1 |
Andreasen, B. S. (2010). "The new ramboll head office." .
|
2 |
Autodesk (2011). "Autodesk Navisworks" .
|
3 |
Brucker, B. et al. (2006). "Building information modeling (BIM) - a road map for implementation to support MILCON transformation and civil works projects within the U.S. Army Corps of Engineers." U.S. Army Corps of Engineers.
|
4 |
BuildingSMART (2011). "International home of OpenBIM." .
|
5 |
GSA (2010). "GSA BIM guide series." .
|
6 |
Jacobsen, K. et al. (2006). "3D working method 2006/3D CAD manual 2006/layer and object structure 2006/3D project agreement 2006." Bips.
|
7 |
Jotne EPM Technology (2010). "BIM Manager MSMLite" .
|
8 |
Kiviniemi, A. et al. (2007). "BIM requirements2007-volume 6: quality assurance and merging of models." Senate Properties.
|
9 |
Kvarsvik, O. K. (2009). "National museum at Vestbanen architect competition BIM requirements and results." .
|
10 |
Project Management Institute. (1996). "A guide to the project management body of knowledge." PMI Standards Committee, 3rd Ed. USA.
|
11 |
Smith, S. (2008). "Field BIM at the meadowlands stadium project." .
|
12 |
Tekla (2011). "Tekla BIMsight" .
|
13 |
정광량(2010). "BIM 설계 사례를 통해 본 문제점과 해결책." 한국건축시공학회지, 10권, 3호, pp. 18-22.
|
14 |
송미림.윤수원.진상윤 (2011) "BSC를 기반으로 한 BIM 프로젝트의 만족도 측정에 관한 연구." 한국건설관리학회 논문집, 12권, 4호, pp. 117-129.
|
15 |
이주성.문성곤.김주형.김재준 (2009) "건설사업 BIM 활성화 저해 영향요인 도출에 관한 연구." 한국건설관리학회 학술발표대회 논문집, pp. 757-763.
|
16 |
조성(2010) "공공 건설프로젝트의 BIM 요구사항과 평가방법에 관한 참여자의 의견조사 연구." 석사학위논문, 연세대학교.
|