• Title/Summary/Keyword: 입찰

Search Result 933, Processing Time 0.026 seconds

Implementation of Fuzzy Comprehensive Evaluation System for Multi-level Decision Making (다층 의사결정을 위한 퍼지 포괄 평가 시스템 구축)

  • Park, Yong Kuk;Lee, Min Goo;Jung, Kyung Kwon;Won, Young-Jin
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.7
    • /
    • pp.169-177
    • /
    • 2015
  • This paper described a fuzzy comprehensive evaluation method and implemented assessment system for multi-layer decision making. The proposed method is a assessment before bidding through the key questions using fuzzy comprehensive evaluation method and the entropy weights. The key questions are given by the wider investigation of major sports event organizers. The paper carried out evaluation of single factor and fuzzy comprehensive evaluation from low layer to high layer step by step. In order to verify the effectiveness of proposed method, we built the sports event management service platform (SEMSP) for assessment of applicant city. This method represents a unified one of the quantitative results and the qualitative results based on the judgment of experts.

Risk Attitude Analysis between Construction Investor and Loan Investor in International PPP Project (해외투자개발사업의 건설투자자와 금융투자자간 리스크 태도 분석)

  • Park, Chan Young;Han, Seung-Heon;Jung, Wooyong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.137-148
    • /
    • 2019
  • Many construction developers have tried to develop the international PPP (Public-Private Partnership) projects but frequently failed to gain loan investor approval from loan investor. Many of these failures were caused by the risk attitude gaps among project stakeholder. This study aims to compare the risk attitude between the construction investor and loan investor. This study investigated how much differently 21 construction investors and 21 loan investor recognize the risk magnitude corresponding to the same three risk status of 27 risk factors. Construction investors show a more risk-seeking attitude than loan investor in 58 of 81 risk status. Loan investors show a more risk-averse attitude than construction investors in 9 risk factors. These results will contribute to developing the successful PPP project by reducing the risk perception gap between construction investors and loan investors.

A Study on the Product Qualification Criteria through Monte-Carlo Simulation and Association Rule Analysis (군수품 조달을 위한 물품적격심사기준의 조달특성 및 심사분야 배점의 적절성에 관한 연구)

  • Ahn, Namsu;Yeo, Yongheon
    • Journal of the Korea Society for Simulation
    • /
    • v.29 no.4
    • /
    • pp.65-72
    • /
    • 2020
  • The purpose of this study is to analyze the adequacy of product qualification criteria through Monte-Carlo simulation and association rule analysis. We first surveyed the similar procurement systems, then we simulated the bid situation that randomly generated several vendors participated in a bid, and they obtained the score according to the product qualification criteria's judgement area. Then, the company with the highest score will win the bid, and further analysis was performed in terms of performance indicator and satisfaction ratio. The results of this study can be summarized as follows; Although the items related to the credibility accounted for the largest number items, it did not affect the actual bid results. It was analyzed that it is desirable to increase the allocation points in the area of business status and technical capability review than the current one.

An Investigative Study on the Impact of Construction Policies on Market Entry and Exit of Construction Companies in Daegu and Gyeongbuk Province (건설정책이 대구·경북지역 건설기업의 시장 진입과 퇴출에 준 영향에 관한 조사연구)

  • Song, Jin-Hyang;Lee, Yoonseock
    • Knowledge Management Research
    • /
    • v.24 no.2
    • /
    • pp.211-240
    • /
    • 2023
  • The purpose of this study is to analyze empirically the effects of changes in policies of the construction industry on the entry and exit in the construction industry and to present the direction of changes in construction industry policies based on the analysis results. The purpose of this study is also to present by analyzing the factors influencing the increase and decrease of builders in the actual construction market. The results of the survey indicate that for general contractors in Daegu and Gyeongbuk, which are mostly small and medium-sized construction companies, the strengthening of registration standards (capital, technicians, etc.) has a significant impact on market entry and exit. However, on the other hand, many of the construction policies implemented to eliminate unqualified contractors in the construction market have had the effect of increasing the number of unqualified contractors. This suggests that construction policies in the construction cycle have not achieved their objectives.

The Corresponding Plan for Integrated Environment-the Lowest Cost Bid and The Current Cost Estimate System (최저가입찰제 및 실적공사비적산 환경에서의 대응방안)

  • Kim, Byeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.849-859
    • /
    • 2006
  • Earnings of domestic enterprises are expected a serious damage because the lowest cost bid system and the current cost estimate system. In 2005 average successful bid rate for the lowest cost bid project is below 60%, this is not reach at the operating budget of enterprise. Many problems such as illegal construction, low price subcontract, chain enterprise loss com in to practice because of low successful bid rate. In addition earnings of the enterprises expected to be the minimum, because of enlarge execution of the current cost estimate system. This study tries to lend assistance by giving alternative for the construction enterprise by presenting the bid system, investigate and compare foreign system with domestic and analyze correlation of the lowest cost bid and the current cost estimate system.

Improvement Plan of Post Construction Evaluation: Focus on Construction Performance (건설공사 사후평가 개선방안: 사업수행성과 중심으로)

  • Park, Heesung;Kim, Tae Yeong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.3
    • /
    • pp.375-383
    • /
    • 2024
  • The size of the construction industry is increasing, and its impact on the entire national industry is also significant. However, construction cost increases, construction period delays, safety accidents, and quality problems occur during the construction process. This paper analyzed the construction cost, construction period, and change order performance for civil infrastructures for which post evaluation was performed. The analysis was conducted by dividing civil engineering facilities by type, construction nature, construction cost, contract nature, and delivery method. Planned and actual construction cost and period were compared during the planning, design, and construction process of civil engineering facilities. There is a possibility of input errors in project performance data, this paper proposes to the post-evaluation center should perform post-evaluation. Also, post-evaluation implementation guidelines for change orders should be revised. Additionally, further analysis of each facility was proposed through continuous data collection.

Study on Perceptions through Big data Analysis on Gambling related News in Korea (한국 사행산업 관련 뉴스의 빅데이터 분석을 통한 인식 연구)

  • Moon, HyeJung;Kim, SungKyung
    • Journal of Broadcast Engineering
    • /
    • v.22 no.4
    • /
    • pp.438-447
    • /
    • 2017
  • The purpose of this study is to understand the recognition of gambling industry through the semantic analysis of news data on lottery, sports betting, horse racing and casino that was reported between 1990 to 2015 in South Korea. This paper revealed the difference between journalists' intention and public's perception about news by analyzing the frequency and connectivity of news with framing and public's interest through semantic network analysis and explored the policy characteristics and innovation task. The result of analysis, news on lottery game mainly has been reported social issue related with win such as 'winning number', 'prize money', 'suspicion of manipulation' and etc. News on sports betting has been reported mandatory information related with business project and illegal site such as 'bidding', 'illegal site', 'sales target' and etc. News about horse racing has been reported the information about the business advertisement such as 'online race track' and 'promotion'. Lastly, casino related news has been reported 'major information' such as illegality', 'gambling place' and 'foreigner'. As a result of times series analysis, news about casino in the 1990s, news about lottery in the 2000s and news about horse racing in 2010s have been increased. Public's interest also has been moved to 'business scandal', 'winning game', 'citizens' campaign' and etc. Gambling related news has been classified by four types, 1. advertising publicity(horse racing), 2. mandatory information(sports betting), 3. social issue(public agenda, lottery), 4. major information(casino). We could get the insight that news can be formed a public agenda, when news is reported as a social issue with high frequency and public's interest like lottery related news.

A Study on Public Policy through Semantic Network Analysis of Public Data related News in Korea (국내 공공데이터 관련 뉴스 의미망 분석을 통한 공공정책 연구)

  • Moon, HyeJung;Lee, Kyungseo
    • Journal of Broadcast Engineering
    • /
    • v.23 no.4
    • /
    • pp.536-548
    • /
    • 2018
  • Public data has been transformed from provider-oriented information disclosure to a form of personalized information sharing centered on individual citizens since government 3.0. As a result, the government is implementing policies and projects to maximize the value of public data and increase reuse. This study analyzes the issues related to public data in the news and seeks the status of government agencies and government projects by issue. We conducted semantic analysis on domestic online news and public agency bidding information including public data and conducted the work of linking major key words derived with social and economic values inherent in public data. As a result, major issues related to public data were divided into broader access to public data, growth of new technology, cooperation and conflict among stakeholders, and utilization of the private sector, which were closely related to transparency, efficiency, participation, and innovation mechanisms. Also major agencies of four issues include the Ministry of Strategy and Finance and Seoul, Ministry of Culture, Sports and Tourism and Gyeonggi-do, Ministry of Trade, Industry and Energy and Incheon, and Ministry of Land, Infrastructure and Transport and Gyeongsangbuk-do. Most of the issues are being led by the government.

A Study on the Policies to improve the Escalating Regulations of Construction Price - With a Focus on Results of a Delphi Survey - (물가 변동에 따른 건설공사비 조정 제도의 개선 방안 - 델파이(Delphi) 설문 조사 결과를 중심으로 -)

  • Choi Min-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.203-211
    • /
    • 2004
  • This study is the results to survey on the problems and improvable Policies for current escalation system in construction contracts, through a Delphi survey to experts. From the survey results, it is desirable to decide the fluctuation rate of construction cost, which is the requirement of escalation clause, on the basis of inflation rate or construction cost index. The desirable price fluctuation rate is proposed as a $3\%$ level. However, it is difficult for construction companies to cope with the sudden increase of material price in advance, arising from short-term shock factors such as exchange rate and international raw material's price. Accordingly escalation system for specified materials, as an exceptional mode, should be introduced. As a method to calculate the fluctuation rate, ARCA(adjustment rate for the categories of articles) is more desirable than ARI(adjustment rate for an index), because the ARCA can be more reflected the characteristics of each construction work.To rationalize the ARI method, it is needed to announce the wage index, material index and machinery expense index via detailed classification by construction types. Also, it is desirable to prescribe the bidding date as a starting date of the price change, rather than contact signing date. considering the price change can happen since the biddiilg stage.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).