• Title/Summary/Keyword: 지연요인분석

Search Result 430, Processing Time 0.022 seconds

Factors Influencing Internet Consumer's Purchase Delay Behaviors : Focusing on Situational Factors and Perceived Uncertainty (인터넷 소비자의 구매지연행동에 영향을 미치는 요인 : 상황적 요인과 지각된 불확실성을 중심으로)

  • Kim, Jong-Ouk;Suh, Sang-Hyuk
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.7
    • /
    • pp.407-426
    • /
    • 2014
  • This study analyzed the effects of situational factors and perceived uncertainty on purchase delay behaviors of internet consumers. The survey was conducted from internet consumers in the Seoul Metropolitan areas, and 394 responses were used in the data analysis. The results of this study were as follows. First, the negative experience and avoid regrets of the situational factors had a positive impact on overall purchase delay. The time pressure, changeability about purchase, negative experience and avoid regrets had a positive impact on payment stage delay. Also, the time pressure, negative experience and avoid regrets had a positive impact on shopping cart abandonment. Second, all factors of perceived uncertainty had a positive impact on overall purchase delay and payment stage delay. In addition, the information uncertainty and psychological uncertainty had a positive impact on shopping cart abandonment. Therefore, this study is contributing to the diversification of internet study, and it is provide useful information on the customer management and marketing strategy of internet shopping malls.

What Factors Make the Delay of the Information System Project Implementation? (무엇이 정보시스템 프로젝트 일정을 지연시키는가?)

  • Seoung, Byung Ook;Park, Sang Cheol;Koh, Joon
    • Knowledge Management Research
    • /
    • v.22 no.1
    • /
    • pp.1-19
    • /
    • 2021
  • Large-scaled hospital information system projects are often delayed than originally planned. Regarding project management, it is necessary to examine main factors triggering the schedule delay and to analyze the causality of such delay. This study tries to find the delay factors and causal relationship between them based on the case of the hospital information system development project by using the grounded theory method. It turned out that 'unrealistic scheduling' affects overall schedule delays like domino phenomenon, and 'poor analysis of existing systems' leads to poor quality of work analysis while 'poor subsystem integrated interface' triggers poor design quality. This study found out the factors affecting the delay of a project, analyzing cause-and-effect relationships between them in the academic side. From the practical view, it shows a solution to minimize delays in the project schedule for each of SI companies, hospitals and project managers.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

A Study on the Factors that Affect the On-Time Performances of Airline Companies (항공사 정시성에 영향을 주는 요인에 관한 연구)

  • Kwon, Bo-Hun;Jung, Jin-Young;Kim, Hyeon-Deok
    • Journal of Advanced Navigation Technology
    • /
    • v.25 no.5
    • /
    • pp.320-326
    • /
    • 2021
  • In airlines, on-time performance (OTP) is a measure of an airline's reliability and can be used as an important indicator when compared to other airlines. This study analyzed the effects and strength of delay factors on airline punctuality by analyzing the data of domestic K airlines for one year before and after March 2020, when the number of flights drastically decreased due to the corona virus. In addition, delays caused by seasonal weather effects were analyzed, and how the number of passengers who plummeted due to the corona situation had an effect on delay factors was studied. As for the delay factors, the delay codes of K airline which added its own codes to the delay codes of IATA, were applied. Based on the results of the analysis, we would like to suggest a method to minimize the delay.

Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project (사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안)

  • Cho, Tae-Jea;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Project delay is one of the most crucial impact factors in the construction process from a schedule and cost management perspective. This study focused on analyzing the causes of concrete frame work delay in the apartment construction project. According to the analysis of project cost composition, the direct cost of concrete works was highest in most samples. Actual delays of concrete works were analyzed for the six different construction components. Causes of delay were grouped into two categories; preconstruction and construction phases and these two groups were further divided into sub-groups. Analysis results revealed that the most significant delay was occurred in the 1st. floor concrete skeleton work. For each delay factor, implications of delay as well as suggestion(s) for reducing the possibility of schedule delay are provided.

Cause of Schedule delay-based Constraints Analysis Process (작업지연원인 기반 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.637-642
    • /
    • 2007
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of working progress makes higher. Finding each work's constraints performs constraints analysis in process of construction for checking probability of working progress. Grasp work's constraints through the constraints analysis and removes. This research will show preventing delay of consruction project, through constraints analysis process.

  • PDF

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Analysis of Time Delay for Stability of Discrete Control System (이산 제어 시스템의 안정도를 위한 시간 지연의 분석)

  • Kim, Byung-Ho;Eom, Kwang-Sik;Suh, Dong-Soo;Suh, Il-Hong
    • Proceedings of the KIEE Conference
    • /
    • 1999.11c
    • /
    • pp.687-689
    • /
    • 1999
  • 본 논문에서는 이산 제어 시스템의 작업 수행 시, 특정작업에 있어서의 불규칙한 시간 지연 때문에 시스템이 불안정해지는 것을 막기 위해 시간 지연을 갖는 시스템의 안정도를 분석한다. Soft real time OS인 Windows NT 운영체제를 갖는 PC-based 이산 제어 시스템에서는 하드웨어적으로 인터럽트를 사용하여 시간 제한성이 있는 작업을 수행한다. 그러나 인터럽트와 함께 수반되는 DPC(Deferred Procedure Call)의 불규칙한 수행 시간 때문에 다른 작업이 수행되어야 할 표본시간이 길어지게 된다. 이러한 현상으로 다른 작업의 시간 지연이 발생하게 되며, 시간 지연은 시스템을 불안정하게 하는 요인이 된다. 안정성 분석 면에서 보면, 시간 지연을 고려하지 않은 시스템의 극점은 안정한 위치에 존재하게 되는데 반해, 시간 지연을 고려한 시스템의 극점은 불안정한 위치에 존재하게 된다. 따라서 본 논문에서는 시간 지연이 존재하는 제어 시스템의 안정성을 보장하기 위해서 시스템의 안정성을 분석한다.

  • PDF

Work Condition Analysis Process for Improving Reliability of Work Plan (작업계획의 신뢰도 향상을 위한 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.36-44
    • /
    • 2009
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of work progress makes higher. Finding each work constraints performs constraints analysis in process of construction for checking probability of work progress. Grasp work constraints through the constraints analysis and removes. This research will show preventing delay of construction project, through work condition analysis process.

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.