• Title/Summary/Keyword: 분석적계층화법

Search Result 10, Processing Time 0.02 seconds

An Evaluation Scheme on Feasibility in Public Sector for 3D Geo-Spatial Information - Focusing on Production of Digital Mapping (3차원 공간정보의 공공부문 사업성 평가 방안 - 2차원 수치지도 제작 업무를 대상으로)

  • Joo, Yong Jin;Kim, Kang Soo;Hahm, Chang Hahk
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.20 no.3
    • /
    • pp.73-82
    • /
    • 2012
  • In order to carry out efficient investment and successful business in national geo-spatial industry, economic assessment on the field of 3D geo-information has recently emerged as a serious issue. Therefore, this study is intended to offer cost-effective evaluation scheme which are proper for 3D geo-spatial information, especially focusing on development of orthophoto and DEM. The study is organized as follows. The first section clarifies preliminary rules for feasibility by defining target work and category in order to estimate benefit. Then, this paper will be limited to consideration of production of digital mapping for target business which is expected to create high value and its benefit from cost reduction is suggested. Drawing from the AHP(Analytic Hierarchy Process) methods, this study comprehensively described final result and implication to examine business value. Consequently, this study can suggest economical evaluation methods on 3D geo-spatial information industry, which takes up a considerable part of immaterial benefit and has difficulties in economic assessment and estimation. preventing a variety of errors in system operation in advance.

A Evaluation Model of AHP Results Using Monte Carlo Simulation (Depending on the Case Studies of Road and Rail) (몬테카를로 시뮬레이션을 통한 AHP결과 해석모형개발 (도로 및 철도부문 사례를 중심으로))

  • Sul, You-Jin;Chung, Sung-Bong;Song, Ki-Han;Chon, Kyung-Soo;Rhee, Sung-Mo
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.4
    • /
    • pp.195-204
    • /
    • 2008
  • Multi-Criteria Analysis is one method for optimizing decisions that include numerous characteristics and objective functions. The Analytic Hierarchy Process (AHP) is used as a general Multi-Criteria Analysis considering many critical issues. However, since validation procedures for the decision reliability of AHP valuers had been left off existing methodologies, a new methodology including such validation procedures is required to make more reliable decisions. In this research, idea decision results are derived using Monte Carlo Simulation in cases where AHP valuers do not have expertise in the specific project, and these results are compared with the results derived from experts to develop a new analysis model to make more reliable decisions. Finally, this new analysis is applied to various field case studies of road and rail carried out by the Korea Development Institute (KDI) between 2003 and 2006 to validate the new analysis model. The study found that approximately 20% of decisions resulting from the existing methodology are considered prudent. In future studies, the authors suggest analyzing the correlation between initial weights and final results since final results are enormously influenced by the initial weight.

A Study on the Consciousness of Maintenance Work of Small-scale Apartment Owners (소규모 공동주택 소유자의 유지관리 업무에 대한 의식구조 분석)

  • Cha, Chang Jin;Yoon, Hyo Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.5
    • /
    • pp.647-656
    • /
    • 2019
  • This paper aims to analyze the priority of elements in building management system surveying owners living in Small-scale Apartment, and to suggest basic data for establishing effective management alternatives. To achieve the goal, this paper extracted the elements from a guideline supported by the Ministry of Land, Infrastructure and Transport in Korea, and tried to analyze their priority. The result as follows. First, the analysis of the first level suggested that people give priority to facility management, moving management, security management and administrative for management. Second, on the analysis of the second level, settlement of budget was the most important for the administrative, cleaning for facility management, parking management for security management and advertisement of the administrative for moving management. By suggesting the result, this paper concludes that it would be very important to establish a regional management corporation to manage the Small-scale Apartment.

Weights of Attributes in Creating Transit Malls (대중교통전용지구의 조성목적에 따른 계획요소별 중요도 평가)

  • Park, Jong-Il;Chang, Justin S.
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.2
    • /
    • pp.130-138
    • /
    • 2014
  • This paper assessed the weights of attributes in creating transit malls. The aim of the creation was classified as travel demand management and urban revitalization. The attributes were grouped into four aspects, or 4As: attraction, amenity, accessibility, and activity. These dimensions represented land-use, urban design, transport, and socio-cultural characteristics, respectively. The analytical hierarchy process was applied to explore the weights. Accessibility(52.7%), attraction(25.6%), amenity(13.7%), and activity(8.0%) were the order of magnitude in weights for the purpose of travel demand management, while attraction(36.1%), accessibility(30.6%), amenity(17.7%), and activity(15.6%) were that of urban revitalization. The multi criteria analysis also showed different size of weights in the sub planning attributes. These results indicate that the aimin implementingtransit malls should be differentiated and highlight that the combined land-use and transport plan is essential for the successful development. Car accessibility and socio-cultural characteristics are also understood as the important factors.

Assessment of Safety Climate Metrics in Construction Safety Management (건설 안전관리를 위한 Safety Climate 평가요인별 중요도 분석 연구)

  • Han, Bum-Jin;Kim, Taehui;Son, Seunghyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.607-618
    • /
    • 2023
  • Pervasive research underscores the direct correlation between an enhanced safety climate and a marked reduction in accidents. The intricacies of safety climate are governed by three pivotal strata: organizational management, on-site operations, and the broader enterprise framework. Within an organizational context, sustaining optimal performance across these layers poses a considerable challenge, often attributable to the constraints of available managerial bandwidth. It becomes imperative, then, to conceive a phased enhancement blueprint for the safety climate. To orchestrate this blueprint with precision, a discerning understanding of the hierarchy of safety climate metrics is essential, which subsequently guides judicious managerial resource allocation. This investigation is anchored in elucidating the hierarchical significance of safety climate metrics through the Analytical Hierarchy Process(AHP). Implementing the AHP framework, both a questionnaire was disseminated and a subsequent analysis undertaken, culminating in the extraction of relative priorities of safety climate determinants. Consequent to this analysis, "workers' safety prioritization and risk aversion" emerged as the foremost dimension, holding a significance weight of 0.1900. Furthermore, within the detailed elements, "unwavering adherence to safety mandates amidst demanding operational constraints" ranked supreme, manifesting a weight of 0.6663. The findings encapsulated in this study are poised to be foundational in sculpting improvements at an institutional level and devising policies, all with the end goal of fostering an exemplar safety climate within construction arenas.

Development of an Technique for Assessing Priority of Alternatives in Railroad Projects Considering Civil Petitions (민원을 고려한 철도대안 우선순위 판단기법 개발)

  • Chung, Sung-Bong;Song, Ki-Han;Hong, Sang-Yeon;Kim, Dong-Jun;Kim, Dong-Sun
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.7 s.85
    • /
    • pp.87-98
    • /
    • 2005
  • Through rail transit has many merits as a safe, environmental harmonic and scheduled transit, there are many problems to construct railroads because of the public resentment. However, there is no reasonable way to settle the conflict properly and it causes enormous social and economic losses. This paper suggests a methodology to evaluate public complaint using the AHP technique, which is generally used as the methodology to evaluate public complaint using the AHP technique, which is generally used as the Multi-Criteria Decision Making (MCDM). However, the result from the AHP has some defects to control conflicts because the interests related to railroad projects are so complex that it is hard to make people persuaded easily. Therefore, this paper suggests 'the improvement ranking method', 'the sensitive analysis', and 'the assessment of independence relationship' which can aid the basic AHP to be robust. And the AHP. modified by fuzzy method, is also suggested to apply this methodology to example rail paths in Korea.

The maximum limiting characteristic method-based land suitability assessment for peaches (Prunus persica) and grapes (Vitis vinifera L.) using rasterized data of soil and climate on agricultural land in South Korea (토양 및 기후정보 통합 최대저해인자법에 의한 복숭아와 포도의 적지 평가)

  • Kim, Hojung;Koo, Kyung-Ah;Shim, Kyo-Moon
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.21 no.4
    • /
    • pp.286-296
    • /
    • 2019
  • Land suitability assessments have been a crucial issue for enhancing productivity in agriculture and conserving agricultural lands. Based on soil and climate information, land suitability assessment for peaches (Prunus persica) and grapes (Vitis vinifera L.) were conducted using the maximum limiting characteristic method (MLCM) in South Korea. In peaches, S1 (highly suitable) exists on 2.21% of the land, S2 (moderately suitable) on 19.20%, N1 (currently not suitable) on 12.07%, and N2 (permanently not suitable) on the remaining 66.52%. In grapes, 3.65% of the land is classified as S1, 17.98% as S2, 11.85% as N1 and 66.52% as N2. In both fruit trees, the results acquired from soil and climatic information were similar to those from soil information alone. The data also suggest that the grades by soil information were relatively low over the land. With the assumption that the more suitable area a province has, the more will be cultivated for the fruit trees, we compared the percentages of area for peach and grape farming per province with the results by MLCM, and suggested that some provinces with a small percentage of farm can be encouraged to plant more in suitable areas as dictated by MLCM for the species. In the near future, we plan to use an advanced method such as analytic hierarchy process (AHP) to conduct similar tests, in which having reference data of yields or benefits per farm can efficiently increase the accuracy of the measurements.

A Study on the Identification of Hazardous Factors and Prevention of Accident in Old Boilers (노후보일러 유해인자 발굴 및 사고예방에 관한 연구)

  • Sa, Min-Hyung;Woo, In-Sung
    • Journal of the Korean Institute of Gas
    • /
    • v.23 no.4
    • /
    • pp.1-9
    • /
    • 2019
  • Large-scale industrial boilers operating at high temperature and high pressure, have a large amount of water, and a large amount of energy is released at the time of explosion. Currently, most industrial boilers use gas fuel such as LNG and LPG, etc. and fuel exists in the same space as equipment, so there is a high possibility of secondary damage such as fire or explosion in the event of a boiler accident. Both special care and management are required to operate the very dangerous equipment that causes casualty 2.51 per accident. For boilers of a certain size or more, the Korea Energy Agency conducts inspections in accordance with the Energy Usage Rationalization Act, KS, and public notice of the Ministry of Industry, Trade and Resources. In this research, based on the results of the inspection, the hazard factorss are configured, and a questionnaire is conducted to the inspector, the equipment manager, the maintenance person, and the person in charge of the manufacturer. We analyzed the results by using AHP (Analytic Hierarchy Process). As a result of analysis, generally recognized hazard factorss are not good management, measurement failure, specification failure, water leak, leak analysis, but connection, welding, scale, and corrosion, etc. are relatively less important. It is judged that the adverse factors that are recognized to be highly important among all groups and careers are already well managed, but less important and adverse factors should be well managed to ensure that the safe usage of the boiler.

A Strategy for Developing New Road Projects (경관도로 등 신개념의 도로사업 개발에 관한 연구)

  • Kim, Eung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.115-127
    • /
    • 2007
  • Developed countries, especially in road construction and management fields, introduce new road porjects such as National Scenic Byways Program(NSBP program) in USA and the Eco-road project in Japan. This study develops a conceptual model for deploying new road projects in Korea. The four step approach is suggested to create new road projects, including foundation of an act based on the existing Road Act, creation of new road project ideas, development of evaluation process and guidelines, and enhancement of an administrative scheme. To create new road projects, three different ways are devised; (1) designation of national roads having uniqueness in overall spectrum, (2) designation of roads having intrinsic values in a different aspect, (3) designation of single structures of engineering outcomes such as bridges, tunnels, new design techniques, considerable Value Engineering output, and well analyzed Life Cycle Cost Analysis practices. For the evaluation process, NSBP program of USA and/or Sustainable City Award program of Korea would be recommended. An administrative scheme and integrated funding process for the new road projects are also suggested based on evaluation of tasks of each team or division of Korea Ministry of Construction and Transportation.

  • PDF

GIS-based Land Suitability Assessment for Pears (Pyrus) Using Soil and Climate Conditions in South Korea (GIS 기반의 토양 및 기후조건 통합 배 과수의 적지 평가)

  • Kim, Hojung;Shim, Kyo-Moon
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.21 no.4
    • /
    • pp.337-346
    • /
    • 2019
  • Land suitability assessments for agricultural crop production determine the suitability of an area in terms of crop yields. We employed the maximum limiting characteristic method (MLCM) and an analytic hierarchy process (AHP) to assess land suitability for Pears (Pyrus) in all Korean provinces (Dos). In general, suitability grades according to the MLCM were much lower than those according to the AHP. The MLCM determined that suitable areas (S1, S2, and S3) exist on 19.55% of the land, whereas 99.08% of the land was classified as suitable by the AHP. Based on information on pear farms in each Korean province in 5 years (1982, 1987, 1992, 1997, 2002, and 2007), the proportion of suitable land area according to the MLCM in each province as compared to all suitable areas was closer to the proportion of areas covered by pear farms in the 5 years in each province and also to the proportion of pear farm areas in 2007 in each province. Based on the assumption that if a province has more suitable areas for pears, more pears will be cultivated in that province, the results of the MLCM can be regarded as more accurate than those of the AHP.