Browse > Article
http://dx.doi.org/10.6106/KJCEM.2012.13.4.003

Open BIM-Based Quality Control for Enhancing the Design Quality in the Architectural Design Phase  

Seo, Jong-Cheol (경희대학교 건축학과)
Kim, Han-Joon (경희대학교 건축학과)
Kim, In-Han (경희대학교 건축학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.13, no.4, 2012 , pp. 3-15 More about this Journal
Abstract
Currently, Building Information Modeling (BIM) is an emerging technological shift that involves applying and maintaining an integral digital representation of all building information for different phases of the project life-cycle. Although BIM has been recognized as a main stream in the construction industry, it is difficult to ensure the quality of BIM data due to the problems such as internal errors of BIM tools and lack of guidelines considering design quality. Such problems give lots of difficulties to BIM adoption for designers, constructors, and owners. Therefore, it is necessary to develop the requirements including the object-oriented modeling method and property definition by applying the Industry Foundation Classes (IFC) which is an ISO/PAS 16739 standard for ensuring the quality of BIM data. This research aims at proposing the requirements considering the quality of BIM data and demonstrating the efficiency of the requirements with using the Solibri Model Checker (SMC) which is a quality control tool in a case study.
Keywords
Design Quality; Quality Control; Open BIM; Solibri Model Checker;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Andreasen, B. S. (2010). "The new ramboll head office." .
2 Autodesk (2011). "Autodesk Navisworks" .
3 Brucker, B. et al. (2006). "Building information modeling (BIM) - a road map for implementation to support MILCON transformation and civil works projects within the U.S. Army Corps of Engineers." U.S. Army Corps of Engineers.
4 BuildingSMART (2011). "International home of OpenBIM." .
5 GSA (2010). "GSA BIM guide series." .
6 Jacobsen, K. et al. (2006). "3D working method 2006/3D CAD manual 2006/layer and object structure 2006/3D project agreement 2006." Bips.
7 Jotne EPM Technology (2010). "BIM Manager MSMLite" .
8 Kiviniemi, A. et al. (2007). "BIM requirements2007-volume 6: quality assurance and merging of models." Senate Properties.
9 Kvarsvik, O. K. (2009). "National museum at Vestbanen architect competition BIM requirements and results." .
10 Project Management Institute. (1996). "A guide to the project management body of knowledge." PMI Standards Committee, 3rd Ed. USA.
11 Smith, S. (2008). "Field BIM at the meadowlands stadium project." .
12 Tekla (2011). "Tekla BIMsight" .
13 정광량(2010). "BIM 설계 사례를 통해 본 문제점과 해결책." 한국건축시공학회지, 10권, 3호, pp. 18-22.
14 송미림.윤수원.진상윤 (2011) "BSC를 기반으로 한 BIM 프로젝트의 만족도 측정에 관한 연구." 한국건설관리학회 논문집, 12권, 4호, pp. 117-129.
15 이주성.문성곤.김주형.김재준 (2009) "건설사업 BIM 활성화 저해 영향요인 도출에 관한 연구." 한국건설관리학회 학술발표대회 논문집, pp. 757-763.
16 조성(2010) "공공 건설프로젝트의 BIM 요구사항과 평가방법에 관한 참여자의 의견조사 연구." 석사학위논문, 연세대학교.