• Title/Summary/Keyword: 원가기반

Search Result 221, Processing Time 0.024 seconds

A Study on the Livestock Feed Measuring Sensor and Supply Management System Implementation based on the IoT (IoT 기반의 축산사료 측정 장치 및 사료 공급 시스템 구현)

  • An, Wonyoung;Chang, YunHi
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.10 no.5
    • /
    • pp.442-454
    • /
    • 2017
  • As the demand for meat products has steadily increased in Korea, so the livestock industry has full grown. However, the opening of import meat products is taking a toll on the local industry. Cost reduction on livestock feed, which comprises the majority of costs involved in the industry is urgent to gain a competitive edge. As Internet of Things (IoT) technologies are being applied across a multiple of industries, so are the cases of applied Smart Farm technology for efficient production. The following research aims to utilize IoT technologies to measure, in real time, the rate of depletion of feed and remaining amount and to propose an effective automated reorder & delivery system. First, a method of utilization of ultrasonic and temperature/humidity sensors to obtain corresponding data of remaining feed in the Feedbin is proposed. In addition, a method of sending the obtained data via on-the-farm gateway to Supply Chain Management (SCM) servers is proposed. Finally, utilization of the stored data to construct an automated reorder & delivery service system is proposed. It is in the researcher's intention to contribute to and enable the local livestock industry with the application of various IoT services.

Preliminary Scheduling Based on Historical and Experience Data for Airport Project (초기 기획단계의 실적 및 경험자료 기반 공항사업 기준공기 산정체계)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Sungrae;Lee, Ikhaeng;Lee, Changweon;Jeong, Jinhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.26-37
    • /
    • 2017
  • Preliminary scheduling at the initial stage of planning phase is usually performed with limited information and details. Therefore, the reliability and accuracy of preliminary scheduling is affected by personal experiences and skills of the schedule planners, and it requires enormous managerial effort (or workload). Reusing of historical data of the similar projects is important for efficient preliminary scheduling. However, understanding the structure of historical data and applying them to a new project requires a great deal of experience and knowledge. In this context, this paper propose a framework and methodology for automated preliminary schedule generation based on historical database. The proposed methodology and framework enables to automatically generate CPM schedules for airport projects in the early planning stage in order to enhance the reliability and to reduce the workload by using structured knowledge and experience.

A feasibility study for introducing electric vehicle taxis based on the life-cycle cost analysis (생애주기 분석을 통한 전기택시 도입에 대한 사업성 분석 연구)

  • Han, Daehee;Ahn, Yongjun;Yeo, Hwasoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.14 no.2
    • /
    • pp.54-68
    • /
    • 2015
  • The advantage of electric taxies is that people who are not familiar with electric vehicle(EV) can have easily experience to ride EV. So, EV taxi would be a reasonable strategy for triggering EV market expansion. However, the EV taxi can be adopted by taxi companies with financial benefits. Therefore the feasibility study should be required by analyzing the cost with the points of view of the taxi company. In this study we suggested the methodology for feasibility study of the EV taxi based on the real taxi data and presented political implication. According to the study result, EV taxies could have economic value under the specific conditions such that the government subsidy is added to the purchase price of the vehicle. Also, the charging time should be used as drivers' rest time or mealtime in order not to consider the loss cost. We suggest that the new feasibility study which compares an EV taxi with other alternative vehicles such as PHEV or with an old EV taxi is needed as the future works.

Information System for Managing Cost Reimbursable Construction Projects (실비정산 비용지불 방식에 적용 가능한 건설 프로젝트 정보관리 시스템)

  • Kang, Namhee;Song, Hojeong;Kim, Hyunjung;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.2
    • /
    • pp.237-247
    • /
    • 2015
  • The project management information system (PMIS) has recently been developed by using the information technology(IT) in order to implement advanced information management technology to construction industry in Korea. The PMIS has been applied not only to domestic construction projects, but also to some overseas projects executed by Korean construction companies. This study was performed to develop the PMIS that is tailored to the US construction IT market. It has been monopolized by the US-based IT companies, but other companies are recently emerging with competitive technology and market strategy. As a preceding study, existing commercially available systems were analyzed, and the required features of the PMIS were identified by analyzing the core elements of contract, process and cost management about construction projects in the US. Then, the PMIS was developed based on the aforementioned analysis results. The system includes the document management module with an internal electronic approval system, the cost-plus-based automatic labor cost calculation module, and the progress management module to support the integrated project cost management. In addition, the functionality of the developed system was verified by experts about construction management in the US via questionnaire survey. The developed PMIS, in this study, is expected to be applied not only to the US construction IT market as a system specialized for the US construction industry, but also to other oversea markets in the future.

A Construction safety management system based on Building Information Modeling and Real-time Locating System (위치추적기술을 이용한 BIM기반 건설현장 안전관리 시스템)

  • Lee, Hyun-Soo;Lee, Kwang-Pyo;Park, Moon-Seo;Kim, Hyun-Soo;Lee, Sa-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.135-145
    • /
    • 2009
  • The main goal of construction projects from the past has been enhancing efficiency by reducing cost and time. but, seeing the current condition of safety management of many construction companies nowadays, it is true that not much attention has been paid to safety management for a long time. However, there are paradigm shift from the cost and term of works to safety management in the construction industry, from this circumstance the safety management is evaluated more importantly. Though less accident happens compared to past, the accidents are getting greater because construction projects nowadays are bigger and more complex and monetary loss from the accidents are increasing. Also, the severity is getting greater and even fatal. For this reason, more improved safety management is very necessary. Therefore, we are to propose more efficient system for safety management in this thesis. Technical parts for developing system include many technique such as Real Time Locating system, and other techniques like Monitoring module based on BIM, Data Mart, Alarm are also applied together. Through this system, in the construction site, safety management is performed more effectively and widely because the system can manage the human resource and fluid situation. Also, safety manager can conduct more systematically and advanced safety management through human resource dominated safety management.

A Study on the Activation of Green Remodeling to Achieve Carbon Neutrality - Focusing on a case of Gwangmyeong City - (탄소중립 목표 달성을 위한 그린리모델링 활성화 방안에 관한 연구 - 광명시 사례를 중심으로 -)

  • Kim, Gi-Ran;Lee, Ju-hyun;Kim, Kyong Ju;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.12-21
    • /
    • 2023
  • Green remodeling proposed in the Korean New Deal is a project to build or remodel eco-friendly and energy-efficient buildings using renewable energy facilities and high-performance insulation for public buildings. The government intends to achieve the carbon emission reduction target by conducting green remodeling. Major overseas cities that conduct green remodeling are actively promoting technology support and promotion along with energy performance evaluation according to building characteristics, subsidies for private revitalization, and tax benefits. With this background, the analysis of the current status and problems of the green remodeling project was performed and the Activation factors of Green Remodeling were derived from survey results. This study suggested strategic measures such as a participation of civil society, promotion, and priority selection of administration and policy measures such as a leading role of the public sector, expanding support for the socially underprivileged, and financial support and tax benefits. And this study results are expected to be utilized as basic data to promote the green remodeling project.

A Study on Evaluability Assessment of the Performance Evaluation for Public Organization Focusing on Case of KEPCO (공공기관 경영평가의 평가성 검토: 한전 사례를 중심으로)

  • Yoonseuk Woo
    • Knowledge Management Research
    • /
    • v.24 no.3
    • /
    • pp.17-34
    • /
    • 2023
  • Recently, national concern for record breaking level of deficit operation of KEPCO grows bigger in Korea. With this regard, many stakeholders believe KEPCO should be responsible for this result although it is not clear whether KEPCO is only to blame who is in such position where full cost pricing is impossible and entrepreneurial efficiency is not guaranteed. Particularly, less concern is given to Performance Evaluation for Public Organization(PEPO) which did not give prior warning against major deficit of KEPCO or help to improve its capacity to deal with the problem, and thus prevented KEPCO from acknowledging its managerial weakness by crediting KEPCO with successive grade B during the period of previous government. Based on such viewpoint, this study analyzes reports of PEPO for 5 years in terms of evaluability assessment and suggests proper direction for better PEPO in the future. From this analysis, it was found that firstly, relevant suggestion was not made to prevent or improve defict problem; secondly, comments are increasing every year without consistency; thirdly, comments related to long-term investment are only recently found; fourthly, suggestions are based on political orientation rather than evidence or expertise. This study is expected to contribute to evidence-based evaluation and knowledge management since it tackles evaluation reports themselves for the first time.

A Study on the Decision Factors for AI-based SaMD Adoption Using Delphi Surveys and AHP Analysis (델파이 조사와 AHP 분석을 활용한 인공지능 기반 SaMD 도입 의사결정 요인에 관한 연구)

  • Byung-Oh Woo;Jay In Oh
    • The Journal of Bigdata
    • /
    • v.8 no.1
    • /
    • pp.111-129
    • /
    • 2023
  • With the diffusion of digital innovation, the adoption of innovative medical technologies based on artificial intelligence is increasing in the medical field. This is driving the launch and adoption of AI-based SaMD(Software as a Medical Device), but there is a lack of research on the factors that influence the adoption of SaMD by medical institutions. The purpose of this study is to identify key factors that influence medical institutions' decisions to adopt AI-based SaMDs, and to analyze the weights and priorities of these factors. For this purpose, we conducted Delphi surveys based on the results of literature studies on technology acceptance models in healthcare industry, medical AI and SaMD, and developed a research model by combining HOTE(Human, Organization, Technology and Environment) framework and HABIO(Holistic Approach {Business, Information, Organizational}) framework. Based on the research model with 5 main criteria and 22 sub-criteria, we conducted an AHP(Analytical Hierarchy Process) analysis among the experts from domestic medical institutions and SaMD providers to empirically analyze SaMD adoption factors. The results of this study showed that the priority of the main criteria for determining the adoption of AI-based SaMD was in the order of technical factors, economic factors, human factors, organizational factors, and environmental factors. The priority of sub-criteria was in the order of reliability, cost reduction, medical staff's acceptance, safety, top management's support, security, and licensing & regulatory levels. Specifically, technical factors such as reliability, safety, and security were found to be the most important factors for SaMD adoption. In addition, the comparisons and analyses of the weights and priorities of each group showed that the weights and priorities of SaMD adoption factors varied by type of institution, type of medical institution, and type of job in the medical institution.

Development of Economic Analysis Indicators and Case Scenario Analysis for Decision-making support for Off-Site Construction Utilization of Apartment Houses (OSC 활용 의사결정 지원을 위한 경제성 분석 지표 개발 및 사례 시나리오 분석 - 공동주택 PC공법을 중심으로 -)

  • Yun, Won-Gun;Bae, Byung-Yun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.24-35
    • /
    • 2023
  • Recently, the Ministry of Land, Infrastructure and Transport presented the '6th Construction Technology Promotion Basic Plan' and 'Smart Construction Revitalization Plan (2022.7.20)'. Off-Site Construction (OSC), which involves construction and production of PC (Precast Concrete) and Modular, etc., has advantages in shortening the construction period, reducing costs, improving quality, reducing construction waste, and reducing safety accidents. However, the construction cost is high compared to the traditional RC construction method, which has hindered its utilization and spread. In this study, OSC utilization was improved. An economic analysis indicator and methodology that can support decision-making in the planning and design stages for multi-unit housing were proposed. The factors used in the economic analysis of OSC (based on the PC method) of apartment houses were reviewed. As for the indicators used in the cost and benefit section, 'Construction Period', 'Disaster Occurrence', 'Waste Generation', and 'Greenhouse gas Emission', which reflect the technical advantages of OSC, were derived. In addition, a scenario analysis was conducted based on actual apartment housing case data for the presented economic analysis indicators and benefit calculation standards. The level of benefit that offsets the difference between the existing RC construction method and the construction cost was reviewed. In future studies, it will be necessary to conduct additional case studies to apply the measurement criteria for detailed indicators and supplement the benefit indicators.

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.