Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project

설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구

  • 류혁준 (한양대학교 일반대학원 건축환경공학과) ;
  • 박병주 (한양대학교 일반대학원 건축환경공학과) ;
  • 유승규 (한양대학교 일반대학원 건축환경공학과) ;
  • 김주형 (한양대학교 건축공학부) ;
  • 김재준 (한양대학교 건축공학부)
  • Published : 2012.05.18

Abstract

Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

Keywords