Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works  

Lee, Seung-Hoon (Department of Sustainable Architectural Engineering, HanYang University)
Kim, Yong-Man (Department of Architectural Engineering, HanYang University)
Kim, Ju-Hyung (Department of Architectural Engineering, HanYang University)
Kim, Jae-Junn (Department of Architectural Engineering, HanYang University)
Publication Information
Journal of the Korea Institute of Building Construction / v.11, no.1, 2011 , pp. 73-81 More about this Journal
Abstract
The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.
Keywords
Process Control; Construction Ddelay; Finishing Work Duration; Work Delay Factor;
Citations & Related Records
Times Cited By KSCI : 8  (Citation Analysis)
연도 인용수 순위
1 Kim SJ, Shin KC, Kim JJ. Analyzing Influential Factors in the Procurement Process of Finishing Materials for Building Construction Site, Journal of the Architectural Institute of Korea 2003;19(9):155-8.   과학기술학회마을
2 Han JG, Kwon SW, Cho MY. Development of Material Management System and Field Tests Using RFID Technology on High-Rise Building Construction, Journal of the Architectural Institute of Korea 2006;22(10):121-8.   과학기술학회마을
3 Han JH, Kim DY, Lee HK. A Study on Constraint Analysis Checklist of Constrcution Project, Proceeding of Annual Conference of the Architectural Institute of Korea Structure & Construction 2008;(1):437-6.
4 Said A. Assaf, Mohammed Al-Khalil, Muhammad Al-Hazmi. Cause of Delay in Large Building Construction Projects, ASCE, Journal of Construction Engineering and Management 1995;11(2):45-6.
5 Saied Kartam. Generic Methodology for Analyzing Delay Claims, ASCE, Journal of Construction Engineering and Management 1999;125(6):409-11   DOI
6 Kim MS, Kwon OC, Kim KH. Time Management of Construction, Ki Moon Dang Publishing;2001.
7 Lee JD. A Work Interference Management Model for Apartment Building Finish Works[MA dissertation]. Seoul: Chung-Ang University;2009.
8 Kim YJ, Han JY, Shin DW, Kim KR, Kim CD, Seo SW. A Tact Planning and Scheduling Process Model for Reduction of Finishing Work Duration in Building Construction Projects, Journal of the Architectural Institute of Korea 2003;19(1):161-7.   과학기술학회마을
9 Lee WS. A Development Management and Analysis of Delay Claim Risk Factor for Finish Work Schedule in Apartment Housing Projects[MA dissertation]. Seoul: Han-Yang University;2004.
10 Bramble, B. B. and Callahan, N. T. Construction Delay Claim, 2nd, John Wiley & Sons; 1992.
11 Park CW, Yun SH. A Case Study on Reason Analysis for Schedule Delay of Apartment House, Journal of the Korea Institute of Building Construction 2009;9(1):89-6.   과학기술학회마을   DOI   ScienceOn
12 Han JK, Chin SY, Kim YS. An Analysis on Delay factors of Major Trades in Apartment Housing Projects, Journal of the Architectural Institute of Korea 2003;19(3):163-8.   과학기술학회마을
13 Ji KC, Yu JH, Kim CD. The Schema of Work Delay Analysis by Input Factor in Construction, Journal of the Architectural Institute of Korea 2006;22(11):181-8.   과학기술학회마을
14 Jung JH, Lee G, Hong GH, Lee CH. An Analysis on Difficulties and Delay Factor for the Development and Application of Technologies for Reduction of Construction Duration, Journal of the Architectural Institute of Korea 2010;26(1):121-8.