• Title/Summary/Keyword: 발주속성

Search Result 14, Processing Time 0.026 seconds

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

Relationships between Construction Client's Leadership and Best Practice for Project Success Empirical Finding from Best Practice Cases (건설사업 성공을 위한 발주자 리더십과 베스트 프랙티스 관계 연구)

  • Oh Young-Sup;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.216-219
    • /
    • 2004
  • Construction clients are the key player in that they initiate construction projects and are in a position to influence the efficiency and productivity of the projects. Construction projects by nature require team-working so clients's leadership is the crux of project success. The objective of this paper is to suggest characteristics of construction clients' leadership in terms of best practice based on the analysis of project success cases. Four key elements of construction clients' leadership are identified and best practice from the case studies were related to the elements.

  • PDF

Role of Public Owner for Delivery of Public Experience Facility Construction Project (공공 체험시설 건설사업 발주를 위한 공공 발주자 역할에 관한 연구)

  • Song, Hyunjang;Lee, Seunghoon;Jin, Zhengxun;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.28-36
    • /
    • 2022
  • Since the establishment of a large-scale public experience facility in Korea, the construction project of public experience facilities has recently changed to a form where local governments or local education offices place delivery alone or agreements. In particular, due to the low frequency of delivery and the nature of delivery organization that do not have specialized organizations specializing in Delivery Framework, the role of enhanced Public Owner is needed. In response, this study investigated the current status and operation status of public experience facility construction projects in Korea and derived problems and directions for improvement of the current role of Public Owner. In addition, the study proposed the improvement of the role of public Owner in public experience facilities, which are composed of the promotion stage and functions reflecting the factors and attribute information of the business characteristics.

탐방 현장을 가다 - 제일사료(주) 자금팀

  • Kim, Dong-Jin
    • KOREAN POULTRY JOURNAL
    • /
    • v.50 no.3
    • /
    • pp.130-134
    • /
    • 2018
  • 국내 사료 생산판매 1위를 달리고 있는 제일사료(주)는 지난 1월 29일 한국거래소로부터 환관리 우수업체로 지정받아 우수상을 받는 쾌거를 이루었다. 국내 사료업체는 사료원료를 해외로부터 수입하기 때문에 발주와 결제일에 차이가 있다. 주로 외화로 거래하는 속성상 환율 차를 잘 관리하지 못하면 엄청난 손실을 보게 된다. 이런 현상에 적극적으로 대체하여 자금 경색이 발생하지 않도록 대처하는 업무를 담당하는 제일사료(주) 자금팀을 만나보았다. 우수업체 선정에는 제일사료 박태준 관리본부장의 역할이 컸던 만큼 전 자금팀장과의 인터뷰를 통해 자금팀의 역할과 이번 수상의 의미를 짚어보았다. 박태준 관리본부장은 1994년에 제일사료에 입사하여 자금팀장을 거쳐 현재 제일사료 관리본부장(자금, 회계, 인사, 총무, 전산)을 맡고 있다.

Open BIM-Based Quality Control for Enhancing the Design Quality in the Architectural Design Phase (건축설계 단계에서 설계품질 향상을 위한 개방형 BIM기반 품질관리 방안)

  • Seo, Jong-Cheol;Kim, Han-Joon;Kim, In-Han
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.3-15
    • /
    • 2012
  • Currently, Building Information Modeling (BIM) is an emerging technological shift that involves applying and maintaining an integral digital representation of all building information for different phases of the project life-cycle. Although BIM has been recognized as a main stream in the construction industry, it is difficult to ensure the quality of BIM data due to the problems such as internal errors of BIM tools and lack of guidelines considering design quality. Such problems give lots of difficulties to BIM adoption for designers, constructors, and owners. Therefore, it is necessary to develop the requirements including the object-oriented modeling method and property definition by applying the Industry Foundation Classes (IFC) which is an ISO/PAS 16739 standard for ensuring the quality of BIM data. This research aims at proposing the requirements considering the quality of BIM data and demonstrating the efficiency of the requirements with using the Solibri Model Checker (SMC) which is a quality control tool in a case study.

Schematic Cost Estimation Method using Case-Based Reasoning: Focusing on Determining Attribute Weight (사례기반추론을 이용한 초기단계 공사비 예측 방법: 속성 가중치 산정을 중심으로)

  • Park, Moon-Seo;Seong, Ki-Hoon;Lee, Hyun-Soo;Ji, Sae-Hyun;Kim, Soo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.22-31
    • /
    • 2010
  • Because the estimated cost at early stage has great influence on decisions of project owner, the importance of early cost estimation is increasing. However, it depends on experience and knowledge of the estimator mainly due to shortage of information. Those tendency developed into case-based reasoning(CBR) method which solves new problems by adapting previous solution to similar past problems. The performance of CBR model is affected by attribute weight, so that its accurate determination is necessary. Previous research utilizes mathematical method or subjective judgement of estimator. In order to improve the problem of previous research, this suggests CBR schematic cost estimation method using genetic algorithm to determine attribute weight. The cost model employs nearest neighbor retrieval for selecting past case. And it estimates the cost of new cases based on cost information of extracted cases. As the result of validation for 17 testing cases, 3.57% of error rate is calculated. This rate is superior to accuracy rate proposed by AACE and the method to determine attribute weight using multiple regression analysis and feature counting. The CBR cost estimation method improve the accuracy by introducing genetic algorithm for attribute weight. Moreover, this makes user understand the problem-solving process easier than other artificial intelligence method, and find solution within short time through case retrieval algorithm.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

A Study of Construction Duration Predicting Method for Mega Project (메가프로젝트 사업초기단계 사업기간 예측 방법에 관한 연구)

  • Woo, Yu-Mi;Lee, Seung-Hoon;Lee, Hei-Duck;Seo, Yuong-Chil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.597-600
    • /
    • 2008
  • Recently, Several Mega project are been performing as a multi-dimensional development project in Korea, but some problem has been revealed about deficiency of the history, experience, and skill. A multi-dimensional development project require the technology which can manage mega project to its specific at the level of program management. predicting schedule and schedule management are the most important for mega project, been performing over several years. This research shows the method of predicting and planning schedule in the early stage as a pre-study on developing a technology of schedule management. First of all, it presents the development of database considering the specific of mega project that can accumulate the history of schedule and search the schedule according to the type of single and multi building. Also it suggests the method of prediction schedule by creating scenarios according to owner requirements and cash flow, affecting schedule management in the early stage, and the shortening possibility of schedule duration using CCPM theory.

  • PDF

A Development of Internet-based Image Management System for Collection of Construction Knowledge (건설 현장지식 수집을 위한 인터넷기반의 이미지관리 시스템 개발)

  • Chin Sangyoon;Shin Tae-Hong;Shin Dongwoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.129-136
    • /
    • 2001
  • Advances in new information technology enable practitioners at construction sites to capture image information on overall sites and various work results through digital cameras. Also more and more government agencies and clients are accepting construction site information in a digital format. This research developed an Internet-based construction image information management system for effective construction management and sharing information among project participants. This system named CiMS provides a way to store/search/share site image information by representing the information through the combination of work items, work areas, performing companies, captured dates and purposes. CiMS has been applied in a real construction project for system refinement and verification. It is expected that CiMS can improve the construction site photo management paradigm, and the contents of CiMS can be incorporated into the corporate knowledge database.