Usability Improvement of BIM for Construction Projects Using Active BIM Functions  

Kang, Leen-Seok (경상대학교 토목공학과, 공학연구원)
Moon, Hyun-Seok (한국건설기술연구원 ICT융합연구실)
Kim, Hyeon-Seung (경상대학교 대학원)
Kwak, Joong-Min ((주)플랜피아피엠씨)
Publication Information
Korean Journal of Construction Engineering and Management / v.14, no.5, 2013 , pp. 74-83 More about this Journal
Abstract
Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.
Keywords
Active BIM; Passive BIM; 4D CAD System; Genetic Algorithm; Optimized Schedule;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 박찬식.박희택 (2010). "시공성 분석업무 개선을 위한 BIM 기술의 적용방안." 한국건설관리학회 논문집, 제11권 제2호, 한국건설관리학회, pp. 137-146   과학기술학회마을   DOI   ScienceOn
2 Akinci, B., Fischer, M., and Kunz, J. (2002). "Automated Generation of Work Spaces Required by Construction Activities."Journal of Construction Engineering and Management, 128(4), pp. 306-315   DOI   ScienceOn
3 Alan, Russell., Sheryl, Staub-French., Ngoc, Tran., and William, Wong. (2009). "Visualizing high-rise building construction strategies using linear scheduling and 4D CAD."Automation in Construction, 18(2), pp. 219-236   DOI   ScienceOn
4 Ashwin, Mahalingam., Rahul, Kashyap., and Charudatta, Mahajan. (2010). "An evaluation of the applicability of 4D CAD on construction projects." Automation in Construction, 19, pp. 148-159   DOI   ScienceOn
5 Chin, S. Y., Yoon, S. W., Choi, C. H., and Cho, C. Y. (2008)."RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings." Journal of Computing in Civil Engineering, 22(2), pp. 74-89   DOI   ScienceOn
6 Dawood, N., and Mallasi, Z. (2006). "Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies." Computer-Aided Civil and Infrastructure Engineering, 121, pp. 498-513
7 Hartmann, Timo. Gao, Ju., and Fischer. Martin. (2008). "Areas of Application for 3D and 4D Models on Construction Projects." Journal of Construction Engineering & Management, 134(10), pp. 776-785   DOI   ScienceOn
8 Kang, L. S., Moon, H. S., Park, S. Y., Kim, C. H. (2013). "Improved 4D CAD System for Visualizing Construction Work by Using WBS as Interface Code."KSCE Journal of Civil Engineering, 14(6), pp. 803-814
9 Kang, L. S., Moon, H. S., Dawood, N., and Kang, M. S. (2010). "Development of Methodology and Virtual System for Optimized Simulation of Road Design Data."Automation in Construction, 19(8), pp. 1000-1015   DOI   ScienceOn
10 Senouci, A. B., and Eldin, N. N. (2004). "Use of Genetic Algorithms in Resource Scheduling of Construction Projects."Journal of Construction Engineering and Management, 130(6), pp. 869-877   DOI   ScienceOn
11 Tantisevi, K., and Akinci, B. (2007). "Automated generation of workspace requirements of mobile crane operations to support conflict detection." Automation in Construction, Vol.16, No.3, pp. 262-276   DOI   ScienceOn
12 김현승.문현석.최광열.김창학.강인석 (2012). "건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축." 한국건설관리학회 논문집, 제13권 제2호, 한국건설관리학회, pp. 11-24   과학기술학회마을   DOI   ScienceOn