1 |
류한국, 유정호, 이현수 (2002). '손실생산성을 고려한 공기지연일수 산정방법' 건축, 제18권 10호, 대한건축학회, pp. 117-124
|
2 |
표영민, 배수용, 유형한, 이상범 (2005). 'AHP기법을 이용한 건설노동생산성 저하요인 분석에 관한 연구' 한국건축시공학회 학술.기술논문발표회 논문집, 제5권 1호, 한국건축시공학회, pp. 141-148
|
3 |
Department of Energy. et. al (1992). 'Root cause analysis guidance document' Washington, D.C., U.S., 69 pp
|
4 |
H. Glenn Ballard (2000). 'The last planner system of production control' Ph.D, Univ. of Birmingham, 192 pp
|
5 |
Jimmie Hinze, Caroline Pedersen, John Fredley (1998). 'Identifying root causes of construction injuries' ASCE, J. of Constr. Engrg. and Mgmt., 124(1), pp. 67-71
DOI
ScienceOn
|
6 |
Johan s. carlson, Rikard S?derberg (2003). 'Assembly root cause analysis: A way to reduce dimensional variation in assembled products' The international journal of flexible manufacturing systems, Netherlands, pp. 113-150
|
7 |
Office of Safety and Mission Assurance, Chief Engineers Office (2003), 'Root cause analysis overview' NASA report, (2006. 3. 25)
|
8 |
Saied Kartam (1999). 'Generic Methodology for Analyzing Delay Claims' ASCE, J. of Constr. Engrg. and Mgmt., 125(6), pp. 409-419
DOI
|
9 |
Said A. Assaf, Mohammed Al-Khalil, Muhammad Al-Hazmi (1995) 'Cause of delay in Large Building Construction Projects' ASCE, J. of Mgnt. in Engrg., 11(2), pp. 45-50
DOI
ScienceOn
|
10 |
한종관, 진상윤, 김예상 (2003) '시공자 중심의 주요 공종별 공기지연 원인분석에 관한 연구-공동주택을 중심으로' 건축, 제19권 3호, 대한건축학회, pp. 163-170
|
11 |
Chris J. Eagle, Jan M. Davies, J. Reason (1992). 'Accident analysis of large-scale technological disasters applied to an anaesthetic complication' Canadian journal of anaesthesia, 39(2), pp. 118-122
DOI
|
12 |
김선국, 송용식, 이종국 (2006). ' 潛在的클레임이 公共아파트 工事管理에 미치는 영향요인분석' 대한건축학회 논문집(구조계), 제22권 4호, 대한건축학회, pp. 187-195
|
13 |
Alkass, S., Mazerolle, M., Tribaldos, E., and Harris, F. (1995). 'Computer aided construction delay analysis and claims preparation' ASCE, J. of Constr. Engrg. and Mgmt., 13(4), pp. 335-352
|
14 |
Augustine U. Elinwa, Mangvwat Joshua (2001). 'Timeoverrun factors in nigerian construction industry' ASCE, J. of Constr. Engrg. and Mgmt., 127(5), pp. 419-425
DOI
ScienceOn
|
15 |
M.Z. Abd. Majid (1998). 'Factors of Non Excusable Delays That Influence Contractors 'Performance' J. of Mgmt in Engrg., 14(3), pp. 42-49
DOI
ScienceOn
|
16 |
Iamara Rossi Bulh.oes1, Flavio Augusto Picchi2 and Ariovaldo Denis Granja(2000), 'Combining value stream and process levels analysis for continuous flow implementation in construction', Proceeding of the 14th annual conference of the international group for lean construction(IGLC-14), Sydney, Australia, July, pp. 99-107
|
17 |
Paulo Andery, Antonio N. Carvalho Jr., and Horacio Helman (1998). 'Looking for what could be wrong: an approach to lean thinking' Proceeding of the 6th annual conference of the international group for lean construction(IGLC-6), (2006. 3. 28)
|
18 |
H. Randolph Thomas, Ahmet S. Sakarcan (1994). 'Forecasting Labor Productivity Using Factor Model' ASCE, J. of Constr. Engrg. and Mgmt., 120(1), pp. 228-239
DOI
ScienceOn
|
19 |
문정문 (2002). '가치흐름분석을 통한 건설 프로세스의 낭비제거 방법-철근공사를 중심으로' 광운대학교 대학원 건축공학과, 석사논문, 108 pp
|
20 |
홍영탁, 유정호, 임경호, 이현수 (2005).'FMEA를 이용한 초고층 건축시공의 공기영향요인 평가' 대우건설기술, 제27호, pp. 149-163
|
21 |
Tariq S. Abdelhamid, John G. Everett (2000). 'Identifying Root Causes of Construction Accidents' ASCE, J. of Constr. Engrg. and Mgmt., 126(1), pp. 52-60
DOI
ScienceOn
|
22 |
Daud Nasir, Brenda McCabe, Loesie Hartono (2003) 'Evaluating Risk in Construction-Schedule Model (ERIC-S): Construction Schedule Risk Model' ASCE, J. of Constr. Engrg. and Mgmt.,, 129(5), pp. 518-527
DOI
ScienceOn
|
23 |
Gary R. Smith, Caryn M. Bohn (1999). 'Small to Medium Contractor Contingency and Assumption of Risk' ASCE, J. of Constr. Engrg. and Mgmt., 125(2), pp. 101-108
DOI
ScienceOn
|