• Title/Summary/Keyword: 세부작업 일정 계획

Search Result 12, Processing Time 0.025 seconds

Development of CPAM(Construction Process Analysis Model) based on Lean Construction Principles (린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구)

  • Kim Chan Hun;Kim Chang Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.48-61
    • /
    • 2001
  • This study aims at improving work reliability. It proposes a way to overcome the limitations of current scheduling methods by providing a new framework, CPAM(Construction Process Analysis Model) based on the lean principles. It suggests methods which improve work reliability and production effectiveness with variability control methods. Also it suggests methods which reduce inventories of materials and equipment and WIP(Work In Process) using two techniques; Lookahead Schedule and Weekly Work Plan. The contribution of this research also includes that it assumes planning as a process of reducing uncertainty and maximizing throughput, counter-posing plan reliability to resource redundancy as alternative strategies for managing in conditions of uncertain work flow.

  • PDF

Reactive Scheduling and Control for Shipbuilding : DAS-REACT (조선의 일정계획 수정 및 통제 : DAS-REACT)

  • 이정승;이재규;최형림
    • Journal of Intelligence and Information Systems
    • /
    • v.2 no.1
    • /
    • pp.59-73
    • /
    • 1996
  • 전체적인 조선 생산일정계획을 수립하기 위해서 계층적 구조를 채택하였다. 이 구조에 의하면 도크의 상위 일정계획 생성기는 탑재 일정계획을 생성하고, 조립공정의 하위 일정계획 생성기는 상위 일정계획 생성기가 요구하는 범위 내에서 각각 세부적인 조립 일정계획을 세우게 된다. 그런데 하위 일정계획 생성기가 아무리 노력하여도 상위 일정계획 생성기로부터의 제약조건을 만족시킬 수 없는 상황이 발생하면, 일정계획 수정기에 통보하여 초기 탑재 일정계획을 수정해야 한다. 하위 일정계획 생성기로부터의 조정요청을 반영하기 위해서 부분 수정을 통해 충격을 최소화시키는 일련의 휴리스틱으로 구성된 알고리즘을 제시하였다. 각각의 휴리스틱은 여유시간 제거, 버퍼 제거, 작업시간 축소, 다단계 여유시간 제거, 과부하 자원 공유블럭 조정, 자원 제약조건 완화 등이고, 흡수되지 않은 일부의 충격은 주변으로 전파된다. 이와같은 방법론을 대우조선의 상황에 적용하여, 조선일정계획 수정 시스템인 DAS-REACT를 개발하였다.

  • PDF

Design of Project Schedule Management Tool Based on Source Code for Checking Software Development Progress (소프트웨어 개발 진척도 확인을 위한 소스코드 기반의 프로젝트 일정 관리 도구 설계)

  • Hwang, Bueng Il;Lee, Sunghee;Lee, Woo Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2016.04a
    • /
    • pp.529-532
    • /
    • 2016
  • IT 융 복합 산업에서 소프트웨어가 차지하는 비중이 높아짐에 따라 프로젝트 관리는 점차 중요해지고 IT기업의 경쟁력을 결정하는 중요 요소가 되고 있다. 프로젝트 관리 중 일정 관리는 가장 기초적이고 관리적 요소가 가장 많이 들어있으며 일정 관리의 실패는 Time-To-Market을 맞추지 못한다. 일정 관리를 위해 고려해야할 문제점들은 겉으로 확인되는 진척율과 실제로 개발된 진척율의 차이, 팀원의 낭비되는 시간을 지속적 관리 등이 있음에도 현장에서는 도구 또는 파일을 통해 진행 사항을 관리하지만 세부 작업별 활동까지 연계가 되지 않아 일정 관리의 진행 상황이 명확히 드러나지 않는다. 따라서 본 논문에서는 소스코드 기반의 실시간 프로젝트 일정 관리 도구를 제안한다. 프로젝트 계획 단계에서 작업을 컴포넌트 별로 세분화되어 있을 때 이 도구를 사용하여 컴포넌트 내부 메서드의 소스코드 작성을 통해 소프트웨어 개발 진척도를 명확하게 파악하고 해당 소스 코드의 테스트를 통해 의도대로 개발이 이루어졌는지를 확인 가능하다. 그리고 피드백을 통해 개발자에게 개발 일정 및 계획 수정에 대한 알림으로 지연되는 시간 없이 수정 가능하다.

Program-level Maintenance Scheduling Support Model for Multiple University Facilities (프로그램레벨 다수 대학시설물 유지보수 일정계획 지원 모델)

  • Chae, Hong-Yun;Cho, Dong-Hyun;Park, Sang-Hun;Bae, Chang-Joon;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.303-312
    • /
    • 2018
  • The university facility is made up of multiple buildings and has many maintenance items. In addition, administrative constraints need to be handled within a limited period. Most maintenance work is small scale and multi-work construction, such as waterproofing, needs to be organized. The facility manager makes annual unit price contract with a maintenance company and carries out the maintenance work. On the other hand, delay and rework is occurring because existing maintenance work performed without scheduling based on the manpower input. This study proposed a scheduling model that can support the facility manager to manage maintenance works of multiple university facilities at the program level. The model consists of three stages in order. In object analysis, details of the maintenance items were analyzed and the quantity is calculated based on the quantity takeoff sheet. In resource analysis, the craftsmen and construction period of detailed works are derived for the effective input of craftsmen. In scheduling, the priority of each work and the optimal manpower input are derived. The optimal schedule is selected according to the goodness of fit. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. The model was found to be an effective tool to support the scheduling of maintenance works for the facility manager.

The Simulation Function Analysis for BIM based construction planning (BIM기반 시공계획의 시뮬레이션 기능 분석 연구)

  • Jun, Ki-Hyun;Kim, Chang-Seob;Yun, Seok-Heon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.95-98
    • /
    • 2011
  • 건설공사 프로젝트는 사전 기획 단계, 설계, 계약, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주체에 의해 프로젝트가 진행되고 각 분야 간의 원활한 의사소통을 통한 협력 작업으로 일을 진행한다. 그러나 각 단계별 참여주체간의 협업이 어렵고 정보교류가 원활하지 못한 문제점들이 있다. 또한 건설공정은 현장여건의 변화와 불확실성으로 인해 예측이 어렵고, 보다 신뢰성이 있는 계획의 부재로 인하여 각종 세부 공정들 간의 간섭을 유발하고 계획된 일정을 준수하기 어려워 불필요한 비용의 낭비와 공사기간의 증가를 야기한다. 이러한 낭비요인을 최소화하고 건축 프로젝트를 진행하는데 있어서 효율성을 높이기 위해서는 시공계획 단계의 신뢰성을 높여야 한다. 따라서 시공전의 계획 단계에서부터 4D 시뮬레이션을 통하여 이러한 문제점들을 파악하고 개선하는 것이 중요하다. 본 연구에서는 BIM기반의 시뮬레이션 프로그램의 기능분석을 통하여 효율적인 적용과 발전과정을 알아보고자 한다.

  • PDF

A Study on the Application of TACT Planning & Scheduling in Finish Work of Apartment Houses (공동주택 마감공사에서의 택트공정관리 적용에 관한 연구)

  • Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-425
    • /
    • 2003
  • The purpose of this study is using a TACT planning and scheduling for apartment houses construction that have many of same units. Because using a TACT planning and scheduling is concluded time reduction at same units as apartment plan. The main contents of this study are 1) window and door work through the field study, 2) adjust worker assignment to minimize work time variation, and 3) an effect of working time through a case study. As a result, the total working time can be improved $21.2\%$ by using the TACT planning and scheduling. The stu요 recommends that 1) establish an accurate data between work period and resource, and 2) preparation to measures minimization of waiting time before using a TACT planning and scheduling.

  • PDF

Design and Implementation of a Project Work Unit-based Scheduling Application (프로젝트 작업 단위 기반 일정 관리 애플리케이션의 설계 및 구현)

  • Bomin Kim;Minyoung Kim
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.6
    • /
    • pp.1173-1178
    • /
    • 2023
  • In modern society, there is a tendency to emphasize efficiency and lead to detailed planning of team projects and individual tasks within organizations. In a 24-hour routine, the ability to use time effectively is considered an indicator of conscientiousness, and people try to imitate planned and organized people and utilize various systems to manage their daily lives. The reason why you want to perform a given task efficiently is because it affects the success or failure of the project by completing the task within a set period of time. Neglecting the project schedule is considered a major risk that threatens a successful outcome. This applies not only to large-scale organizational projects but also to individual life, and utilizes a variety of schedule management tools that emphasize time-based efficient management. In project management, it is necessary to carefully understand the detailed work progress rather than simply based on Today. In this paper, we propose an Android application that can manage schedules by accessing the user's project in units of tasks rather than dates, and introduce its implementation. The application we implemented in this paper can manage the project's goals and schedule by registering the project to which the user belongs. In addition, it provides the ability to approach work efficiently by visualizing the progress of the entire project or individual goals. As a result, users can use the application we propose in this paper to focus on their projects and manage schedules by task, thereby improving the overall efficiency of the project.

Comparative Analysis of Conventional Tact and Compositive Tact in Apartment House Finishing Construction (공동주택 마감공사의 기존 Tact와 복합병행 Tact 비교분석 - 공동주택 미장공사 중심으로 -)

  • Hwang, SuHyeon;Sim, JeaHyung;Ham, NamHyuk;Kim, JaeJun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.47-56
    • /
    • 2022
  • In a construction project, process planning is an important factor in determining the success or failure of a project. In particular, it is necessary to systematically establish a process plan in the early stage because the finishing work of an apartment house involves more interference than the foundation work or the frame work. First, in this study the problems of Tact process management were identified, Based on the data from the case project, conventional Tact process management and compositive Tact process management were compared and analyzed. Second, cost analysis was performed on applicable plastering work to suggest the necessity and direction of compositive Tact process management. Third, the appropriateness of manpower according to the number of construction households is analyzed through cost analysis. Through this, the validity and effectiveness of compositive Tact process management were verified based on the results derived from this study.

Design and implementation of a project management system capable of process management by Activity using PERT/CPM (PERT/CPM을 이용한 Activity에 대한 연결 공정관리가 가능한 프로젝트 관리 시스템의 설계 및 구현)

  • Park, Sun-Yi;Park, Hee-Sook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.5
    • /
    • pp.802-807
    • /
    • 2022
  • In projects where mufti-project management is required and processes for production activities are repeated and linked, it is very difficult to input processes for activity repeatedly or analyze loads by process in a method of managing processes step by step. In this paper, based on the definition of activity and project process, the connection process can be automatically created for activity, schedule and resource management for each process, schedule and resource plan can be established for each detailed process, and load analysis can be provided in real time. It presents a project management system that can significantly improve the time and cost of project progress management, predict various problems that may occur during the project, and effectively allocate the necessary amount of resources in the right place.

Design of Integrated Process-Based Model for Large Assembly Blocks Considering Resource Constraints in Shipbuilding (자원제약을 고려한 조선 대조립 공정의 통합 프로세스 기반 모델 설계)

  • Jeong, Eunsun;Jeong, Dongsu;Seo, Yoonho
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.2
    • /
    • pp.107-117
    • /
    • 2019
  • Because shipbuilding is single-product production with limited resources, production management technology is essential to manage the resources effectively and maximize the productivity of ship-process. Therefore, many shipbuilding companies are conducting research on ship production plan and process considering various constraints in the field by applying modeling and simulation. However, it is difficult to provide accurate production plan on sudden schedule and process changes, and to understand the interconnectivity between the processes that produce blocks in existing research. In addition, there are many differences between the production planning and field planning because detailed processes and quantity of blocks can not be considered. In this research, we propose the integrated process-based modeling method considering process-operation sequences, BOM(Bill of materials) and resource constraints of all the scheduled blocks in the indoor system. Through the integrated process-based model, it is easy for the user to grasp the assembly relationship, workspace and preliminary relationship of assembly process between the blocks in indoor system. Also, it is possible to obtain the overall production plan that maximizes resource efficiency without the separate simulation and resource modeling procedures because resource balancing that considers the amount of resource quantity shared in the indoor system is carried out.