1 |
Chae, J. D. (2000). "Report for construction method using TBM." Korean Society of Civil Engineers Magazine, Vol. 48, No. 3, pp. 75-84 (in Korean).
|
2 |
Chenga, M. Y., Liangb, Y., Weyb, C. M. and Chena, J. C. (2001). "Technological enhancement and creation of a computer-aided construction system for the shotcreting robot." Automation in Construction, Vol. 10, No. 4, pp. 517-526.
DOI
|
3 |
Ji, W. R. and Park, J. S. (2011). "Prospect and present status of mechanized tennelling technology in Korea." Magazine of Korean Tunnelling and Underground Space Association, Vol. 13, No. 4, pp. 64-76 (in Korean).
|
4 |
Karlinski, J., Rusinski, E. and Lewandowski, T. (2008). "New generation automated drilling machine for tunnelling and underground mining work." Automation in Construction, Vol. 17, No. 3, pp. 224-231.
DOI
|
5 |
Tanaka, Y. (1995). "Automatic segment assembly robot for shield tunneling machine." Computer-Aided Civil and Infrastructure Engineering, Vol. 10, No. 5, pp. 325-337.
DOI
|
6 |
Wirtgen Group. (2013). Concrete slipform paving manual, Available at: www.wirtgen.de/en/technologies /slipform./manual
|