Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.

Study of the Acceptance of Interested Parties(Auditor /Auditee) in the Information System Audit Technologies Based Technology Acceptance Model(TAM) (정보시스템 감리기술에 대해 이해관계자(감리인/피감리인)의 수용에 관한 연구 -기술수용모델(TAM)을 중심으로-)

  • Kim, Hak-Joon;Jeon, Soon-Cheon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.2
    • /
    • pp.1403-1413
    • /
    • 2015
  • An information System Audit by the recognition of a problem and suggestions for solutions for overall matters about constructing and managing information systems is needed in order to contribute to the improvement of an information system's quality and improving the performance of projects. In reality, however, the general cognition is that audit is biased by subjective opinions. For this, an auditor needs to measure the level of recognition of the usability and convenience of the technologies of automating audit by applying TAM in the information system audit, and to analyze the relationship with recognition and availability of the interested parties for the technology (tool) of the audit. By the hypothesis verification result, an auditor needs to present objective corroborative facts that back up the level of recognition and usability for the information technology in the field of audit. This study verified that the phenomenon of technology application can be explained and predicted by applying TAM in the field of audit. Through an empirical study of the recognition level of audit and contractor, the developer suggests that the audit plan stage is similar to the audit corrective action stage, but the audit action stage is different from the audit review stage. This research can verify the audit technology preferred for the availability and intention of use and usability.

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Improvement of the Evaluation Method for VE Alternatives using the Risk Assessment Process (리스크 평가절차 도입을 통한 VE 대안 평가방법 개선)

  • Park, Jin-Ho;Jin, Zheng-xun;Hyun, Chang-taek;Kim, Hyun-joo;Kwon, Suk-hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.32-42
    • /
    • 2018
  • Since the success or failure of VE projects depends on the capabilities of participants, including owners, construction managers, architects, general contractors and VE experts, it is important to follow systematic procedures. However, it is often the case that only a rough evaluation is performed, or the rough and detailed evaluations are integrated in actual VE tasks. In this case, it is difficult to analyze and evaluate the alternatives in terms of risk, even for the important alternatives. This in turn leads to the so-called returning alternatives where the alternatives proposed in the preceding stage are returned to the original plans in the following stage, and thus the repetitive work for the alternatives often decreases the efficiency of the VE task. In this regard, this study proposed a risk assessment process for VE alternatives in order to minimize the occurrence of returning alternatives based on the systematic analysis and evaluation of VE alternatives. It will increase the efficiency of VE tasks by reduces the number of regression alternatives.

Safety Management Framework for Information Handover Effectiveness in the Construction Industry (건설 안전관리 개념적 틀 및 정보이양 효율성 분석)

  • JIN, Zhenhui;JUNG, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.50-61
    • /
    • 2020
  • Safety management has been one of the most critical issues in the construction industry for a long time. Despite continuous efforts, it still shows a higher accident rate than other sectors. To reduce the accident rate, a lot of studies have been performed, mostly focused on contractors or construction phase. Although the initial stage of the construction project has the most significant impact on construction safety and decision-makers at the initial stage play an important role, the safety management system throughout the project entire life-cycle is still insufficient. In addition, although a great deal of information is generated in the construction project and the value is increasing, while it shows an inefficient aspect. This is believed to be due to insufficient information exchange and a lack of standards. In this context, this study aims to analyze the efficiency of information handover in construction safety. For this purpose, a safety management framework for systematically and efficiently managing and utilizing for construction safety information is referred to as 'safety business functions', 'project life-cycle', and 'industrial hierarchy'. The 'safety business functions' are classified into three levels. And then, in order to analyze the efficiency of safety information handover, 'importance of safety business function' and 'efficiency of safety information handover' were evaluated by interviewing with experts. This study can be used as reference data for implementing systematical and efficient safety management, and can also increase construction safety competency.

Construction of the Terminology Dictionary for National R&D Information Utilization (국가R&D정보활용을 위한 전문용어사전 구축)

  • Kim, Tae-Hyun;Yang, Myung-Seok;Choi, Kwang-Nam
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.10
    • /
    • pp.217-225
    • /
    • 2019
  • National research and development(R&D) information is information generated in the process of performing R&D based on programs and projects issued by national government departments, and includes information from various research fields as ordered by various departments. Therefore, for efficient R&D information retrieval, it is necessary to build a national R&D terminology dictionary that can reflect the characteristics of such national R&D information. In this study, we propose a method for constructing a national R&D terminology dictionary by applying the classification of science and technology standards used to specify the research field in national R&D information. We will discuss the structural characteristics of national R&D project information and the usefulness of the project keyword, and explain the status of national R&D information by the National Standard Science and Technology Classification(NSSTC) Codes and the characteristics of the national R&D terminologies. Based on this, a method for building a national R&D terminology dictionary is defined in terms of the type and structure of the terminology dictionary, preliminary construction procedures, and refining rules. The national R&D terminology dictionary built on the basis of this study can be used in various ways such as expansion of search terms using Korean-English equivalent words and synonyms when searching national R&D information, clarifying the scope of search using NSSTC, and providing user convenience functions using term explanation information.

Analysis of the Impact of the Expansion of Direct Construction Works and Suggestions on the Application (직접시공 확대의 영향 분석 및 직접시공의무제도 적용을 위한 대응방안 제언)

  • Lee, Meesung;Kim, Siyeon;Yu, Ilhan;Han, Ju-yeon;Son, JeongWook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.15-23
    • /
    • 2021
  • As the construction production system is reorganized as part of the construction industry innovation plan, direct construction is expanding. According to this trend, this study analyzed the impact and problems of the expansion of direct construction through the position of the construction industry and a study of foreign cases. In addition, by diagnosing the impact of the measures to expand direct construction from various aspects, countermeasures were suggested to suitably apply the direct construction mandatory system. Also, for each alternative, effects and problems were evaluated through interviews with experts in policy/administrative and architecture fields. The alternatives for expanding and improving the efficiency of the direct construction mandatory system derived from this study are four items: granting the discretion of the client, differentiation by scale of construction, utilization of construction guarantee system, and introduction of flexible working group leader system. As a result of the expert interview, all of them were evaluated to have a positive impact directly and indirectly on the expansion of direct construction. This study contributes literature to the application of the direct construction mandatory system by examining the current status of direct construction, and suggests a direction for expanding direct construction through deduction of alternatives for applying the direct construction mandatory system and expert evaluation.

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

Analysis of Causes and Impact of Change Orders in the U.S. Military Construction Projects (미군 시설공사 설계변경 요인과 영향에 대한 연구)

  • Park, Insung;Kim, Harim;Lee, Hak-Ju;Kim, Do-Hyung;Min, Yoon-Gi;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.213-219
    • /
    • 2021
  • Change orders that occur frequently during the construction phase, af ect the construction performance in terms of cost, time, quality, safety and environment, and place a huge burden for stakeholders of given projects. This study analyzed the causes of change orders and their impact on the basis of 721 cases and a questionnaire of 164 domestic U.S. military construction participants in a total of 24 U.S. military projects. Important factors for change orders in the US military construction projects were engineering change due to design errors (348 cases, 48.3%), user requests change(86 cases, 11.9%), and different site conditions (69 cases, 9.6%). In addition, due to the change orders, construction cost increased by 6.56% on average and construction period was extended by 21.1% compared to the original schedule. As a result, it is anticipated that domestic construction companies can obtain a better understanding of change orders and construction performance, which may be difficult due to accessibility and limitations to military facilities. Also, it is proposed a successor study that guides in the right direction for the U.S. Military Construction.