• Title/Summary/Keyword: 시공 단계

Search Result 1,343, Processing Time 0.027 seconds

Calculation of Basic Unit of Carbon Emissions in Construction Stage of the Road Infrastructure (도로시설물의 전과정 탄소배출량 산정을 위한 시공단계 탄소배출원단위 구축)

  • Kwak, In-Ho;Kim, Kun-Ho;Cho, Woo-Hyoung;Park, Kwang-Ho;Hwang, Young-Woo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.37 no.2
    • /
    • pp.107-112
    • /
    • 2015
  • Carbon emissions in construction stage is very high because lots of construction machines and materials are required to be used at a road construction stage. Many researcher carried out application of carbon emissions estimation methodology during the life cycle of road infrastructure in order to reduce greenhouse gas emissions in the road sector. But the calculation of carbon emissions is difficult because data collection is difficult and calculation procedure is complex. In this study, a basic unit of carbon emissions in construction stage of the road infrastructure was developed in order to get the quantitative determination of carbon that occurs. Carbon emissions of the expressway and common state road was calculated by using the basic unit of carbon emissions and application plan of basic unit of carbon emissions are presented.

Decision Making Process for Alternative Selection of Proper Design Change in Construction Project (적정 설계변경안 선정을 위한 의시결정 지원 프로세스)

  • Lee, Jong-Sik;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.74-82
    • /
    • 2010
  • A government agency has been announced to increase 23,663 hundred million wons by cost of design change which occurred in the pre-construction and construction phase. As design change is a phenomenon to occur by means of a characteristic of the building design that standardization is difficult, even if it is said that a perfect design is done in design phase, design change is prevented, and it is going to decrease, and there is a limit. Because there are some causes in all of the construction project, it is change order of client, relative system, unfit design and field condition, etc. In this study, we are suggested logic and basic model of the decision making support process model that it should selecting the optimal alternative through complex and quantitative analyzed: that is cost, performance and constructability as respect Owner or CMr is executing project under the CM delivery system construction project which it occurred design change.

The Improvement of Work Structure in the Private Investment SOC Project (민자 SOC사업의 시공단계 업무체계 개선방향)

  • Kim Daejin;Shin Seungtae;Lee Younghwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.486-489
    • /
    • 2004
  • To enlarge the international competition and construction productivity, the domestic construction market attracts the private capital and expands the facility of :iocial Overhead Capital(SOC). However, the application of the business system used at the public project didn't utilize the effect of social overhead capital. It caused problems that parties' business was inefficient and their allotment of the risk was inadequate. This paper presents the course to reorganize the business system which the coincides with the origin aim of the SOC. For the reformation of the supervisor's work scope and business system and the government's overall project management, in other words, this paper proposes the professional organization to replace the superintendence and the formation of optimal business system. This paper confirms the privity of contract among parties of SOC project and parties' work scope and system between relative laws and concession agreement that government made a contract with Special purpose Company (SPC).

  • PDF

A Study on the Displacement Prediction Method using the Inverse Analysis Algorithm (역해석 알고리즘을 이용한 변위예측 기법에 관한 연구)

  • Park, Hyun-Jung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.4
    • /
    • pp.920-926
    • /
    • 2014
  • In this study, we applieorithmd the inverse analysis alg to the prediction of displacement shape in the example construction and verified the feasibility of suggested algorithm. For this purpose, as information processing knowledge in the field of IT is required and the need for convergence with the major is emerged, it is intended to try to apply the algorithm to the construction sector. Prediction of displacement shape is very important since it is related to the earth pressure of slurry wall and effecting on the safety of slurry wall after anchor removal. 3 levels of inverse analysis were applied to the slurry walls in 3 sites and compared the measured displacement shape with predicted displacement shape of the last excavation construction. As the predicted displacement shape was matched well with the measured one, the applied analysis algorithm in this study can be applied to the excavation construction.

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.

A Technical Report on the Design and Construction of Hybrid Tension Roof Structure of Incheon Munhak Stadium (인천문학경기장 지붕구조의 설계와 시공)

  • Seok Hwangbo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.194-201
    • /
    • 2003
  • 대공간 구조시스템은 일반적으로 자중을 최소화하고 부재내력의 효과적인 사용이 매우중요하다. 따라서 준공후의 외력에 대한 구조적 거동에 대한 파악도 중요하지만 시공중의 거동에 대한 파악도 매우 중요하다. 특히 케이블 막구조의 경우 시각초기에 구조물이 불안정하지만 케이블에 장력이 도입되면서 점차적으로 구조물의 강성이 높아져 구조물이 안정화를 이루게 피므로 시공과정 해석 즉 안정화 이행과정해석이 시공계획을 설정하는 부분에서 매우 중요한 요소가 된다. 본고에서는 케이블 막구조의 실례로써 최근 완공된 인천문학 경기장 지붕구조를 대상으로 시공과정과 안정화 이행과정해석에 대한 소개를 한다. 인천문학경기장 지붕구조는 케이블에 장력을 도입하는 과정에서 발생되는 변형과 내력을 흡수하고 하부구조에 대한 영향을 최소화하기 위하여 마스크 지점의 회전과 이동이 가능한 특수공법을 채택하였으며 시공과정해석(안정화이행과정해석)을 통하여 제시된 단계별 목표장력 및 변위에 따라 시공과정이 계획되고 제어되었다. 특히 외국의 기술로 설계된 자료를 근거로 일방적으로 공사를 수행한 다른 구조물과는 다르게 국내의 기술력에 바탕한 구조 해석 등을 통하여 검증하여 최종 시공방법을 결정하였고 이러한 과정을 통하여 대공간 구조에 대한 기술력을 확보하고 확인할 수 있었으며, 그 결과 향후에는 국내의 기술력으로 이와 같은 대규모의 케이블 막구조의 설계와 시공이 가능할 것이라고 판단된다.

  • PDF

Development of Quasi-Conforming Shell Element for the Three Dimensional Construction Stage Analysis of PSC Bridge (PSC 교량의 3차원 시공 중 해석기법을 위한 준적합 쉘 요소 개발)

  • Kim, Ki-Du;Byun, Yun-Joo;Kim, Hyun-Ky;Lomboy, Gilson R.;Suthasupradit, Songsak;Kim, Young-Hoe
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.20 no.3
    • /
    • pp.329-338
    • /
    • 2007
  • The PSC box bridge constructed of concrete, reinforcing bar and tendon is a complex structure that exhibits tension cracks, nonlinear behaviour of steel and time dependent behaviour of concrete. The frame element is commonly used for construction stage analysis PSC bridges. However, the frame element does not show sufficient information when in the curved PSC box bridges. For the case of curved PSC bridges, the deformations in the inner and outer web are different. In this case, different jacking forces are required in the inner and outer webs. However, it is impossible to calculate different jacking forces if we use the frame element for construction stage analysis. In order to overcome this problem, the use of the shell element is essential for a three-dimensional construction stage analysis of PSC bridges. In the following, the formulation of a Quasi-conforming shell element and its application of PSC box girder bridge analysis are presented.