• Title/Summary/Keyword: 유지보수공사

Search Result 206, Processing Time 0.127 seconds

Program-level Maintenance Scheduling Support Model for Multiple University Facilities (프로그램레벨 다수 대학시설물 유지보수 일정계획 지원 모델)

  • Chae, Hong-Yun;Cho, Dong-Hyun;Park, Sang-Hun;Bae, Chang-Joon;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.303-312
    • /
    • 2018
  • The university facility is made up of multiple buildings and has many maintenance items. In addition, administrative constraints need to be handled within a limited period. Most maintenance work is small scale and multi-work construction, such as waterproofing, needs to be organized. The facility manager makes annual unit price contract with a maintenance company and carries out the maintenance work. On the other hand, delay and rework is occurring because existing maintenance work performed without scheduling based on the manpower input. This study proposed a scheduling model that can support the facility manager to manage maintenance works of multiple university facilities at the program level. The model consists of three stages in order. In object analysis, details of the maintenance items were analyzed and the quantity is calculated based on the quantity takeoff sheet. In resource analysis, the craftsmen and construction period of detailed works are derived for the effective input of craftsmen. In scheduling, the priority of each work and the optimal manpower input are derived. The optimal schedule is selected according to the goodness of fit. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. The model was found to be an effective tool to support the scheduling of maintenance works for the facility manager.

The Research on the Curve of Maintenance Cost from Newly Constructed Steel Box Girder Bridge (최근 가설된 강상자형 교량의 보수.보강 공사비곡선 추정에 관한 연구)

  • Kim, Young-Woo;Shin, Yung-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.553-556
    • /
    • 2009
  • 최근 우리나라의 건설 분야에서는 생애주기비용(Life Cycle Cost;이하 LCC)/가치공학(Value Engineering; 이하 VE)을 적용한 구조물 설계가 실시되고 있다. 이는, 건설교통부에서 공공건설사업의 효율성을 제고하기 위하여 실시하고 있으며, 대통령령에 따라 "건설기술관리법시행령"을 제정하여 공공사업분 수행 절차와 기준을 법제화 하였으며 이후 시행령 38조 13의 "설계의 경제성등 검토" 실시를 의무화하는 시행지침을 작성하여 수행하고 있다. 이러한, LCC/VE의 검토에서 보수 보강 공사비 산정은 유지보수공사 프로파일링을 통한 보수 보강 시기를 산정(건설교통부, 2003)하여 교량 구성요소별 보수 교체 주기를 산정(건설교통부, 2001)에서 제시한 기간을 적용하여 LCC/VE를 평가하고 있다. 하지만, 이러한 보수 보강 공사비의 적용은 일괄적인 적용이며, 예전 국내의 교량 건설기술이 현재와 같이 발전된 상태에서의 현황이 아니므로 본 연구에서는 현재 고속국도에 완공되어 운용중인 교량 구조물을 시설물의 안전관리에 관한 특별법 시행령(2008)에 따른 "시설물의 안전점검 및 정밀안전진단 지침"에 의한 교량의 초기점검, 정밀점검 및 정밀안전진단 자료를 조사 분석하여 보수 보강 공사비 곡선을 추정하려 한다.

  • PDF

Case study and implications for AI-powered predictive maintenance in the railroad industry (철도산업에서 AI기반 예측 유지보수를 위한 사례 연구 및 시사점)

  • Eun-Kyung Park
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.19 no.4
    • /
    • pp.693-700
    • /
    • 2024
  • This study aims to analyze the concept and application of AI-based predictive maintenance in the railroad industry and draw implications from it. Focusing on the adoption of AI-based maintenance systems by the Korea Railroad Corporation and Seoul Metro, we examined how AI technology can improve the efficiency and safety of railroad operations. We also compared and analyzed the application of AI technology in the European railroad industry through the cases of Deutsche Bahn in Germany and SNCF in France. The study found that AI-powered predictive maintenance contributes to reducing the frequency of breakdowns, reducing maintenance costs, and increasing the reliability of railroad operations.

Structural and Functional Measurements of a Space Truss Frame for Maintenance Works in Tunnels (터널의 유지보수공사 개선을 위한 가설 스페이스 트러스 프레임의 사용성 및 안정성 평가)

  • Lee, Dong Kyu;Kim, Do Hwan;Kim, Jin Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.92-98
    • /
    • 2012
  • This study shows details of a specific space truss frame structure devised to carry out maintenance and repair temporary works in tunnels. The purpose of this study is to verify structural safety and function of the innovative truss structure through an analysis tool, i.e.. ABAQUS, which is a suite of software application for finite element analysis and computer aided engineering. And then optimized size, i.e., thickness and diameter of truss members is evaluated in practice. In this study, construction methods in the temporary works are additionally represented by using the new space truss frame structure.

Evaluation of Maintenance Quantity and Life Cycle Costs of Railway Track Considering Evolution of Rail Fatigue Damage and Ballast Settlement According to Track Quality Level (궤도 품질수준에 따른 레일 피로 손상과 자갈 침하 진전을 고려한 철도 궤도 보수량 및 수명주기비용 평가)

  • Jun-Hyuck Choi;Seung-Yup Jang;Seung-Won You;Do-Yeop Kim;Hyung-Jo Kim
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.4
    • /
    • pp.37-47
    • /
    • 2024
  • This study proposes a track maintenance quantity estimation model that considers evolution of rail fatigue damage and ballast settlement based on actual maintenance data from the Gyeongbu high-speed railway, and revises the existing life cycle cost (LCC) model for railway track. Using this model, maintenance quantities and life cycle costs based on different track quality levels are evaluated and discussed. According to the results, it is confirmed that applying the track maintenance quantity estimation model that accounts for rail fatigue damage and ballast settlement allows us to reasonably estimate maintenance costs close to the actual data. The track quality coefficient significantly influences both rail and ballast maintenance quantities, with ballast maintenance having a greater impact than rail maintenance. Additionally, as train speed increases, both rail and ballast maintenance quantities rise. Moreover, a higher track quality coefficient leads to a steeper increase in maintenance quantities with increasing train speed. Consequently, LCC also exhibits a faster growth rate over time with higher track quality coefficients and faster train speeds, resulting from an increased proportion of maintenance costs.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

A Planning Framework of BIM-based Work-Type Packaging for Educational Facility Maintenance (교육시설 유지관리 BIM 기반 공종 패키지 플래닝 프레임워크)

  • Bae, Chang-Joon;Park, Sang-Hun;Yoon, Sun-Jae;Lee, Mi-Young;Koo, Kyo-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.200-210
    • /
    • 2020
  • The maintenance of educational facilities was assembled in 12 project classifications of the Educational Improvement Program. The priorities were decided by the evaluation scores derived from the condition investigation, and maintenance works were budgeted in the order of priorities. These priorities were a schedule for conducting maintenance and an important criterion for obtaining a construction order. Several restrictions in the condition investigation exist, which derives budgets and conducts maintenance separately based on the priorities. An educational facility manager has a restriction in quantity take-off, which results in an incorrect budget. Discomfort would occur in an educational environment, and a period of infringing safety would increase. This study proposes applying a BIM in the condition investigation and the planning framework for work-type packaging. A BIM supports a budget calculation and derives evaluation scores by linking a repair and an inspection result. The work-type packaging algorithm divides a budget allocation range and derives the result of a grouped work-types applied in an equivalent space and element. As a result of applying cases, it could shorten the duration by approximately 37.4%. Its usability in selecting a grouped work-type was evaluated through an assessment with workers.

Basic Study of the Improvement of Maintenance Process for Efficient Highway Pavement Management (효율적인 고속도로 포장유지관리를 위한 유지관리프로세스 개선방안 기초연구)

  • Park, Jong-Beom;Lee, Yong-Jun;Lee, Min-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.11
    • /
    • pp.6932-6942
    • /
    • 2014
  • The expressway is a key area of road networks for national industry, economics and social development. In addition, the number of lines are increasing continuously. Recently, road management policy have shown a paradigm shift to safe road, low-carbon and green etc. Nevertheless, the road condition has deteriorated dramatically by fatigue cracking, thermal cracking and weather impact. On the other hand, the budgets for highway maintenance have shrunk dramatically. In this study, an effective pavement management and maintenance process was developed to extend the pavement serviceability and pavement life to overcome the rack of budgets.