Efficient Construction of the Immersed Tunnel Considering Hydration Heat (수화열을 고려한 침매 터널의 효율적 시공)

  • Jeon, Se-Jin;Choi, Myoung-Sung;Kim, Young-Jin;Chang, Young;An, Jea-Sang
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.587-590
    • /
    • 2005
  • This study investigates the efficient construction scheme of the immersed tunnel focusing on the hydration heat. In this respect, some alternatives in curing, temperature condition and removing of the forms are compared together to meet the required criteria. It is addressed that the strict construction stage analysis considering the placing scheme of concrete is one of the key factors to trace the realistic structural behavior for the hydration heat.

  • PDF

Properties of the SHOT Remitar a Wet System for Small Bore Tunnels (소구경 터널에 사용되는 SHOT PATCH용 레미탈의 특성)

  • 정민철;전용희;정종익;박길수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10b
    • /
    • pp.871-876
    • /
    • 1998
  • The SHOT PATCH System Remitar is a mortar shotcreting system which used fairly small machine and equipment, and is applied for shortcrete tunnel linings, in particular for small bore tunnels of aqueducts by the TBM(Tunnel Boring Machine) method, and for repairing tunnels suffering from spring water and deterioration. This study shows the characteristics of the new mortar shotcreting system, the SHOT PATCH System Remitar, which exhibits excellent shotcrete performance.

  • PDF

Pillar Width of Twin Tunnels in Horizontal Jointed Rock Using Large Scale Model Tests (대형모형실험을 통한 수평 절리암반에서의 병설터널 이격거리)

  • Lee, Yong-Jun;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.20 no.5
    • /
    • pp.352-359
    • /
    • 2010
  • Stability of twin tunnels depends on the pillar width and the ground condition. In this study, large scale model tests were conducted for investigating the influence of the pillar width of twin tunnels on their behavior in the regular horizontal jointed rock mass. Jointed rocks was composed of concrete blocks. Pillar width of twin tunnels varied in 0.29D, 0.59D, 0.88D and 1.18D, where D is the tunnel width. During the test, pillar stress, lining stress, tunnel distortion, and ground displacement were measured. Lateral earth pressure coefficient was kept in a constant value 1.0. As a result, it was found that the pillar stress and the displacement of the ground and tunnel were increased by decreasing pillar width. The maximum displacement rate was measured just after the upper excavation in each construction sequence. And the maximum influence position was the right shoulder of the preceeding tunnel at the pillar side. It was also found that for the stability assessment the inner displacement was more critical than the crown displacement. The influence zone was formed at the pillar width 0.59D~0.88D that was smaller than 0.8D~2.0D, which was proposed by experience for a good ground condition. And it would be concluded that horizontal joints could also influence on the stability of the twin tunnels.

Analysis of Environmental Load by Work Classification for NATM Tunnels (NATM터널의 공종별 환경부하 특성 분석)

  • Lee, Ju-hyun;Shim, Jin Ah;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.307-315
    • /
    • 2016
  • Many countries are trying to reduce a greenhouse gas to step up their fight against climate change. There are many studies related to building only for reducing a greenhouse gas in construction area but studies related to reducing a comprehensive environmental load including various pollutants that affects the global environment are lacking. This study aims to analyse the characteristics of environmental load by work type for tunnel projects. Analysis showed that seven work types, including lining concrete, shotcrete, tunnel portal and open-cut tunnel work, etc., are representative works generated environmental load. These seven works represent 89.22 percent of total environmental load. In addition, comparison results of environmental load per tunnel's length by work type showed that a major factor of environmental load is caused by a tunnel portal and open-cut tunnel work with relatively short length (excavation length). And lining concrete and shotcrete work are larger than any other environmental load with tunnel's total length. It is expected that the result of this study will be used to make a estimation model for environmental load using approximate quantity survey of representative work types in the early stage of tunnel design. And it will be play a considerable role in establishing of environment management plan for sustainable infrastructure construction.

A comparative study on methods for shield tunnel segment lining sectional forces (쉴드 터널 세그먼트 라이닝의 부재력 산정법 비교연구)

  • Yoo, Chung-Sik;Jeon, Hun-Min
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.3
    • /
    • pp.159-181
    • /
    • 2012
  • The segment lining which consists of segments and joints are main component of shield tunnel. There are a number of methods that are being used in design which compute the sectional forces of a ring of segment lining. The traditional design methods which do not consider the effect of joints have been commonly used for design procedure without a specific verification of structural analysis. This paper presents the result of a comparative study for analytical and numerical models of the shield tunnel segment lining. For the traditional methods, the elastic equation method and the Duddeck & Erdmann method were considered. The ring-beam and the continuum analysis model were also considered as the numerical model.

A study on the establishment of pressure limit values of management monitoring in tunnel (터널 유지관리계측의 압력 관리기준치 설정에 관한 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.53-60
    • /
    • 2016
  • This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of earth pressure and pore water pressure. The data is obtained from 8 sections of the Seoul metropolitan subway line No 6, 7 and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison show that the safety phase is 60% of allowable pressure, the attention phase is 80% of allowable pressure and the precision analysis phase is 100% of allowable pressure. Also, we presented a method of management monitoring by the absolute value which can be easily applied easily in practical affairs.

A Study on the Mechanized Construction for Common Ducts in a Road Tunnel (도로터널 공동구의 기계화 시공에 관한 연구)

  • Moon, Kyoung-Sic;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1937-1944
    • /
    • 2014
  • In recent years, common ducts have been installed and operated in the sidewalls of tunnels to prepare for emergencies in tunnel construction and maintenance. The installation of common ducts is done mainly by humans. Problems with cost increases are inherent in tunnel construction by humans due to the safety risks and the economic inefficiency of humans performing construction activities. Among the problems that arise are poor illumination due to the use of temporarily installed electricity, the risk of accidents due to the confined workspaces, and workers avoiding work tasks because of the poor environment in tunnel. Ideas for solving these problems were developed using a value engineering (VE) process, and mechanized construction was identified as a promising solution. To verify the effectiveness of mechanized construction of a common duct in tunnels, experimental construction work was carried out, and mechanized construction was proven to directly improve the constructability and economic efficiency of common duct construction. In addition, reducing human involvement in common duct construction in tunnels is expected to improve safety, and because of the continuous concrete placement technique used, the finish and appearance of the ductwork are improved.

Case Study on the Tunnel Collapse at the Shallow Depth (NATM터널 저토피 구간에서의 막장붕락 사례연구)

  • Baek Ki-Hyun;Roh Jong-Ryun;Kim Yong-Il;Cho Sang-Kook;Hwang Nag-Youn
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.102-110
    • /
    • 2005
  • ○ ○ tunnel that is located at Iksan - Jangsu freeway ○ ○, has collapsed during construction at the valley with shallow depth. Although, the site investigations, such as TSP, drilling exploration and so of indicated the presence of discontinuities in this section. The RMR was upgraded and the construction were carried out because that not only actual rock qualities were relatively good during construction but also the tunnel foe was stabilized. However, the tunnel was collapsed at the same time blasting of full face, and surface and underground water was infiltrated due to the settlement of the upper part of the tunnel face. To restore the collapsed section, 3-d tunnel stability analysis was performed and suitable reinforcement methods were chosen. The cavity of the upper tunnel face was stabilized by means of UAM and ALC injection. And the settlement was restored using L.W grouting method.

A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel (터널 유지관리계측의 측정 및 분석주기 설정 연구)

  • Woo, Jong-Tae;Lee, Kang-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • In this study, research was performed to establish the measurement and frequency of analysis for maintenance monitoring by investigation of tunnel maintenance monitoring system in the tunnel which was installed in the Seoul metro line 5, 7 and 8, using that the domestic and foreign application case, results of analyzed maintenance monitoring in the domestic tunnel and legal safety management standard of the facility. The results of the monitoring management about analysis frequency to the present are considered that the problem about measuring frequency does not occur. According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.

Characteristics of Subsidence of a Road During the New Tubular Roof Construction Around a Shallow Tunnel (저심도 터널주변의 NTR보강 중 발생한 도로면 침하의 특성)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.620-634
    • /
    • 2018
  • The NTR(New Tubular Roof) method was used to secure the stability of the tunnel and minimize the subsidence of the road. The tunnel was constructed at about 7.5 meters deep below the highway. with a width of about 21 meters. Following the NTR method, 13 steel pipes with a diameter of 2.3 meters were digged and pushed in longitudinally along the tunnel profile and cut out sides of pipes to connect to adjacent pipes, then filled the inside of pipes and the connected space between pipes with concrete to complete the lining of the tunnel to be excavated. As the steel pipes were digged in sequentially, the area of relaxation was connected to each other and behaves like a gradually widening tunnel. When the steel pipes were digged in to the widest points of the tunnel, the settlement rate of the road surface was increasing to the maximum as 2.2 mm and the total settlement until the lining construction was approximately 7.7 mm. After that, by excavating a tunnel inside the pre-installed lining, an additional settlement of about 4.3 mm was occurred, resulting in the total settlement of about 11.8 mm after completing of tunnel construction.