• Title/Summary/Keyword: 자재

Search Result 2,422, Processing Time 0.028 seconds

Comparison of Heat Insulation Characteristics of Multi-layer Thermal Screen and Development of Curtain System (다겹보온자재의 보온성 비교 및 커튼개폐장치 개발)

  • Lee, Si-Young;Kim, Hark-Joo;Chun, Hee;Yum, Sung-Hyun;Lee, Hyun-Joo
    • Journal of Bio-Environment Control
    • /
    • v.16 no.2
    • /
    • pp.89-95
    • /
    • 2007
  • This study was accomplished to compare energy saving effects of several heat insulation materials in greenhouse and to develop new automatic opening and closing equipment which is suitable to the most effective heat insulation material. To find out more effective heat insulation material, the magnitude of heat transfer occurred through aluminum screen (ALS), non-woven fabric (NWF), double-layer aluminum screen with chemical cotton sheet (DAL), and multi-layer fabric screen material quilted with non-woven fabric, chemical cotton, poly foam, and polypropylene (MLF) were compared relatively. The results showed that the relative magnitude of heat transfer occurred through MLF was lower than DAL and ALS by 23.3% and 43.0% respectively. MLF screen material was the most effective compared with other heat insulation materials. But because of thickness, there was a need of new mechanism for automatic operation in greenhouse. Accordingly, new screen system using MLF-thick but profitable for keeping warm in greenhouse-was developed. Opening & closing equipment was designed to roll MLF with pipe axis during opening process and pull MLF with string during closing process with electric motors, clutches, drums, and so on. In hot pepper cultivation and energy saving test during winter time, the early stage yield of pepper under MLF screen system was higher than NWF by 27%, and gasoline consumption of MLF screen system was lower than NWF by 46%.

Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing (지급자재 조달관리부담 평가에 기초한 중소기업 공사용자재 직접구매제도 대응방안: 공공아파트를 공급하는 발주자를 중심으로)

  • Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.425-434
    • /
    • 2013
  • The Small and Medium Business Administration specified 123 construction materials mandatory to purchase directly and forced the public owners to provide the contractors with materials as required by related law. This study extensively reviewed various characteristics and management factors of the owner-providing materials consumed in the public apartment housing under Direct Buying System(DBS) from the public owner's perspective. Subsequently, the major managed materials were identified, and the proper response plan was developed along the material procurement process. The Procurement Management Load Indices (PMLI) of 43 materials were evaluated according to rating criteria with procurement path, project-specified level, user requirement level, supplier's responsibility, on-site work requirement, additional parts, and inspection standards. The tile and aluminum windows were classified in the group needing high-level procurement efforts to reduce the errors and ensure the efficiency. The accurate quantity estimation method, definite purchase details, management activity definition before and after production, additional quantity for rework, interference coordination were defined as the essential activities for effectively responding to DBS.

BIM Based Time-series Cost Model for Building Projects: Focusing on Construction Material Prices (BIM 기반의 설계단계 원가예측 시계열모델 -자재가격을 중심으로-)

  • Hwang, Sung-Joo;Park, Moon-Seo;Lee, Hyun-Soo;Kim, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.111-120
    • /
    • 2011
  • High-rise buildings have recently increased over the residential, commercial and office facilities, thus an understanding of construction cost for high-rise building projects has been a fundamental issue due to enormous construction cost as well as unpredictable market conditions and fluctuations in the rate of inflation by long-term construction periods of high-rise projects. Especially, recent violent fluctuations of construction material prices add to problems in construction cost forecasting. This research, therefore, develops a time-series model with the Box-Jenkins methodologies and material prices time-series data in Korea in order to forecast future trends of unit prices of required materials. BIM (Building Information Modeling) approaches are also used to analyze injection time of construction resources and to conduct quantity takeoff so that total material price can be forecasted. Comparative analysis of Predictability of tentative ARIMA (Autoregressive Integrated Moving Average) models was conducted to determine optimal time-series model for forecasting future price trends. Proposed BIM based time series forecasting model can help to deal with sudden changes in economic conditions by estimating future material prices.

법령과 고시 ① - '고무발포단열재' 공사용 자재 직접구매 품목 제외

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.306
    • /
    • pp.87-93
    • /
    • 2016
  • 중소기업청은 지난 해 12월 30일 '중소기업자간 경쟁제품 지정내역 및 공사용 자재 직접구매 대상품목'을 개정하고 올해 1월 1일부터 3년(2018.12.31)간 적용에 들어갔다. 개정된 공사용 자재 직접구매 대상품목 중 그동안 대한기계설비건설협회(회장 이상일)가 지정 제외를 위해 총력을 기울였던 고무발포단열재가 기존 공사용자재 직접구매 대상품목 중에서 유일하게 제외됐다. 새로 개정된 공사용 자재 직접구매 대상품목은 고무발포단열재, 애자, 공기살균기, 플라스틱포대 등 4개 품목이 빠지고 신규 지정을 신청한 12개 품목 중 8개(커튼, 차양, 볼라드, 잡석, 데이터 포트장치, 디지털영상 정보 안내시스템, 막구조물, 포설형 탄성 포장재)만 채택돼 총 127개 품목으로 확정됐다. 고무발포단열재가 공사용 자재 직접구매 대상품목에서 제외됨으로써 앞으로 기계설비건설업계의 매출 신장과 생산성 향상에 크게 기여할 것으로 기대되고 있다.

  • PDF

A Conceptual Model Study For J.I.T(Just In Time) Construction Managemaent On High-rise Building-Concerned On Resource Life Cycle Of Concrete Construction- (고층건축공사 적시생산을 위한 관리모델 사례 -콘크리트 자재의 Life Cycle을 중심으로-)

  • Song Young-Suk;Lim Hyung-Chul;Choi Yun-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.127-134
    • /
    • 2001
  • Effectiveness of Just in time managing system can be obtained by removing unexpected lead-time and maintaining consistency on the physical transportation of construction resource. Construction resource management is essential on checking on load data from production of shop to field, and it is based on building resource life cycle information. In this study, production, transportation, and assembly disciplines of concrete construction should real time communications exchanging information related to shop-field with each other, Establishing information support system is an important initial step for promoting active cooperations among these resource life cycle on data flow. To achieve this, on suitable using management point, we suggest a concrete construction control model.

  • PDF

An Application for Tracking the Location of Material using RFID and Wireless Network Technology (RFID와 무선네트워크 기술을 이용한 자재위치파악 방안)

  • Lee, Nam-Su;Song, Jae-Hong;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.523-528
    • /
    • 2006
  • The management of construction materials is one of the important administration factor to perform construction projects. If it is not flexible to supply necessary materials to a workplace at a proper time, some problems such as a construction cost increase, an operation delay, a lowering of work efficiency and etc. could occur during the progress of work. Therefore, tracking the precise location of materials is important and necessary to input materials in the accurate place. Although Location sensing techniques comprise GPS, Active Badge, EasyLing and so forth, there are technical limitations to apply these techniques on construction site. Accordingly, in this paper, we propose the technically feasible method to automatically locate materials on site using recent RFID and wireless network technologies.

  • PDF

Optimization of Multiple Tower Cranes and Material Stockyards Layout (다중 양중장비와 자재 야적 위치의 최적 결정을 위한 모델 개발)

  • Kim, Kyong-Ju;Kim, Kyoung-Min;Lee, Sang-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.127-134
    • /
    • 2009
  • This study aims to provide an optimal model for the layout of multiple tower cranes and material stockyards which have multiple candidate positions. In a high-rise building construction, the positional allocation of tower cranes and material stockyard has an effect on the travel time of material hauling. In addition, in case of using multiple tower cranes, specific location of a tower crane allocated to each material determines the efficiency of the works. Current optimal model limited to the optimization of position of single tower crane and material stockyards. This study suggests optimal model both for the positions of multiple tower cranes and material stockyards. Layout of multiple tower cranes requires additional allocation of each crane to each material hauling and control on the minimum distance between tower cranes. This optimization model utilizes genetic algorithm to deal with complex interaction on the candidate positions of multiple tower cranes, material stockyards, and types of materials. In order to identify its utility, case study was performed.

A Study on the Degradation of Polymer-Coated Stesl in 0.5M NaCl Solution (0.5M NaCl 용액내에서 일어나는 고분자재료로 피복된 강의 퇴화에 관한 연구)

  • Byeon, Su-Il;Jeong, In-Jo;Mun, Seong-Mo;An, Sang-Ho
    • Korean Journal of Materials Research
    • /
    • v.6 no.10
    • /
    • pp.1025-1033
    • /
    • 1996
  • 본 연구에서는 0.5M NaCI 용액내에서 일어나는 고분자재료로 피복된 강의 퇴화현상을 광학현미경 관찰 및 A.C. impedance spectroscopy를 이용하여 연구하였다. 강의 부식은 고분자재료로 피복된 강의 경우 국부부식(localized corrosion)의 형태로 나타난 반면, 피복되지 않은 강의 경우에는 전면부식(uniform corrosion)의 형태로 진행되었다. 고분자재료로 피복된 강의 부식이 국부적으로 진행되는 것은 피복층내에 존재하는 기공이나 크랙과 같은 결함 등에서 부식이 선택적으로 일어나기 때문으로 사료된다. 피복층의 박리(delamination) 현상은 고분자재료로 피복된 강/구리 갈바닉쌍(galvanic couple)의 경우 구리표면 위의 피복층에서만 관찰되었다. 이는 캐소드(cathode)로 작용하는 구리의표면에서 산소의 환원반응에 의해서 형성된 수산화이온(OH-)이 피복층의 박리를 조장하고 있음을 보여준다. 또한, 고분자재료 피복층의 파손 현상은 고분자재료/강의계면에서 석출된 부식생성물에 의해서 크게 조장되고 있음을 알 수 있다.

  • PDF

A Simple Formula for the Number of Lifting Times of Finishing Materials in High-rise Complex Building Construction (마감자재 양중횟수 산정 약산식 제안 - 초고층 주상복합 건물)

  • Mun Min-Sik;Choi Seock-Hyun;Hyun Chang-Taek;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.622-625
    • /
    • 2003
  • The purpose of the study is to propose a simple formula of lifting times of finishing materials on establishing the high-rise complex building, it is expected to help the efficient planning of lifting. The planning of lifting the finishing materials becomes important as the buildings get higher. The efficient level of lifting times has been calculated from 'Packaging' to improve the existing studies on the planning of lifting ; 'Packaging' means 'Making a bundle as one unit' basing on the characteristics of the individual materials. The simple formula has been produced regarding two variables of the typical floor area and the number of rooms per area.

  • PDF

A Study of the High-rise building's Lift-up Management - through Division of Loading Factors of Equipment materials (초고층 건축 공사의 효과적인 양중 제안 - 설비공사 양중부하 분배 개선 방안)

  • Chung Yun-Woo;Kim Eun-Sang;Suh Hyun-Ah;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.539-542
    • /
    • 2004
  • Nowadays, High-rise building becomes higher and bigger than ever. As a result, lots of construction materials are needed at the same times. Because of divided diverse process of construction, several different Processes concur simultaneously with complexity of procurement. So, effective construction material supply and lift-up are essential part of the spot. Especially, when ending part of construction, there are much conflict between finishing and equipment materials also problems of folding lift-up. The Purpose of this paper is suggesting better effective lift-up system through analysis of loading factors.

  • PDF