Extracting Seismic Reinforcement Priorities to Promote Safety at Airmen Dormitories Using DEA (DEA 기법을 이용한 공군 병영생활관 내진보강 우선순위 도출)

  • Park, Keunwoo
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.22 no.5
    • /
    • pp.697-704
    • /
    • 2019
  • The public has grown more anxious towards domestic earthquakes that have been taking place since 2000, and regulations on seismic design has been strengthened. Out of 4,605 Air Force installations that require the application of seismic design, 2,982 remain unapplied. By taking budget issues and the time spent to implement seismic retrofit into account, this paper aims to list up seismic reinforcement priorities for airmen dormitories where they can potentially be most vulnerable to earthquakes. The priorities are extracted based on Data Envelope Analysis(DEA). To apply DEA, two sets of variables are set: seismic reinforcement costs as input variable: age of building, number of residents, and seismic load as output variables. At the end, suggestions are made for developing seismic reinforcement plans that can be applied to all Air Force installations.

Cost Estimating for Public Facilities at Early Stage Using Functional Area Cost - Focusing on Army Barracks - (공공건축물 계획단계에서의 용도별 공사비 예측에 관한 연구 - 육군 병영생활관을 대상으로 -)

  • Lee, Hyun-Soo;Jung, Myung-Jun;Park, Moon-Seo;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.3-13
    • /
    • 2010
  • The purpose of this research is to develop a conceptual model that establishes a new approach for functional area cost estimating in the schematic design phase. A cost estimating model should consider not only the estimate accuracy, but also the flexibility to the design alternatives and user-oriented serviceability. Therefore, this research uses the method that classifies various facilities of a building according to its functions by analyzing historical data. After setting the functional area as cost parameter, a formula which can estimate functional area cost is derived from statistical analysis. Finally, to validate the proposed conceptual model, it is applied to historical data of a military barrack project. It enables customized space planning reflecting client's needs and compares the cost of various design alternatives as well as improves estimate accuracy.

Study on facility classification development of Military Barracks - Focusing on the questionnaire survey and military officials' interview of the army, navy, air force and Marine - (병영 생활관 시설 분류 개선에 관한 연구 - 육·해·공·해병대 설문 조사 및 군 간부 면담 조사를 중심으로 -)

  • Sung, Lee-Yong;Yi, Sang-Ho
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.1
    • /
    • pp.19-27
    • /
    • 2013
  • The objective of this study was to establish Facility classification for military barracks among military facilities. The military barracks are the place where soldiers spend most of their time. Thus, a new type of space in military barracks is required to improve the quality of life of the soldiers and make the military more advanced for national defense. The research method was to derive problems through a survey of the previous literature and case studies and to select target places in the Army, Navy, Air Force, and Marine based on the derived problems. An improvement scheme was proposed by developing criteria for military barracks spaces through a questionnaire survey. The following results were obtained: Facility classification inside of national defense military facility standard should be reorganized. The alternative plan is demanded for some camp which has no need about setting up the office facility. And the study of reasonable facility area after improvementing facility categorization is required.

Comparison of Predicted Maintenance Costs and Actual Maintenance Cost of Military Facilities - Focused on BTL Project - (병영 시설물 수선유지비용 예산대비 실투입 비교에 관한 연구 - BTL사업 중심으로 -)

  • Lee, Don-Soo;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.473-481
    • /
    • 2017
  • With the barracks modernization project, the Ministry of National Defense has been operating 60 projects of the 75 that have been announced. It was difficult to investigate and analyze the data in the past because data could not be obtained while it was much easier to do that since data can be obtained from private companies. With the aim of increasing the usability of the facilities, the objective of this study is to present a reasonable alternative for repair and maintenance costs by investigating and analyzing the budget and the actual expenses of repair and maintenance of military facilities for the past 3 to 5 years, and then identifying the problems with these. To accomplish this, a theoretical review of previous studies and legal grounds related to repair and maintenance costs was performed, and data on the estimates and the actual expenses data used in BTL projects carried out by private companies were analyzed. First, one of the problems was that there are some items omitted, including consumables, and these items should be included in order to secure their budget. Second, in terms of the items for divided payments, two improvements had been presented: a short-term payment plan for the operation period of 3 to 5 years and a long-term payment plan for an additional and complemented period other than the operation period. The repair and maintenance costs should be further studied at the point of time in a future when the actual data on the costs and operation period of military facilities can be secured. This study is expected to serve as empirical data that will form the basis for a reasonable calculation of the construction cost for military facilities.

A Study on the Contributing Factors of a Successful Counseling for the Non-Voluntary Clients; Focusing on Military Servicemen (비자발적 내담자의 성공적 상담을 위한 활성화 요인에 관한 연구: 군 장병을 대상으로)

  • Jung, Yong chul;Yang, Jae hyuk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.256-266
    • /
    • 2020
  • This study examined whether the counselor's attitude or counselor's environment is more important in enhancing the satisfaction with counseling among military servicemen, who are non-voluntary clients of the counselor. This study was conducted on 488 military servicemen living in military barracks. These participants were interviewed using questionnaires, and the data were analyzed using SPSS 23.0 and AMOS 23.0. The findings of this study were as follows. First, the empathetic understanding, openness, extroverted attitude, self-exposure, and instructions, which were the sub-elements of the attitude of the counselor, all had a significant positive impact on the satisfaction with the counselor. Second, the environmental factors of the counselor, namely accessibility, visual attractiveness, cleanliness, convenience, and comfort, all had a significant positive impact on satisfaction. Third, verification of the differences in the satisfaction with the counselor, attitude of the counselor, and the environment of the counselor, depending on the rank of the military servicemen, showed a significant difference in every aspect except for the sub-element of self-exposure.

A Study on Construction Condition of Modular System by Structural Analysis of Construction Stage (시공단계 구조해석을 통한 적층형 모듈러주택의 시공조건 검토)

  • Jo, Min-Joo;Kim, Jong-Sung;Yu, Seong-Yong;Choi, Ki-Bong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.2
    • /
    • pp.143-150
    • /
    • 2015
  • At present, the actual condition is that Korean modular structures are limited to a low rise detached house and military barracks. And there is no standardized structural design method of stacked modular structure. Accordingly, in general, they don't review impact force in the stage of stacking and installing a module, the effect which wind load has on a structure in the stage of lifting, and inertial force occurring in the stage of lifting or transporting a module in the process of constructing a structure. Therefore, this study investigated the construction method of modular system to be studied in stages, and decided on the position to which load was applied and boundary condition in structural analysis at each construction stage. Besides, inertial force according to each speed was calculated in the lifting and wheeled transport of module. And we calculated impact load according to lifting speed in module stacking and installation work and wind load due to instantaneous wind speed in the installation work by lifting. On the basis of the suggested method, in the modular system to be studied, it carried out review of structure by changing determining conditions of load being applied by construction stage, such as in the stage of lifting, in the stage of transport, and in the stage of installation, and drew construction conditions securing stability structurally.

A Method of Assigning Weight Values for Qualitative Attributes in CBR Cost Model (사례기반추론 코스트 모델의 정성변수 속성가중치 산정방법)

  • Lee, Hyun-Soo;Kim, Soo-Young;Park, Moon-Seo;Ji, Sae-Hyun;Seong, Ki-Hoon;Pyeon, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.53-61
    • /
    • 2011
  • For construction projects, the importance of early cost estimates is highly recognized by the project team and sponsoring organization because early cost estimates are frequently a foundation of business decisions as well as a basis for identifying any changes as the project progresses from design to construction. However, it is difficult to accurately estimate construction cost in the early stage of a project due to various uncertainties in construction. To deal with these uncertainties, cost estimates should be made several times over the course of the project. In particular, early cost estimates are essential process for successful project management. For accurate construction cost estimates, it is necessary to compare cost estimates with actual costs based on historical project data. In this context, case-based reasoning (CBR), which is the process of solving new problems based on the solutions of similar past problems, can be considered as an effective method for cost estimating. To obtain this, it is also required to define the attribute similarities and the attribute weights. However, no existing method is capable of determining attribute weights of qualitative variables. Consequently, it has been a well-known barrier of accurate early cost estimates. Using Genetic Algorithms (GA), this research suggests the method of determining the attribute weight of qualitative variables. Based on building project case studies, the proposed methodology was validated.