• Title/Summary/Keyword: 일괄입찰

Search Result 51, Processing Time 0.031 seconds

Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts (턴키.대안입찰 설계심의 및 평가제도의 개선방안)

  • Park, Hong-Tae;Lee, Yang-Kyoo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.31-38
    • /
    • 2011
  • Turnkey and alternative-design contracts was introduced operation in the country from january 2004 to February 2010. this was introduced operation. The selecting method of contractor for turnkey projects has being operated by an open forum type that consists of technical committee and appraisal committee in an integrated design approach deliberations. But to improve the operation of the problems, the government is operating design review committee consisting of the central, local and special design advisory committee in march 2010. But this system has also been suggested as still problems, too many contracts by large companies, increasing of design cost and excessive competition. This study is intended to contribute that turnkey and alternative-design contracts can be well operated in domestic construction markets. In this paper suggests some improvement methods and operational problems caused from application of an open forum type for selecting contractor of turnkey project.

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

A Case Study on Construction Management in Nuritkum Square Project (누리꿈스퀘어 프로젝트의 건설사업관리 사례)

  • Lim, Hyun-Yong;Yoo, Seung-Kon;Seo, Joon-Oh
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.25-31
    • /
    • 2007
  • Nuritkum Square Project is a IT Complex which is being constructed in Digital Media City. The project consists of several buildings and is a Design-build, so that the systematic construction management from design to construction stage is more important for a successful project. This study introduces the practical tasks of construction management during the project and analyze some of main tasks to increase understanding construction management in the design-build project. Based on experience of construction management in this project, we examine managerial problems which frequently occur in this kind of project, and suggest how to improve construction management in Korea.

  • PDF

Design and Implement of Multi-agent System for Internet Auction (인터넷 경매를 위한 멀티 에이전트 시스템의 설계 및 구현)

  • 김은영;김태석;김광휘
    • Journal of the Korea Computer Industry Society
    • /
    • v.2 no.3
    • /
    • pp.321-328
    • /
    • 2001
  • Existing internet auction systems have adopted the form which gives a win to the auction bidder who proposes the top bid price for the goods posted on the auction board. But they haven't been satisfying the automatical one-step processing for user’s convenience because they must require continuous care of user for bidding and checking as well as neglecting the convenience of user interface while participating in the electronic bidding system. The agent push mail to a auctioneer information that able to get how much profit as calculate duration time and start price with bidding history stored database. So, this thesis propose a multi-agent system in internet auction that generate the highest margin for auctioneer’s goods.

  • PDF

Linked operation between energy management system(EMS) and market operation system(MOS, CBP) (계통운영시스템(EMS)과 시장운영시스템(MOS,CBP)간 연계운영)

  • Park, Bong-Yong;Kim, Myung-Woong;Ahn, Jae-Seung;Kim, Min-Bae
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.547_548
    • /
    • 2009
  • 전력거래소에서 전력계통 및 전력시장 운영을 위해 도입한 핵심시스템은 EMS, MOS, CBP 이다. 이 세개 시스템은 각각 고유의 기능을 가진 별도의 시스템으로 구축되었다. 우리나라의 전력시장이 발전경쟁단계에 머무르면서 당초 양방향전력시장용으로 도입된 MOS시스템이 활용되지 못함에 따라 MOS시스템의 실시간 급전기능을 활용해 전력계통 운영의 안정성 및 경제성 향상을 꾀하고자 이 세 개의 시스템을 2006년 10월부터 연계 운영하고 있다. 이를 위해 CBP입찰값을 MOS의 입찰형식으로 변환하기위한 CBP-MOS 입찰변환시스템, 실시간 수요예측을 위한 수요예측 프로그램, MOS와 EMS를 일괄적으로 연계하기 위한 연계Mode, 각 발전기 운전원들에게 발전기의 급전계획값 및 실시간 운전현황을 전송하기 위한 급전지시시스템(MX) 및 전반적인 시스템 연계운영을 종합적으로 감시하기 위한 종합감시시스템 등을 개발하여 운영하고 있다.

  • PDF

재건축, 신속한 사업 추진과 공급확대가 새로운 대안

  • Korea Housing Association
    • 주택과사람들
    • /
    • s.191
    • /
    • pp.108-109
    • /
    • 2006
  • 한국건설산업연구원은 8 · 31 대책 이후 주택 시장의 불안정은 주택 수급 불균형 때문이라며 재건축사업을 활성화해야 한다고 진단했다. 도심지 내 주택 공급 문제의 근본적인 해소를 위해서는 각종 규제로 인해 교착 상태에 빠져 있는 재건축 사업을 활용해야 하며 이를 위해 경쟁입찰을 통해 선정된 사업시행자가 '일괄 매수 후 개발 및 분양하는 방식'을 새롭게 도입할 필요가 있다는 주장이 제기됐다.

  • PDF

An Example of Ordering a Bid of Design and Construction as One Package - A new construction of graduate students' dormitory and foreigner.researchers' house of Seoul National University - (설계.시공(設計.施工) 일괄(一括) 입찰(入札)(턴키방식(方式)) 발주(發注) 사례(事例) - 서울대학교(大學校) 대학원기숙사(大學院寄宿舍) 및 외국인.연구원숙소(外國人.硏究員宿所) 신축(新築) 공사(工事) -)

  • Chung, Jae-Sung;Choi, Jung-Hee
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.7 no.4
    • /
    • pp.66-71
    • /
    • 2000
  • PDF

현상설계경기 - 종합무역정보연구센터

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.8 s.316
    • /
    • pp.120-121
    • /
    • 1995
  • 대한무역진흥공사(KOTRA)에서는 21세기 국제화, 정보화, 개방화 시대에 부응하기 위해 종합무역 정보연구센터 건립을 추진, 민간업체의 신공법 및 기술개발과 다양한 기술도입을 통한 쾌적한 환경조성의 효과를 기대한 설계시공일괄 입찰(Turn-key) 방식으로 설계경기를 시행, 총 9개 업체가 참가한 결과 지난 4월 21일 무영건축/형진건설 안을 당선작으로 선정, 발표했다.

  • PDF