• Title/Summary/Keyword: 제어오차

Search Result 1,931, Processing Time 0.033 seconds

Design of Digital Phase-locked Loop based on Two-layer Frobenius norm Finite Impulse Response Filter (2계층 Frobenius norm 유한 임펄스 응답 필터 기반 디지털 위상 고정 루프 설계)

  • Sin Kim;Sung Shin;Sung-Hyun You;Hyun-Duck Choi
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.19 no.1
    • /
    • pp.31-38
    • /
    • 2024
  • The digital phase-locked loop(DPLL) is one of the circuits composed of a digital detector, digital loop filter, voltage-controlled oscillator, and divider as a fundamental circuit, widely used in many fields such as electrical and circuit fields. A state estimator using various mathematical algorithms is used to improve the performance of a digital phase-locked loop. Traditional state estimators have utilized Kalman filters of infinite impulse response state estimators, and digital phase-locked loops based on infinite impulse response state estimators can cause rapid performance degradation in unexpected situations such as inaccuracies in initial values, model errors, and various disturbances. In this paper, we propose a two-layer Frobenius norm-based finite impulse state estimator to design a new digital phase-locked loop. The proposed state estimator uses the estimated state of the first layer to estimate the state of the first layer with the accumulated measurement value. To verify the robust performance of the new finite impulse response state estimator-based digital phase locked-loop, simulations were performed by comparing it with the infinite impulse response state estimator in situations where noise covariance information was inaccurate.

Manufacture and Qualification of Composite Main Reflector of High Stable Deployable Antenna for Satellite (위성용 전개형 고안정 반사판 안테나 주반사판 제작 및 검증)

  • Dong-Geon Kim;Hyun-Guk Kim;Dong-Yeon Kim;Kyung-Rae Koo;Ji-min An;O-young Choi
    • Composites Research
    • /
    • v.37 no.3
    • /
    • pp.219-225
    • /
    • 2024
  • It is essential to develop a light-weight, high-performance structure for the deployable reflector antenna, which is the payload of a reconnaissance satellite, considering launch and orbital operation performance. Among them, the composite main reflector is a key component that constitutes a deployable reflector antenna. In particular, the development of a high-performance main reflector is required to acquire high-quality satellite images after agile attitude control maneuvers during satellite missions. To develop main reflector, the initial design of the main reflector was confirmed considering the structural performance according to the laminate stacking design and material properties of the composite main reflector that constitutes the deployable reflector antenna. Based on the initial design, four types of composite main reflectors were manufactured with the variable for manufacturing process. As variables for manufacturing process, the curing process of the composite structure, the application of adhesive film between the carbon fiber composite sheet and the honeycomb core, and the venting path inside the sandwich composite were selected. After manufacture main reflector, weight measurement, non-destructive testing(NDT), surface error measurement, and modal test were performed on the four types of main reflectors produced. By selecting a manufacturing process that does not apply adhesive film and includes venting path, for a composite main reflector with light weight and structural performance, we developed and verified a main reflector that can be applied to the SAR(Synthetic Aperture Rader) satellite.

Review on hazardous microcystins originating from harmful cyanobacteria and corresponding eliminating methods (유해 남세균 유래 마이크로시스틴의 위해성과 제거 방안 고찰)

  • Sok Kim;Yoon-E Choi
    • Korean Journal of Environmental Biology
    • /
    • v.41 no.4
    • /
    • pp.370-385
    • /
    • 2023
  • Cyanobacterial harmful algal blooms (Cyano-HABs) are an international environmental problem that negatively affects the ecosystem as well as the safety of water resources by discharging cyanotoxins. In particular, the discharge of microcystins (MCs), a highly toxic substance, has been studied most actively, and various water treatment methods have been proposed for this purpose. In this paper, we reviewed adsorption technology, which is recognized as the most feasible, economical, and efficient method among suggested treatment methods for removing MCs. Activated carbons (AC) are widely used adsorbents for MCs removal, and excellent MCs adsorption performance has been reported. Research on alternative adsorption materials for AC such as biochar and biosorbents has been conducted, however, their performance was lower compared to activated carbon. The impacts of adsorbent properties(characteristics of pore surface chemistry) and environmental factors (solution pH, temperature, natural organic matter, and ionic strength) on the MCs adsorption performance were also discussed. In addition, toward effective control of MCs, the possibility of the direct removal of harmful cyanobacteria as well as the removal of dissolved MCs using adsorption strategy was examined. However, to fully utilize the adsorption for the removal of MCs, the application and optimization under actual environmental conditions are still required, thereby meeting the environmental and economic standards. From this study, crucial insights could be provided for the development and selection of effective adsorbent and subsequent adsorption processes for the removal of MCs from water resources.

A Development of Traffic Queue Length Measuring Algorithm Using ILD(Inductive Loop Detector) Based on COSMOS (실시간 신호제어시스템의 대기길이 추정 알고리즘 개발)

  • seong ki-ju;Lee choul-ki;Jeong Jun-ha;Lee young-in;Park dae-hyun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.3 no.1 s.4
    • /
    • pp.85-96
    • /
    • 2004
  • The study begin with a basic concept, if the occupancy length of vehicle detector is directly proportional to the delay of vehicle. That is, it analogize vehicle's delay of a occupancy time. The results of a study was far superior in the estimation of a queue length. It is a very good points the operator is not necessary to optimize s1, s2, Thdoc. Thdoc(critical congestion degree) replaced 0.7 with 0.2 - 0.3. But, if vehicles have been experience in delay was not occupy vehicle detector, the study is in existence some problems. In conclusion, it is necessary that stretch queue detector or install paired queue detector. Also I want to be made steady progress a following study relation to this study, because it is required traffic signal control on congestion.

  • PDF

Role of Radiation Therapy for Stage III Thymoma (제 3기 흉선종에서 방사선치료의 역할)

  • Chun, Ha-Chung;Lee, Myung-Za
    • Radiation Oncology Journal
    • /
    • v.19 no.1
    • /
    • pp.16-20
    • /
    • 2001
  • Purpose : To evaluate the effectiveness and tolerance of the postoperative radiation therapy for patients with Stage III thymoma and to define the optimal radiotherapeutic regimen Materials and Methods : We retrospectively analyzed the records of 24 patients with Stage III thymoma who were referred for postoperative radiation therapy in our institution from June, 1987 to May, 1999. Surgical therapy consisted of total resection in one patient, subtotal resection in seventeen, and biopsy alone in six patients. Age of the patients was ranged from 20 to 62 years with mean age of 47 years. Male to female ratio was 14 to 10. Radiation therapy was delivered with linear accelerator producing either 6 MeV or 10 MeV photons. The irradiated volume included anterior mediastinum and known residual disease. The supraclavicular fossae were not irradiated. The delivered total dose was ranged from 30 to 56 Gy. One patient received 30 Gy and eighteen patients received minimum of 50 Gy. Follow up period was ranged from 12 months to 8 years with median follow up of 40 months. Results : The overall local control rate for entire group of patients was $67\%$ at 5 years. The cumulative local failure rates at one, three and five year were $18\%,\;28\%\;and\;33\%$, respectively. In patients treated with subtotal resection and biopsy alone, local control rate was $76\%\;and\;33\%$, respectively. The actuarial observed survival rate at 5 years was $57\%$, and actuarial adjusted survival at 5 years was $72\%$. The difference between 5 year survival rates for patients treated with subtotal resection and biopsy alone was not statistically significant $(62\%\;vs\;30\%)$. Conclusion : We might conclude that postoperative radiation therapy was safe and effective treatment for patients with Stage III thymoma. Postoperative radiation therapy is recommended in cases where tumor margin is close or incomplete resection is accomplished.

  • PDF

A Design of PLL and Spread Spectrum Clock Generator for 2.7Gbps/1.62Gbps DisplayPort Transmitter (2.7Gbps/1.62Gbps DisplayPort 송신기용 PLL 및 확산대역 클록 발생기의 설계)

  • Kim, Young-Shin;Kim, Seong-Geun;Pu, Young-Gun;Hur, Jeong;Lee, Kang-Yoon
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.47 no.2
    • /
    • pp.21-31
    • /
    • 2010
  • This paper presents a design of PLL and SSCG for reducing the EMI effect at the electronic machinery and tools for DisplayPort application. This system is composed of the essential element of PLL and Charge-Pump2 and Reference Clock Divider to implement the SSCG operation. In this paper, 270MHz/162MHz dual-mode PLL that can provide 10-phase and 1.35GHz/810MHz PLL that can reduce the jitter are designed for 2.7Gbps/162Gbps DisplayPort application. The jitter can be reduced drastically by combining 270MHz/162MHz PLL with 2-stage 5 to 1 serializer and 1.35GHz PLL with 2 to 1 serializer. This paper propose the frequency divider topology which can share the divider between modes and guarantee the 50% duty ratio. And, the output current mismatch can be reduced by using the proposed charge-pump topology. It is implemented using 0.13 um CMOS process and die areas of 270MHz/162MHz PLL and 1.35GHz/810MHz PLL are $650um\;{\times}\;500um$ and $600um\;{\times}\;500um$, respectively. The VCO tuning range of 270 MHz/162 MHz PLL is 330 MHz and the phase noise is -114 dBc/Hz at 1 MHz offset. The measured SSCG down spread amplitude is 0.5% and modulation frequency is 31kHz. The total power consumption is 48mW.

An Analysis on Rater Error in Holistic Scoring for Performance Assessments of Middle School Students' Science Investigation Activities (중학생 과학탐구활동 수행평가 시 총체적 채점에서 나타나는 채점자간 불일치 유형 분석)

  • Kim, Hyung-Jun;Yoo, June-Hee
    • Journal of The Korean Association For Science Education
    • /
    • v.32 no.1
    • /
    • pp.160-181
    • /
    • 2012
  • The purpose of this study is to understand raters' errors in rating performance assessments of science inquiry. For this, 60 middle school students performed scientific inquiry about sound propagation and 4 trained raters rated their activity sheets. Variance components estimation for the result of the generalizability analysis for the person, task, rater design, the variance components for rater, rater by person and rater by task are about 25%. Among 4 raters, 2 raters' severity is higher than the other two raters and their severities were stabilized. Four raters' rating agreed with each other in 51 cases among the 240 cases. Through the raters' conferences, the rater error types for 189 disagreed cases were identified as one of three types; different salience, severity, and overlooking. The error type 1, different salience, showed 38% of the disagreed cases. Salient task and salient assessment components are different among the raters. The error type 2, severity, showed 25% and the error type 3, overlooking showed 31%. The error type 2 seemed to have happened when the students responses were on the borders of two levels. Error type 3 seemed to have happened when raters overlooked some important part of students' responses because she or he immersed her or himself in one's own salience. To reduce the above rater errors, raters' conference in salience of task and assesment components are needed before performing the holistic scoring of complex tasks. Also raters need to recognize her/his severity and efforts to keep one's own severity. Multiple raters are needed to prevent the errors from being overlooked. The further studies in raters' tendencies and sources of different interpretations on the rubric are suggested.

The feasibility evaluation of Respiratory Gated radiation therapy simulation according to the Respiratory Training with lung cancer (폐암 환자의 호흡훈련에 의한 호흡동조 방사선치료계획의 유용성 평가)

  • Hong, mi ran;Kim, cheol jong;Park, soo yeon;Choi, jae won;Pyo, hong ryeol
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.28 no.2
    • /
    • pp.149-159
    • /
    • 2016
  • Purpose : To evaluate the usefulness of the breathing exercise,we analyzed the change in the RPM signal and the diaphragm imagebefore 4D respiratory gated radiation therapy planning of lung cancer patients. Materials and Methods : The breathing training was enforced on 11 patients getting the 4D respiratory gated radiation therapy from April, 2016 until August. At the same time, RPM signal and diaphragm image was obtained respiration training total three steps in step 1 signal acquisition of free-breathing state, 2 steps respiratory signal acquisition through the guide of the respiratory signal, 3 steps, won the regular respiration signal to the description and repeat training. And then, acquired the minimum value, maximum value, average value, and a standard deviation of the inspiration and expiration in RPM signal and diaphragm image in each steps. Were normalized by the value of the step 1, to convert the 2,3 steps to the other distribution ratio (%), by evaluating the change in the interior of the respiratory motion of the patient, it was evaluated breathing exercise usefulness of each patient. Results : The mean value and the standard deviation of each step were obtained with the procedure 1 of the RPM signal and the diaphragm amplitude as a 100% reference. In the RPM signal, the amplitudes and standard deviations of four patients (36.4%, eleven) decreased by 18.1%, 27.6% on average in 3 steps, and 2 patients (18.2%, 11 people) had standard deviation, It decreased by an average of 36.5%. Meanwhile, the other four patients (36.4%, eleven) decreased by an average of only amplitude 13.1%. In Step 3, the amplitude of the diaphragm image decreased by 30% on average of 9 patients (81.8%, 11 people), and the average of 2 patients (18.2%, 11 people) increased by 7.3%. However, the amplitudes of RPM signals and diaphragm image in 3steps were reduced by 52.6% and 42.1% on average from all patients, respectively, compared to the 2 steps. Relationship between RPM signal and diaphragm image amplitude difference was consistent with patterns of movement 1, 2 and 3steps, respectively, except for No. 2 No. 10 patients. Conclusion : It is possible to induce an optimized respiratory cycle when respiratory training is done. By conducting respiratory training before treatment, it was possible to expect the effect of predicting the movement of the lung which could control the patient's respiration. Ultimately, it can be said that breathing exercises are useful because it is possible to minimize the systematic error of radiotherapy, expect more accurate treatment. In this study, it is limited to research analyzed based on data on respiratory training before treatment, and it will be necessary to verify with the actual CT plan and the data acquired during treatment in the future.

  • PDF

Control of Daily Integral PPE by the Artificial Lighting and shading screen In Greenhouse (인공광 및 차광스크린을 이용한 온실의 일일적산 광합성유효광량자속 조절)

  • 이현우
    • Journal of Bio-Environment Control
    • /
    • v.12 no.1
    • /
    • pp.45-53
    • /
    • 2003
  • The object of this study was to develop the control technology of daily integral photosynthetic photon flux (PPF) by the artificial lighting and shading screen in greenhouse. The shading time needed to get the target PPF by using two types of shading screens having shading ratio of 55% and 85% was analyzed. The results showed the shading ratio of screen to be installed in greenhouse should be different depending on the amount of target PPF to be controlled. The PPF control experiment by using the 55% shading screen in July and August showed that the maximum difference between measured and calculated value was about 5 mol$.$ $m^{-2}$ $.$ $d^{-1}$ in no shading condition. This difference is satisfactory result because the daily integral PPF is quite different depending on the weather condition. The simulation result about PPF distribution pattern shortened the time needed to find the proper arrangement of artificial lightings in greenhouse. But the further study was required to find the supplemental lighting arrangement to be able to provide the exactly uniform distribution of target light intensity. The supplemental irradiation time needed to acquire the target daily integral PPF for different supplemental light intensities, weather conditions, and months was analyzed. The result showed that the supplemental light intensity should be decided depending on the amount of target PPF to be controlled. The result of PPF control experiment conducted by using 55% shading screen and 300 $\mu$mol$.$ $m^{-2}$ $.$ $s^{-1}$ supplemental light intensity from the end of May to the beginning of June showed that the maximum difference between target and measured value was about 3 mol$.$ $d^{-1}$ $.$ $m^{-2}$ . If we consider that the difference of the daily integral PPF depending on weather condition was the maximum 30 mol$.$ $m^{-2}$ $.$ $d^{-l}$, the control effect was acceptable. Although the result of this study was the PPF control technology to grow lettuce, the data and control method obtained could be employed for other crop production.n.

A Study on Implementation and Performance of the Power Control High Power Amplifier for Satellite Mobile Communication System (위성통신용 전력제어 고출력증폭기의 구현 및 성능평가에 관한 연구)

  • 전중성;김동일;배정철
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.4 no.1
    • /
    • pp.77-88
    • /
    • 2000
  • In this paper, the 3-mode variable gain high power amplifier for a transmitter of INMARSAT-B operating at L-band(1626.5-1646.5 MHz) was developed. This SSPA can amplify 42 dBm in high power mode, 38 dBm in medium power mode and 36 dBm in low power mode for INMARSAT-B. The allowable errol sets +1 dBm as the upper limit and -2 dBm as the lower limit, respectively. To simplify the fabrication process, the whole system is designed by two parts composed of a driving amplifier and a high power amplifier. The HP's MGA-64135 and Motorola's MRF-6401 were used for driving amplifier, and the ERICSSON's PTE-10114 and PTF-10021 for the high power amplifier. The SSPA was fabricated by the RP circuits, the temperature compensation circuits and 3-mode variable gain control circuits and 20 dB parallel coupled-line directional coupler in aluminum housing. In addition, the gain control method was proposed by digital attenuator for 3-mode amplifier. Then il has been experimentally verified that the gain is controlled for single tone signal as well as two tone signals. In this case, the SSPA detects the output power by 20 dB parallel coupled-line directional coupler and phase non-splitter amplifier. The realized SSPA has 41.6 dB, 37.6 dB and 33.2 dB for small signal gain within 20 MHz bandwidth, and the VSWR of input and output port is less than 1.3:1. The minimum value of the 1 dB compression point gets more than 12 dBm for 3-mode variable gain high power amplifier. A typical two tone intermodulation point has 36.5 dBc maximum which is single carrier backed off 3 dB from 1 dB compression point. The maximum output power of 43 dBm was achieved at the 1636.5 MHz. These results reveal a high power of 20 Watt, which was the design target.

  • PDF