Efficient Construction of the Immersed Tunnel Considering Hydration Heat

수화열을 고려한 침매 터널의 효율적 시공

  • 전세진 (대우건설기술연구소 토목연구팀) ;
  • 최명성 (대우건설기술연구소 토목연구팀) ;
  • 김영진 (대우건설기술연구소 토목연구팀) ;
  • 장영 (대우건설 토목사업본부 GK설계팀) ;
  • 안제상 (대우건설 토목사업본부 GK설계팀)
  • Published : 2005.11.01

Abstract

This study investigates the efficient construction scheme of the immersed tunnel focusing on the hydration heat. In this respect, some alternatives in curing, temperature condition and removing of the forms are compared together to meet the required criteria. It is addressed that the strict construction stage analysis considering the placing scheme of concrete is one of the key factors to trace the realistic structural behavior for the hydration heat.

Keywords