• Title/Summary/Keyword: 양중 모델

Search Result 34, Processing Time 0.025 seconds

Study on Optimization for Construction Vertical Lifting with Transfer Operation for Super High-rise Buildings (초고층 건축공사의 리프트 수직 환승운영 최적화 방안 연구)

  • Moon, Jooyong;Park, Moonseo;Lee, Hyunsoo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.53-62
    • /
    • 2014
  • Recently, the number of super high-rise building projects have been increased after recovering from international financial crisis. In super high-rise building project, vertical lifting is critical to overall project productivity, due to its limited lifting equipments. Also for projects which buildings' height are higher than 400m, transfer operation in lifting is inevitable because of lifts' maximum lifting height. In transfer operation, setting a transfer floor is essential for saving lifting time of resources. In this research, using discrete event simulation modeling with AnyLogic 7.0 software and metaheuristic optimization with OptQuest software, the method of optimizing a transfer floor for workers during the morning peak time is proposed. Comparing to the result of the case which transfer floor is designated to the middle floor, setting optimized transfer floor significantly decrease the total lifting time of workers. By using proposed simulation and optimization tool, saving budget and time through increasing available working hour is expected.

The Development of Simulation Model for Calculating Hoisting Time of Double-Cage Construction Lift in Supertall Building Construction (Double-Cage 건설용 리프트의 양중시간 산정을 위한 시뮬레이션 모델 개발)

  • Kim, Wansoub;Lee, Dongmin;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.64-65
    • /
    • 2016
  • According to the recent increase in the height of supertall buildings, construction lift became one of most important equipment for vertical transportation of resources. However, increase in lifting load during peak time in which the resources are concentrated often causes a risk of construction delay. This study suggests a concept of Double-Cage construction lift, which is a lift with two cages attached together allowing transportation of resources on two consecutive work floors simultaneously. The aim of this study is to present a simulation model suitable for calculating hoisting time of Double-Cage construction lift. The proposed model is expected to be utilized when applying Double-cage construction lift for its efficient operation and management.

  • PDF

Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction (초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델)

  • Nam, Chulu;Kwon, Jaebeom;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building (센싱정보를 활용한 초고층 건설용 리프트 최적화 운행 시스템 개발)

  • Shin, Joong-Hwan;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.153-163
    • /
    • 2013
  • As recent buildings have been more higher and larger, construction vertical lifting planning and operation is a key factor for successful project in tall building. Although many studies have been trying to set up a construction lifting planning system at early stage, there's not existing a control real-time lift operation control system with respect to during construction stage. Therefore, In this study, we use the sensor device to collect the lift operating data for improvement of lift operation efficiency and develope optimum lift operating system which can perform real-time analysis. Finally, we verify the efficiency of proposed system through comparison between realtime operating data and simulated data using proposing system. In this paper, the proposed system show more efficient moving line compared with previous system. This can contribute to development of unmanned lift system.

DSON Architecture and Service Model for End-to-End QoS Guarantee in Next Generation Home Network (차세대 홈 네트워크 환경에서의 end-to-end QoS 보장을 위한 DSON 구조와 서비스 모델)

  • Kim, Do-Won;Kim, Eung-Kyu;Kim, Yang-Jung;Chong, Il-Young
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2009.08a
    • /
    • pp.333-336
    • /
    • 2009
  • DSON is a service overlay network architecture that can guarantee end-to-end quality of service to home network area. DSON makes service possible to be provided dynamically. This paper gives service model and scenario using DSON architecture.

  • PDF

Analysis Model of Write Amplification Factor on Flash Memory (플래시 메모리에서 쓰기 증폭 인자 분석 모델)

  • Lee, Sang-Yup;Kim, Se-Woog;Jeon, Jeong-Ho;Choi, Jong-Moo;Yang, Joong-Seob;Mo, Yeon-Jin;Shin, Young-Kyun
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2011.06a
    • /
    • pp.551-554
    • /
    • 2011
  • 덮어쓰기 제약(overwirte limitation)과 삭제 횟수 제한(limitted erase cycle)이 있는 플래시 메모리의 특징이 의하여, 플래시 메모시는 시스템에서 요청한 쓰기 요청보다 많은 수의 쓰기 연산을 수행하게 되는데, 시스템에서 요청한 쓰기요청과 실제 쓰기 연산 간의 비율을 쓰기 증폭 인자(Write Amplification Factor, 이후 WAF)라 한다. WAF는 성능과 신뢰성에 중요한 요소로 본 논문에서는 WAF를 예측 할 수 있는 분석모델을 제안한다. 제안된 모델은 페이지 사상 FTL, 블록 사상 FTL, 혼합 사상 FTL 등 다양한 FTL에서 WAF를 예측 할 수 있으며, 예측에 사용되는 매개 변수로 이용율(utilization), 무작위율(randomness), 연관도(Associativity)만을 사용하여 단순하다는 특성이 있다. 본 논문은 실제 Linux 환경에서 측정한 WAF와 비교 분석 결과 제안된 모델이 WAF를 정확히 예측 할 수 있음을 발견하였다.

A Productivity Analysis of Tower Crane Installation Progress Based on Simulation Technique (시뮬레이션 기반의 타워크레인 설치 생산성 분석)

  • Kim, Yun-Sik;Cho, Jae-Kyong;Kim, Min-Ji;Cho, Kyu-Man;Hyun, Chang-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.33-40
    • /
    • 2010
  • Recently, the scale of construction work has been growing, and buildings are becoming higher. To enable greater efficiency of construction work, the use of vertical transportation equipment has been radically increasing. In this context, many studies have been conducted on tower cranes. While these studies have discussed issues such as the selection of tower cranes, the optimization of locations, and the hoisting time of tower cranes, there has been no research on the installation of tower cranes. As such, the installation of tower cranes on construction sites has been accomplished based on subjective judgment and technical assistance, and the experience of workers in equipment companies. Therefore, this study analyzes the productivity of tower cranes using simulation methodology, and proposes a generalized model of the installation process of tower cranes in order to offer a basic resource that site managers can directly utilize.

BcN/NGN 구조 및 표준화 동향

  • Kim, Yang-Jung;Lee, Dong-Gyu;Jeong, Il-Yeong
    • Information and Communications Magazine
    • /
    • v.24 no.3
    • /
    • pp.5-14
    • /
    • 2007
  • NGN (Next Generation Network)은 현재 IP기반의 네트워크 기능을 효과적으로 수용하면서 기존의 IP 및 전기통신 서비스뿐만 아니라 앞으로 예상되는 IP 기반 서비스를 효율적으로 제공하기 위한 표준 네트워크 프레임워크라고 여겨진다. 이를 표준화하기 위하여 ITU-T SG13 및 NGN-GSI (NGN-Global Standards Initiative)에서 ITU-T의 관련 연구 그룹들이 참여하여 요구되는 네트워크 및 서비스의 표준화를 매우 적극적으로 추진하고 있다. 우리나라의 BcN도 ITU-T의 NGN 표준화 결과 및 국내 상황을 고려하여 표준모델을 설정하고, 이를 기반으로 IP 기반의 광대 역 고품질 네트워크 프레임워크 틀을 만들어 가고 있다. 본고는 이러한 국내외 상황을 고려한 BcN/NGN 표준화 동향 및 ITU-T NGN의 프레임워크 및 구조, NGN의 서비스 기능 구조, NGN의 자원 관리 및 제어, 유무선 통합 (Fixed Mobile Convergence) 및 NGN Security 구조 등의 표준화 동향에 대하여 기술한다.

A Location Model for Tower Cranes of High-Rised Building Construction (고층건물 타워크레인 위치선정 모델)

  • Park Jung-Hyun;Lee Hyun-Shic;Hyun Chang-Taek;Koo Kuo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.614-617
    • /
    • 2003
  • Recently the demand of constructing high-rised building grows larger. So it becomes more important to make an exact plan of a tower cranes which has an important position in high-rised building construction. Nevertheless businessmen of construction sites only depend on a great store of experience without a clear process of locating tower cranes. The object of this study is to set up the process model for locating tower cranes. The study went off through a study of related documents, an interview with some experts and a visiting of job sites. In result the study suggests a process model which has four steps of considering an establishing, disjointing, a radius of working, easy working. Case study was examined to estimate the feasibility and applicability of the proposed model. As a result, the model is proven to be a method to locate tower cranes quickly and cleary, and to operate properly as a decision-making tool.

  • PDF