Stage of the Mega Project", Korean Journal of Construction Enginnering and Management, KICEM, 12(4), pp. 29-39
과학기술학회마을
DOI
ScienceOn
|
3 |
Hyun, C., Hong, T., Seo, Y. and Son, M. (2008), "A Study on Development of Total Construction Cost and Time Management Technique Considering Life Cycle in the Development of Construction Management System for Mega Project", Urban Design Institute of Korea, Proceedings of General Assembly & Spring Annual Conference, pp. 589-599
|
4 |
Hyun, C., Um, I., In, C. and Lee, I. (2011), Basic Course of VE Expert, Korea Construction Value Engineering Research Institute
|
5 |
Jeong, H., Yang, J. and Lee, S. (2008), "Improved Method for VE Items Selection by Analysing the Required Items of Stakeholder on the Apartment in Design Phase", Korean Journal of Construction Enginnering and Management, KICEM, 9(4), pp. 111-119
과학기술학회마을
|
6 |
Koo, J. (2010), Function Analysis of VE in Planning Phase of Mixed-Use Development, Master Thesis, University of Seoul
|
7 |
Norton, B. R., and McElligott, W. C. (1995), Value Management in Construction A Practical Guide, Macmillan
|
8 |
Song, C. (2011), Performing Method of Green VE for Sustainable Office Building, Master Thesis, University of Seoul
|
9 |
Thomsen, C. (2008), Program Management, CMAA
|
10 |
Yiu, C. Y., Ho, H. K., Lo, S. M. and Hu, B. Q. (2005), "Performance Evaluation for Cost Estimators by Reliability Interval Method", Journal of Construction Engineering and Management, 131(1), pp. 71-75
DOI
ScienceOn
|