The Analysis of the Major Cost-increasing Risk Factors from the Perspective of Construction Management -Focusing on Pre-construction Phases- (건설사업관리자 관점에서의 주요 사업비 초과 리스크 요인 분석 -시공 전(前)단계를 중심으로-)

  • Kim, Byung-Yong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.147-155
    • /
    • 2012
  • Recently, various construction projects are invested with plenty capital, manpower and resources. The advanced methods of the construction management is introduced to Korea. However, the cases which get involved in excessive cost frequently occur. We can explain it means that the cost management in the entire phases and the risk factors in its works has not been done yet as expected. Thus, it is necessary to unearth risk factors relative to cost management and analyse them for preventing cost-increasing and the success of projects. In this point of view, this study aims to identify the risk factors of the cost management focused on pre-construction stages from the perspective of construction management which is possible to take part in the whole phases and works in cost management. Also, the impact priority and grade of risk factors to cost-increasing are evaluated by using FMEA.

A Study on Cost Management at the Pre-construction Phase in the Korean Construction Market (공공건설사업 시공 전 단계 사업비관리 개선에 관한 연구)

  • Kim Min-Kee;Shin Sung-Hoon;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.265-270
    • /
    • 2002
  • Frequent design changes or unnecessary project executions due to illogical practice, lack of feasibility study and, hasty drive have raised problems of budget waste in Korean construction projects. Since the MOCT (Ministry of Construction & Transportation) published Master Plan for budget efficiency for government projects, there have been a lot of policy efforts for budget saving. However, it has been pointed out that cost management at the pre-construction phase, which greatly influences the cost still remains imperfect. The target cost for government clients is not being estimated reasonably, and cost controlling at the pre-construction phase is not yet being carried out properly for keeping the budget. Therefore, improved construction cost management at the pre-construction phase was proposed in this paper. The cost management systems of advanced countries were investigated for it, and the issues were drawn from the cost management systems of these countries. On the basis of the issues, the present conditions and problems of domestic construction cost management at the pre-construction phase were analyzed for suggestion.

  • PDF

Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.

Improvements on the Total Project Cost Management System for SOC Projects (SOC건설사업의 총사업비 관리체계 개선방안)

  • Kim, Young-Jae;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.105-114
    • /
    • 2010
  • As the Korean economy went into a recession because of the global financial crisis in 2008, in order to vitalize the Korean economy, the government raised SOC budget and made its execution earlier. To prevent increases in budget for the government financial investment projects, the government controlled the project cost of SOC construction projects by enacting 'Guideline for total project cost management' in 1994 and complementing the relevant system. However, different from government intention, the total project cost of SOC projects were increased drastically. Hence, the government authorities and research institutions insisted the necessity of supplementation and improvement for the total project cost management system. This research is to provide the improvement for the total project cost management system of domestic SOC projects. In this research, As-Is Model was adjusted considering status of the total project cost management in the current SOC projects. Also the cost management of construction projects between domestic and other developed countries was studied, analyzed and compared. Based on the above, problems related to total project cost management of domestic SOC projects were found out and an improved total project cost management was provided to improve these problems.

민자사업의 사업관리 사례분석

  • Lee Kwan-Young;Kim Se-Jong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.13-19
    • /
    • 2004
  • In most PFI(Private Finance Initiative) projects in Korea, the project management are in charge of the Special Purpose Company(SPC) established for carrying out the project. This paper is a case study about an owner CM executed by the organizations and staffs of SPC itself. : Seoulbeltway (Ilsan $\~$ Toegaewon) Private Investment Project. In time management area, the SfC was the leader of project management throughout the life circle - plan, design, permit, construction, operation and maintenance - beyond the schedule manager's role. In cost management area, the methods of reducing the total costs by VE, new technologies, etc. has been needed assuming the construction risks were subject to SPC.

  • PDF

Approximate Estimating Model for PSC BEAM Bridge Using Influence Factors (PSC BEAM 교량 공사비 영향요인을 이용한 개략공사비 산정모델 개발)

  • Kang, Chan-Sung;Lim, Won-Seok;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.585-588
    • /
    • 2007
  • This study attempts to analyze estimating process and the level of information performing literature review and questionnaire and identify phased influence factors on construction cost using phased information of project and suggests framework of approximate estimation model at the planning and design stage. This paper suggests phased influence factors on construction cost and framework of approximate estimation model for integrated project cost management.

  • PDF

An Economic Analysis of Agricultural Automated Water Management Project and an Study on the Enlargement Plan (농업용수관리자동화사업에 대한 경제효과 분석 및 발전방안 연구)

  • Jee, Yong-Geun;Kim, Sun-Joo;Kim, Phil-Shik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.953-957
    • /
    • 2006
  • 농업용수관리자동화사업의 시행은 수자원관리 중에서 용수절약 및 유지관리비 절감을 위해 도입된 용수관리 개선방안 중의 하나이다. 현재 대부분의 수리시설이 수원공 관리인과 수로감시원의 인력에 의해 관리되고 있으며 2004년 수리시설물의 관리비 집행내역을 살펴보면 시설유지비 54.2 %, 개보수비 34.2 %, 적립금 및 기타 비용이 11.6 %를 차지하고 있다. 이 중의 시설유지비는 인거비의 상승으로 1999년 41.4 %에서 2004년 54.2%로 증가되었으나 개보수비는 같은 기간에 41.5 %에서 34.2 %로 감소된 것으로 나타났다(농업생산기반정비사업 통계연보, 2005). 따라서 농업용수관리자동화는 시설관리비와 개보수비의 절감 그리고 적정한 용수관리에 의한 용수절감을 위해서 더욱 확대 보급할 필요가 있다. 본 연구에서는 농업용수관리자동화 사업이 추진되어 운영되고 있는 충주지구를 선정하여 총사업비, 인건비, 유지관리비(통신료, 전력사용료 등), 수선유지비, 기타비용 등의 비용과 인력절감효과, 용수절감효과, 재해경감효과, 공익적효과 등의 편익을 분석하였다. 농업용수관리자동화시설에 대한 비용-편익 분석을 한 결과, 경제적인 효과가 있는 것으로 나타났으며 지속적인 사업의 시행을 위해서는 시설에 대한 교육, 전문인력의 보충, 운영 및 유지관리비의 투자가 병행되어야 한다고 판단된다.

  • PDF

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

A Study on the Improvement of Total Cost Change Control in Private Investment Projects (민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로)

  • Kim Se-Jong;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.119-126
    • /
    • 2001
  • This paper analyzes problems related to total cost changes in private investment projects, and then proposes an improvement measure for the control of cost changes within the framework of the project management, contract, human resource, project communication, cost, and time management. From the viewpoint of contract management, the basis of cost change ought to be cleared up with standardization of related provisions in the concession agreement, and potentiality of change ought to be excluded with prescription of the private investor's leading role from the design phase. Regarding human resource management, this paper proposes a standard work flow granting much sovereign rights to private parts by putting restriction on work scopes of the entrusted authority of government, and transferring the rights of assignment, contract, and control about the responsible supervisor to the concessionaire. With regard to project communication management the notification of changes on drawings and technical documents ought to be automated and the realtime database ought to be established with DMIS (Drawings & Documents Management Information System). From the cost management point of view, this thesis integrates the control of cost-change-approved items and disapproved items to one cost breakdown system, and then harmonizes the actual progress with EVMS in time management.

  • PDF

The Process Development and Application of the Contingency Management by the Performance Analysis (성과분석을 통한 건설공사 예비비 관리 프로세스 및 적용)

  • Lee, Man-Hee;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.84-92
    • /
    • 2007
  • To reduce uncertainties and make rational plans, the presumption of contingency against a failure of projects and an occurrence of unpredictable risks is important with accurate estimations as the work progressing. Therefore, if the presumption of contingency reflecting uncertainties carries out at a decision making point of time, be able to prepare for risks. The purpose of this paper is to present a management process of contingency through the performance analysis of project. In the cost planning phase, this study offers a process which is predictable contingency and predicts the range of fluctuation of the cost, laking an advantage of EVM in construction phase. With reflecting the results from this procedure, this study presents a process, rationally manageable contingency.