A Study on the Estimation of Elemental Costs for an Apartment Building (공동주택에 대한 부위별 공사비 산정에 관한 연구 - 사례 H사의 실행단가를 중심으로 한 연구 -)

  • Kang, Hyun-Wook;Yoo, Jong-Hwan;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.173-181
    • /
    • 2007
  • The purpose of this study is to estimate elemental costs of an apartment building. The adapted research method includes a case study from $^{\circ}{\AE}H^{\circ}{\phi}$ construction company. The results of this study are as follows: 1) An elemental cost format of an apartment building is proposed, 2) An elemental cost table based on a case study of $^{\circ}{\AE}H^{\circ}{\phi}$ construction company is suggested.

A Study on the Analysis of Actual costs and Maintenance costs for Elemental Classification hierarchy (부위별 분류 체계를 통한 공사비 및 유지관리비 분석 - 교육 시설물을 중심으로 -)

  • Kang, Hyun-Wook;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.142-150
    • /
    • 2010
  • The purpose of this study is to analyze maintenance costs and estimation of elemental costs for educational buildings. The adapted research method selected four school buildings in seoul region as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and estimate analyzed construction costs and maintenance costs according to that system. According to the analysis, the study proposed a partial construction costs analysis table and maintenance costs table and analyzed proper construction costs and maintenances costs. The results of this study are as follows 1) The average ratio followed by calculation of partial construction costs of the four school buildings are as followings. The total construction costs is analysed 6,666million won and each part of average rations is structure 47.15%, exterior of building 8.34%, interior of building 23.37%, electricity & fire fighting facility 5.74%, water supply & healthy facility 4.27%, heating & water supply facility 5.25%, landscape 1.36%, civil engineering works 4.51%. 2)The average ratio followed by analysis of partial maintenance costs of the four school buildings are as followings. The total maintenance costs is analysed 4,309 million won and each part of average ratio is exterior of building 11.02%, interior of building 41.81%, electricity & fire fighting facility 14.81%, water supply & healthy facility 11.22%, heating & water supply facility 12.76%, landscape 5.75%, civil engineering works 2.63%.

New Building Materials and Methods for Modernized Korean Housing (Hanok) (보급형 신한옥을 위한 부위별 공법 개발 및 영향도 분석)

  • Kim, Min;Kim, Hyosun;Ryu, Jaeseon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.23-32
    • /
    • 2014
  • Modernized Korean housing (Hanok) with competitive price has been actively developed due to the increased interests in traditional Korean housing. Developing new building materials and methods is an essential area for Modernized Hanok. This paper compared and analyzed two mock-up buildings of Modernized Hanok and one mock-up of Traditional Hanok those were actually constructed as test-beds. Many different new methods were introduced, and their influences on construction cost and schedule were analyzed in order to verify the research results as well as to find implications for future direction. As a result, the construction cost and schedule of Modernized Hanok have been decreased by about 40% and 20%, respectively, when compared with traditional one. 'Wood frame' and 'Roof' are found as being the most influencing areas with highest weights in terms of cost and schedule. Therefore, further development in these two areas would facilitate to reduce overall cost of Modernized Hanok with improved building performance.

The Extraction Method of Spacial Element Cost based on the Quantity Take-Off and Bill of Quantity (건설공사의 수량산출서 및 산출내역서 기반 공간별/부위별 공사비 추출방법에 관한 연구)

  • Nam, Dong-hee;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.232-233
    • /
    • 2021
  • As construction projects become larger and more complex in the construction environment, and as the Building Information Model(BIM) is technically introduced, the demand for construction costs in units of space is increasing. Cost estimating of spacial element can reduce the error in cost prediction method based on cost of work type and to utilize the construction cost data for each space in the design phase. The purpose of this study is to extract spatial statements by utilizing spacial information of quantitative statements based on items that are common elements of the Quantity Take-Off and Bill of Quantity.

  • PDF

Development of the Space Cost Breakdown Structure(CBS) for Multi-Family Housing Projects (공공아파트 건설공사의 공간별 공사비분류체계 개발)

  • Hyun, Chang-Taek;Koo, Kyo-Jin;Yeon, Hee-Jung;Moon, Hyun-Seok;Cho, Kyu-Man;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.178-187
    • /
    • 2007
  • As the government has enforced recently the policies on the distribution of the housing, the construction cost of multi-family housing projects has increasingly become very sensitive and political issue. However, it is difficult to predict the construction cost in planning and design phase of the project because the Bill of Quantity of the multi-family housing projects was composed of breakdown structure based on each work package. To predict the construction cost in planning and design phase for multi-family housing projects in more effective and reasonable way, this study developed the cost breakdown structure based on spaces using Delphi method. The Cost Breakdown Structure (CBS) based on spaces for multi-family housing projects basically consists of three parts: (i) Building part; (ii) Non-building part; and (iii) Additional part. The characteristics of spaces in multi-family housing projects are fully taken into consideration. Then these three parts were subdivided into work packages in terms of work tasks. Additionally, the usefulness and effectiveness of Space CBS in this paper were validated by analyzing the BOQs of several collected sample projects and matching with Space CBS afterwards.

기획단계에서의 최적 개산견적산정의 방법론 고찰

  • Kim Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.120-125
    • /
    • 2003
  • The estimated construction costs derived at the Planning stage of a project are utilized as important data determining the feasibility of overall project. Therefore the clients usually expect to have estimations of the construction cost as precise as possible and there has been extensive studies carried out by the cost specialists worldwide to satisfy this client's specific need whereas the local estimators still heavily rely on producing quantities and detail quotations only. This paper is to introduce a case study where elemental/functional area cost analysis is incorporated into a database system for the improved accuracy in cost estimations.

  • PDF

Selection Method for Component Alternatives of Considering Building Systems Correlation in Remodeling Projects (리모델링 프로젝트에서 건축시스템 상관관계를 고려한 부위별 대안선정 방법)

  • Park Chan-Gil;Lee Dong-Jun;Shin Chang-Hyung;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.402-405
    • /
    • 2003
  • As Remodeling is proceed in the limited condition that is utilization of existing resource, the selection of remodeling objects and scope are affected by the correlation of building systems. Unexpected problems have occurred in construction phase by lack of the consideration about correlation of building systems; increasing of cost, delaying of schedule etc. Therefore, this research suggests the Building System Correlation Diagram Model and the method for selecting the alternative reasonably in remodeling project.

  • PDF

A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis (실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구)

  • Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.192-200
    • /
    • 2003
  • The object of this research is to develop a computerized algorithm of cost estimation method to forecast the total construction cost in the bidding stage by the historical and elemental work cost data. Traditional cost models to prepare Bill of Quantities in the korea construction industry since 1970 are not helpful to forecast the project total cost in the bidding stage because the BOQ is always constant data according to the design factors of a particular project. On the contrary, statistical models can provide cost quicker and more reliable than traditional ones if the collected cost data are sufficient enough to analyze the trends of the variables. The estimation system considers non-deterministic methods which referred to as the 'Monte Carlo simulation. The method interprets cost data to generate a probabilistic distribution for total costs from the deficient elemental experience cost distribution.

Selection Method of Alternatives for Considering Correlation between Component Elements in Remodeling Design Process (리모델링 설계단계에서 부위구성요소의 상관관계를 고려한 대안선정 방법)

  • Park Chan-Gil;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.53-61
    • /
    • 2004
  • As remodeling project is progressed in the constraint which is utilization of existing resource, the subject of remodeling and extend of construction are affected by the correlation between building element. Therefore, this research analyze the correlation between component of building element in the design phase and proposed the diagram model for correlation between building element and proposed selection method of alternative plan for optimized combination of building element in remodeling project.

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.