Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site (건설현장의 실투입 노무량 입력을 위한 디지털펜 시스템)

  • Kim, Daewon;Kim, Tae-Yong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.133-140
    • /
    • 2016
  • The amount of labor input in a construction project is used as source data to estimate construction cost and to understand the productivity of the construction industry. However, there is a significant difference between the standard of estimation and the actual amount of labor input, and a plan is needed to resolve this problem. For this reason, to establish a system with which the actual amount of labor input can be inputted in a more accurate and simpler manner, a new method is proposed in this study. In the new method, a digital pen is used to minimize the difference from traditional handwriting on paper using a pen, and eliminate the redundant input of information. This study is expected not only to reduce the actual amount of labor input but also to contribute to the productivity of construction cost estimate through the sharing or utilization of the information on the web.

Trend Analysis of Labor Input Ratios by Work Types in Apartment Housing Constructions (공동주택 건설공사에서 공종별 실투입 노무비율의 추이분석)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.97-104
    • /
    • 2015
  • Apartment Housing 25 in the field of construction since 2000 collected by types of labor: reinforced concrete, plaster, internal, equipment, electrics communication, the other work. And the performance of labor input was collected in the amount of construction work performed on a monthly basis. After changing the construction period in the standardization work that is 100% of the construction period, the amount was converted into labor ratio by type. Analysis of the input flow rate and the amount of labor conclusions were as follows: (1) The size of the labor rate is reinforced concrete work (38.25%), plastering work (5.10%), internal work (5.67%), equipment work (9.10%), electrics communication (8.76%), the other works (33.12%) and the size of labor rate is the largest work in reinforced concrete work. (2) The peak of labor input ratio was from 52.5% month to 62.5% month. This was when the labor rate of 3.6%. (3) The period month of the largest labor ratio% is 35% month by reinforced concrete construction, and this time it was 2.12% per month labor rate, and reinforced concrete construction is finishing from 65% month to 80% month. This showed the greatest congestion of mutual interference between each works is being continue. The results of this study are the greatest congestion in apartment housing construction has informed the high period(%months), which is essential to a successful project.

Analysis of Trends in the Labor Productivity and Actual Amount of Labor Input in the Reinforced Concrete Construction of Health Facilities (의료시설 철근콘크리트공사에서 생산성과 실투입 노무량의 추이에 관한 분석)

  • Jeong, Jae-Woong;Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.103-104
    • /
    • 2015
  • Process management of reinforced concrete construction that many labor quantity and cost is put at a construction site is very important and gives a lot of influence on the subsequent process. Thus, there will be only used as a useful tool for process control by medical facilities and trend analysis of the flow of the process by the amount of labor input and productivity in reinforced concrete construction. productivity by type and quantity, and comparative analysis. In addition, it is necessary to calculate the standard of estimate and real commitment to labor productivity by type and quantity, and comparative analysis.

  • PDF

A Manpower Forecasting Regression Model for Apartment House Construction Project based on the Historical Data (실적자료 분석을 통한 공동주택공사 노무량 예측 회귀모델)

  • Son, Yong-Seok;Shim, In-Bo;Kwon, Jae-Sung;Jeon, Sang-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.85-93
    • /
    • 2006
  • This study is started from a situation of korean construction which has been undergoing diversity. And risk of construction project has been increased recently. The purpose of this study is to propose the model which is able to estimate the proper manpower by eliciting the variable which is offered in the pre-design and construction phase. The existing method of estimate has a problem with calculating exact costs. For this model, it was analyzed the existing manpower estimating model and used historical data of 38 apartment houses, constructed from 2000 to now. Based on these, the regression model of the construction manpower was built. And then the regression model was verified. The result of verification was relatively adequate in the statistics exept for some cases. This regression model will help make it possible for constructor to estimate the deduction of retirement more accurate than existing method.

표준품셈 - 건설공사 표준품셈 제·개정 절차와 공표까지

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.299
    • /
    • pp.87-93
    • /
    • 2015
  • 건설공사의 공사비를 산출하기 위해서는 공사에 필요한 노무 자재 및 장비의 정확한 투입량을 알아야 한다. 이를 위해 정부는 1970년부터 표준품셈을 제정하여 현재까지 공공기관에서 시행하는 건설공사의 예정가격 산출에 활용하고 있다. 표준품셈은 한국건설기술연구원에서 제 개정 희망항목 조사와 현장실사, 심의위원회를 거쳐 국토부에서 매년 상 하반기에 제 개정 내용을 공포하고 있다. 이번 호에는 회원사들이 궁금해 하는 표준품셈 제 개정과정에 대해 알아본다. 매년 개정된 기계설비 표준품셈은 대한기계설비건설협회에서 인쇄하여 회원사에게 배포하고 있으며, 협회 홈페이지(ww.kmcca.or.kr${\rightarrow}$자료실${\rightarrow}$각종기준표${\rightarrow}$표준품셈/일위대가표)에서 다운받을 수 있다.

  • PDF

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF

Management Efficiency of Forest Tending Works by Using Data Envelopment Analysis (DEA(Data Envelopment Analysis)기법을 이용한 숲가꾸기 사업의 경영 효율성 분석)

  • Woo, Hee Sung;Woo, Jong Choon;Won, Hyun Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.4
    • /
    • pp.729-736
    • /
    • 2012
  • Korea Forest Service is recently focused on forest tending works for promoting in green jobs. The purpose of forest tending work is not only maintaining ecologically stable forest stand structure but also developing commercial forest. These trends are also emphasized by creation of various benefits and expanding carbon absorption in forest management. For achieving these purposes, Management efficiency of output was analized by the inputs such as labor cost, material cost and expense cost using DEA technique. The results show that, 19 sub-compartments are appeared to be the optimal in the efficiency of the forest tending works among total 52 sub-compartments. Among those there were 5 sub-compartment 8-0-3, 9-3-3, 6-0-3, 7-0-6, 1-0-5 and 3-0-3 to be considered in the high reference. The high reference areas mean those areas which is well accomplished in forest tending works as the desirable model.