• Title/Summary/Keyword: 작업지연요소

Search Result 75, Processing Time 0.03 seconds

An Analysis on Work Delaying Factors in Apartment Building Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.496-501
    • /
    • 2006
  • Work delay is the one of facts that make the reliability of construction business decrease. Building a causal classification system of work delay and deducing the managemental item for it gives a great competition to the construction industry. It is, however, so rare to study about work delay so far. Therefore, this research analyzed a questionnaire, which is focussing on the public apartment construction, to look into the causal root factors and deduce the work delay factors. Finally, we suggest a major managing point to remove effectively the work delay factors.

  • PDF

An Analysis on Work Delay Factors in Apartment House Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.159-166
    • /
    • 2007
  • Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.

THE ROOT CAUSE ANALYSIS METHOD FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석방법)

  • Ji, Kun-Chang;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.131-136
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity. and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay. Moreover, the analysis method did not consider the trait, which cause the schedule delay, in constructing projects. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

  • PDF

THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석 프로세스)

  • Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.138-148
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity, and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay, and the range of analysis method of the cause structure of schedule delay has been multifarious from industrial views to views of specific work. Moreover, the classifying system and analysis method did not consider the trait, which cause the schedule delay, in constructing projects. For this reason, it is difficult to compare the cause of delay factors of the projects and to understand the effect of schedule delay by each factor. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

아리랑위성 2호 발사 후 검보정

  • Lee, Dong-Han;Seo, Du-Cheon;Song, Jeong-Heon;Park, Su-Yeong;Im, Hyo-Suk
    • Proceedings of the KSRS Conference
    • /
    • 2007.03a
    • /
    • pp.29-32
    • /
    • 2007
  • 2006년 7월 28일 발사 된 아리랑위성 2 호 검보정 작업은 발사 한 달 후인 8월 말부터 본격적으로 시작되었다. 아리랑위성 2호 검보정의 첫 단계로 위성의 상태를 판단할 수 있는 정보를 수집하여 재정리하는 작업부터 시작하였으며, 곧바로 아리랑위성 2호의 기본 설정 값들을 결정하는 작업을 마무리하였다. 이후, 복사 검보정, 공간 검보정, 기하 검보정 작업들이 순차적으로 진행되었지만, 검보정 작업을 진행하는 과정에서 발사 전에 고려하지 못 했던 요소들이 발견되었고, 위성과 사용자 간의 요구사항 정확도 차이에서 오는 문제점들이 검보정 작업 진행 중에 나타남에 따라 검보정 작업이 지연되었다. 발사 전에 계획되었던 검보정 계획에 비해 일정 지연이 있었으나, 현재는 아리랑위성 2호 영상자료를 사용할 수 있는 기본 영상 품질을 만족한 상태이며, 향후 계속해서 아리랑위성 2호 기본 사양을 넘는 영상자료의 품질을 향상시키기 위한 검보정 작업이 계획대로 진행될 예정이다.

  • PDF

Task Allocation strategy for Distributed/Parallel Computing based on Realtime Network Monitoring (실시간 네트워크 모니터링 기반 분산/병렬 컴퓨팅의 작업 할당 전략)

  • 정재홍;김수자;박복자;송은하;정영식
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10c
    • /
    • pp.631-633
    • /
    • 2003
  • 인터넷 가반 분산/병렬 처리 프레임 워크 PDP(Parallel/Distributed Processing Scheme on Web)는 네트워크 내 유휴 상태 호스트들을 활용하여 대용량 작업을 병렬로 처리한다. 본 논문에서는 이러한 서브 작업을 할당받는 자원이 동작하는 네트워크 환경을 모니터링 함으로써 수시로 변화하는 네트워크 환경에 대처하는 방안을 제시한다. 특히 네트워크 환경 모니터링 예측 결과를 PDP의 작업 할당 알고리즘에 적용하여 네트워크 과부하 및 결함 등으로 인해 발생되는 작업 지연 요소에 적응적 대처함으로써 전체 작업 수행 처리율 향상을 도모하는 방법을 제안한다.

  • PDF

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

The Effects of Non-verbal Voice Components of Occupational Therapist on the Respondents's Attitude of Acceptance (작업치료사의 비언어적인 목소리 구성요소가 대상자의 수용적 태도에 미치는 효과)

  • Hong, Yong-Hyun;Kang, Sae-Mi;Park, Su-Bin;Lim, Da-In;Han, Ji-Yun;Park, Ji-Yeon;Kim, Eun-Joo
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.7
    • /
    • pp.235-241
    • /
    • 2019
  • The purpose of this study is to investigate the effect of the nonverbal voice component of the occupational therapist on the respondent's attitude of acceptance The study method was to randomly selected and provided 4 voice samples which were from the current female occupational therapist and adjusted its pause and tempo to participants who visited the local health center. After providing voices, the participants were asked to complete the survey including the questions about the acceptance attitude according to voice components. The study results showed that there were statistically significant differences in attitudes of "likeability", "credibility," "concentration", "expertise", "comprehension" (p<.05). Findings suggested that client's attitude of acceptance may change according to non-verbal voice components of the therapist.

Prediction of Principal Frequency of Ground Vibration from Delayed Blasting (지연시차에 따른 발파진동의 주파수 특성 예측)

  • Chung, Doo-Sung;Kang, Choo-Won;Ko, Jin-Seok;Chang, Ho-Min;Ryu, Pog-Hyun
    • Tunnel and Underground Space
    • /
    • v.20 no.2
    • /
    • pp.112-118
    • /
    • 2010
  • Before blasts that can have direct impacts on human bodies or structures, it is necessary to assess impacts of ground vibration. Therefore, frequency has been recognized as an important factor in order to assess impact on ground vibration and damages. There have been many studies on impacts of frequency. But, there have been no studies on relations between vibration and frequency according to delay time difference. In this study, we examined the relations between delay time difference and frequency according to each frequency with which reinforcement and destructive intervention repeat through delay time difference obtained using superposition modeling of single hole blasting waveform based on the theory of time difference developed by Langefors.