1 |
Lee, U. S. (2000), "Management of Schedule and Cost Integration", Construction Industry Training Institute, pp 309-337
|
2 |
Kim, J. J. (2003) "A Study on The Issues of Domestic Earned Value Payment Established In Accordance With The EVMS Introduction and Costs Associated With Its Improvement - Evaluation", Journal of Korean Society of Civil Engineers, pp 643-648
|
3 |
Kang, I. S. (2003), "Contract Type Analysis and Improvement of Local Government Order Construction ", Journal of Korean Society of Civil Engineers, Conference Proceeding
|
4 |
Park, H. T. (2013), "Construction Schedule Management", Gimundang Publisher, pp 11-338
|
5 |
Park, H. T. (2014), "A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House" Journal of the Korea Society of Disaster Information. Vol. 10 No 1 pp 15-24
DOI
|
6 |
Park, C. J. (1998), "A Study on The Construction Management System of Schedule and Cost Integration", Myongji University Graduate, Doctoral Thesis, pp 1-100
|
7 |
Paul Teicholz. (1987), "Current Needs for Cost Control System, Conference Proceeding on Project Control, ASCE, pp. 47-57
|
8 |
Rasdorf, W. J. (1991), et al., "Cost and Schedule-Control Integration", Journal of Construction Engineering and Management, Vol. 117, No. 3
|