• Title/Summary/Keyword: 성과측정기준선

Search Result 35, Processing Time 0.024 seconds

Methods of Establishing the Optimal Performance Measurement Baseline and Evaluating the Progress for Implementing EVMS (EVMS 적용을 위한 최적 성과측정기준선 설정 및 진도율 산정 방법)

  • Won Dong-Soo;Kim WooYoung;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.395-400
    • /
    • 2001
  • In construction projects, it is very important to evaluate the performance of works in comparison with the cost and schedule plans. So, on the first of July, 2000, the Ministry of Construction and Transportation announced the EVMS will be applied in public sector soon. However there are still many arguments about how to establish the Performance Measurement Baseline(PMB) and how to evaluate the progress with accuracy. And many people confuse the meaning of EVMS with that of cost and schedule management. So, the purpose of this research is to propose the new useful methods to set up the PMB and to assess the exact progress in consideration of cost, schedule, and float time for successful implementation of EVMS.

  • PDF

A study on the Project Performance Measurement Baseline for Clients (발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구)

  • Ko, Dae-Jun;Choi, Eun-A;Park, Dong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.513-516
    • /
    • 2008
  • The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

  • PDF

A Study on NOS Model System for The Construction Work Planing and Management (건설 시공 계획 및 관리 업무의 적용을 위한 NOS 모델 구축 연구)

  • Choi, Jaejin;Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.10-18
    • /
    • 2016
  • This study presented a new NOS model through the following suggestions to apply the construction work planing and management to NOS(Network Operating System). First, This study presented CIMS(construction information classification system) reflected the characteristics of facility classification - functional component classification - functional component classification - work classification - resource classification. Based on this system. this study presented how to establish PMMB(performance measurement management baseline) with proposed master target equation which analyzed the trend of performance measurement management baseline and proposed work target equation which analyzed the execution results. Finally, this study presented NOS model that can be applied to fixed price method and cost plus fee method through the theoretical verification of executive performance analysis method.

A Study on Improvement of Defense R & D Program by PMB (PMB적용을 통한 국방연구개발 사업관리 개선방안 연구)

  • Choi, Seok-Cheol;Bae, Yun-Ho
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.9 no.2 s.25
    • /
    • pp.60-69
    • /
    • 2006
  • The PMB(performance measurement baseline) is the total time-phased budget plan against which program performance is measured. Additionally it is the schedule for expenditure of the resources allocated to accomplish program scope and schedule objectives, and is formed by the budget assigned. In this paper, we suggest an improvement of the R & D(research and development) program for defense acquisition by using the PMB and an application of the IBR(integrated baseline review) to review the PMB for project manager of the defense agency.

A Study on the Evaluation of Curved Track to Speed Up of Railway Vehicle (고속열차 주행시 곡선부의 궤도성능평가)

  • Kang Yun-Suk;Kim Eun;Park Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.948-954
    • /
    • 2004
  • This study deals with the Evaluation of track system, when Newly developed Korea High Speed Train(KHST) by KRRI and KTX trains are running pass curved track of conventional line. In order to evaluate stability of track and vehicle running safety. the effect of curve radius, the field tests were performed at sharply curved track.

  • PDF

A Study oil the Application of EVMS in Defense R&D Programs (국방연구개발 사업에 EVMS 적응방안 연구)

  • Choi Seok-Cheol;Kim Jong-Pil
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.8 no.1 s.20
    • /
    • pp.62-68
    • /
    • 2005
  • In this paper, we review the general technique of Earned Value Management System(EVMS) which is the integrated management for cost, schedule and performance, and suggest an application of the integrated management of cost and schedule in the research and development(R&D) programs for defense acquisition.

Integrated Planning Process Implementation Method Based on the Cost, Schedule, and Technical Performance (비용, 일정 및 기술적 성과를 고려한 통합 계획수립 프로세스 구현 방안)

  • You, Yi-Ju;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.100-108
    • /
    • 2007
  • The purpose of the research is to propose an integrated project planning process and its implementation method. Although there is increasing interest in the application of the Earned Value Management(EVM) method in the project management area, the progress and maturity of the technical performance have not been included in assessing the Earned Value. The main concept of the planning process is to use cost, schedule, as well as the technical performance in the assessment of the Earned Value Management for Military R&D project management practices. The resulting process can enhance the efficiency of the project work by eliminating the currently duplicated activities between traditional project planning process and the newly implemented Earned Value Management process and by shortening the early planning process duration of projects adopting EVM practices.

A Study on the Business Performance of Shipping and Logistics Companies using Data Environment Analysis (DEA를 활용한 해운.물류 기업의 경영성과에 관한 연구)

  • Go, Daekyung;Woo, Suhan;Kang, Hyowon
    • Journal of Korea Port Economic Association
    • /
    • v.30 no.2
    • /
    • pp.93-112
    • /
    • 2014
  • To study the business performance, this research reviewed the revenue of 2012 for shipping and logistics companies in Korea, then selected 10 shipping companies and 10 logistics companies according to annual sales amount. These 20 companies are divided into four groups considering their business structure and their financial performance are organized from 2005 to 2012. Then CCR, BCC model has been applied to static efficiency and dynamic changes in productivity for analysis. As an overall result, logistics companies are proven to be better than shipping company in efficiency, change of productivity, growth and profitability. Among the logistics companies, the performance of second party logistics companies are relatively better in those factor above than the third party logistics companies.

Usability Evaluation of Foot Pedal Switch in X-ray Radiography System (진단용 엑스선 촬영장치에서 발판 스위치의 유용성 평가)

  • Kwon, Hyeokjin;Jung, Hongmoon;Jung, Jaeeun;Jung, Kyunghwan;Won, Doyeon
    • Journal of the Korean Society of Radiology
    • /
    • v.12 no.5
    • /
    • pp.651-658
    • /
    • 2018
  • A foot pedal switch in the diagnosis x-ray radiography system has been researched to improve radiologic technologist works and patient satisfaction. The switch has been installed in the diagnosis x-ray radiography system used in domestic clinics. Quantitative evaluation has been conducted by measuring the exposure dose reproducibility test, tube voltage, mAs, and percentage average error. Qualitative evaluation has been conducted by analysis of the radiologic technologists questionnaire. In the quantitative evaluation for the use of the foot pedal switch, the coefficient of variation was less than 0.05 in the exposure dose reproducibility test. In the mAs test, percentage average error of ${\pm}20%$ was measured. There was no problem raised since it meets the all inspection standards of the diagnosis x-ray generator. In the qualitative evaluation, most of the opinions are that it has a clinical value for the foot pedal switch in the diagnosis x-ray radiography system. Therefore, developing the foot pedal switch for the diagnosis x-ray radiography system can improve effectively the rapidity and accuracy of the radiologic technologist work. In addition, it is effective in decreasing the x-ray exposure of patients and increasing satisfaction for the medical service due to reduction of retaking x-ray.

Development of Simultaneous Analysis for Multiple Agricultural Pesticides in Raw Milk Products using GC-MS/MS (GC-MS/MS를 이용한 원유 원료 중 농약 동시분석법 확립)

  • Young Nae Choi;Yoon ho Shin;Hwangeui Cho;Jung Bok Kim
    • Journal of Food Hygiene and Safety
    • /
    • v.38 no.6
    • /
    • pp.420-429
    • /
    • 2023
  • GC-MS/MS using liquid-liquid extraction (LLE) and C18 cartridges was used to identify and quantify levels of chlorpyrifos, chlorpyrifos-methyl, cypermethrin, deltamethrin and permethrin in bulk raw milk. A calibration curve spanning 10 ng/mL to 200 ng/mL was obtained with a satisfactory correlation coefficient of 0.99. The limits of detection (LOD) and limits of quantitation (LOQ) for chlorpyrifos, chlorpyrifos-methyl, cypermethrin, deltamethrin, and permethrin in the matrix ranged from 0.06 to 1.81 ng/mL and 0.19 to 6.04 ng/mL, respectively. The recoveries of 5 pesticides from spiked samples at 37.5-125 ng/mL ranged from 86.1 to 102.1%. The measurement of uncertainty of the GC-MS/MS method for these five pesticides was developed based on the analytical process and quantification. An analysis method that is easier and faster than the method specified in the Korean food standards codes for analyzing these five pesticides in raw material milk was developed. Moreover, the analytical method for chlorpyrifos, chlorpyrifos-methyl, cypermethrin, deltamethrin, and permethrin in bulk raw milk by GC-MS/MS was established.