○ ○ tunnel that is located at Iksan - Jangsu freeway ○ ○, has collapsed during construction at the valley with shallow depth. Although, the site investigations, such as TSP, drilling exploration and so of indicated the presence of discontinuities in this section. The RMR was upgraded and the construction were carried out because that not only actual rock qualities were relatively good during construction but also the tunnel foe was stabilized. However, the tunnel was collapsed at the same time blasting of full face, and surface and underground water was infiltrated due to the settlement of the upper part of the tunnel face. To restore the collapsed section, 3-d tunnel stability analysis was performed and suitable reinforcement methods were chosen. The cavity of the upper tunnel face was stabilized by means of UAM and ALC injection. And the settlement was restored using L.W grouting method.
Keywords
Shallow depth; Tunnel collapse; TSP; Reinforcement;
Citations & Related Records
연도 인용수 순위
  • Reference
1 한국도로공사, 2001, 익산-장수 고속도록공사 OO공구 설계보고서
2 한국도로공사, 2001, 익산-장수 고속도록공사 OO공구 지반조사보고서
3 김낙영. 2003. 익산-장수 건설사업소 제OO공구현장 OO터널 붕락구간 보강대책 및 터널안정성 분석, 한국도록공사 도로교통기술원