Korean Journal of Construction Engineering and Management
/
v.9
no.2
/
pp.182-189
/
2008
In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.
Korean Journal of Construction Engineering and Management
/
v.6
no.1
s.23
/
pp.212-219
/
2005
Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.
Korean Journal of Construction Engineering and Management
/
v.16
no.1
/
pp.110-118
/
2015
The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.
Kim, Daewon;Kim, Tae-Yong;Shin, Yoonseok;Kim, Gwang-Hee
Journal of the Korea Institute of Building Construction
/
v.16
no.2
/
pp.133-140
/
2016
The amount of labor input in a construction project is used as source data to estimate construction cost and to understand the productivity of the construction industry. However, there is a significant difference between the standard of estimation and the actual amount of labor input, and a plan is needed to resolve this problem. For this reason, to establish a system with which the actual amount of labor input can be inputted in a more accurate and simpler manner, a new method is proposed in this study. In the new method, a digital pen is used to minimize the difference from traditional handwriting on paper using a pen, and eliminate the redundant input of information. This study is expected not only to reduce the actual amount of labor input but also to contribute to the productivity of construction cost estimate through the sharing or utilization of the information on the web.
Korean Journal of Construction Engineering and Management
/
v.16
no.5
/
pp.97-104
/
2015
Apartment Housing 25 in the field of construction since 2000 collected by types of labor: reinforced concrete, plaster, internal, equipment, electrics communication, the other work. And the performance of labor input was collected in the amount of construction work performed on a monthly basis. After changing the construction period in the standardization work that is 100% of the construction period, the amount was converted into labor ratio by type. Analysis of the input flow rate and the amount of labor conclusions were as follows: (1) The size of the labor rate is reinforced concrete work (38.25%), plastering work (5.10%), internal work (5.67%), equipment work (9.10%), electrics communication (8.76%), the other works (33.12%) and the size of labor rate is the largest work in reinforced concrete work. (2) The peak of labor input ratio was from 52.5% month to 62.5% month. This was when the labor rate of 3.6%. (3) The period month of the largest labor ratio% is 35% month by reinforced concrete construction, and this time it was 2.12% per month labor rate, and reinforced concrete construction is finishing from 65% month to 80% month. This showed the greatest congestion of mutual interference between each works is being continue. The results of this study are the greatest congestion in apartment housing construction has informed the high period(%months), which is essential to a successful project.
Proceedings of the Korean Institute of Building Construction Conference
/
2015.05a
/
pp.103-104
/
2015
Process management of reinforced concrete construction that many labor quantity and cost is put at a construction site is very important and gives a lot of influence on the subsequent process. Thus, there will be only used as a useful tool for process control by medical facilities and trend analysis of the flow of the process by the amount of labor input and productivity in reinforced concrete construction. productivity by type and quantity, and comparative analysis. In addition, it is necessary to calculate the standard of estimate and real commitment to labor productivity by type and quantity, and comparative analysis.
Korean Journal of Construction Engineering and Management
/
v.7
no.5
/
pp.85-93
/
2006
This study is started from a situation of korean construction which has been undergoing diversity. And risk of construction project has been increased recently. The purpose of this study is to propose the model which is able to estimate the proper manpower by eliciting the variable which is offered in the pre-design and construction phase. The existing method of estimate has a problem with calculating exact costs. For this model, it was analyzed the existing manpower estimating model and used historical data of 38 apartment houses, constructed from 2000 to now. Based on these, the regression model of the construction manpower was built. And then the regression model was verified. The result of verification was relatively adequate in the statistics exept for some cases. This regression model will help make it possible for constructor to estimate the deduction of retirement more accurate than existing method.
건설공사의 공사비를 산출하기 위해서는 공사에 필요한 노무 자재 및 장비의 정확한 투입량을 알아야 한다. 이를 위해 정부는 1970년부터 표준품셈을 제정하여 현재까지 공공기관에서 시행하는 건설공사의 예정가격 산출에 활용하고 있다. 표준품셈은 한국건설기술연구원에서 제 개정 희망항목 조사와 현장실사, 심의위원회를 거쳐 국토부에서 매년 상 하반기에 제 개정 내용을 공포하고 있다. 이번 호에는 회원사들이 궁금해 하는 표준품셈 제 개정과정에 대해 알아본다. 매년 개정된 기계설비 표준품셈은 대한기계설비건설협회에서 인쇄하여 회원사에게 배포하고 있으며, 협회 홈페이지(ww.kmcca.or.kr${\rightarrow}$자료실${\rightarrow}$각종기준표${\rightarrow}$표준품셈/일위대가표)에서 다운받을 수 있다.
Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.256-261
/
2008
The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.
Korea Forest Service is recently focused on forest tending works for promoting in green jobs. The purpose of forest tending work is not only maintaining ecologically stable forest stand structure but also developing commercial forest. These trends are also emphasized by creation of various benefits and expanding carbon absorption in forest management. For achieving these purposes, Management efficiency of output was analized by the inputs such as labor cost, material cost and expense cost using DEA technique. The results show that, 19 sub-compartments are appeared to be the optimal in the efficiency of the forest tending works among total 52 sub-compartments. Among those there were 5 sub-compartment 8-0-3, 9-3-3, 6-0-3, 7-0-6, 1-0-5 and 3-0-3 to be considered in the high reference. The high reference areas mean those areas which is well accomplished in forest tending works as the desirable model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.