A Study on Improving Pricing Criteria for Post-Construction Evaluation (건설공사 사후평가 용역대가기준 개선방안)

  • Kim, Seok;Lee, Du-Heon;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.8
    • /
    • pp.661-670
    • /
    • 2016
  • In 2000, post-construction evaluation was introduced for the purposes to evaluate demand, cost, and construction period of public construction projects and to reduce errors of public order agencies. However, pricing guide of post-construction evaluation has not been established, which becomes a cause of quality degradation of post-construction service and conflict occurrence. This study suggests the pricing guide in the form of percentage of construction cost method and cost plus fee method based on data of post-construction evaluation. This study investigates the construction costs and service costs for post-construction evaluation and conducts the comparative analysis of 'percentage of construction cost method' and 'cost plus fee method.' The analysis result shows 'cost plus fee method' is more accuracy than 'percentage of construction cost method.' In particular, cost plus fee method includes various correction coefficients, such as distance, area, and integration, in order to reflect the project characteristics of each infrastructure, and suggests linear construction (roads, railways), nonlinear construction I (housing and industry complex), and nonlinear construction II (airports, seaports, dams, water and sewage).

Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk (국내 시공책임형 CM 오픈북 정책 현황 분석을 통한 개선방안)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.3-11
    • /
    • 2016
  • CM at Risk has been introduced in Korea to keep up with the global standards of construction management and provide a higher quality of cm service in line with a rapid change of the construction industry recently. However, it is widely considered that more time would required to settle down the system due to a lack of understanding towards CM at Risk, shortage of reliability and low capability to manage and undertake CM at Risk. Therefore, this research is analyzed problems of contract types, open book policies, and contract conditions of 33 numbers of projects undertaken by a bespoke domestic construction management firm in this research. Moreover, this research is suggested a method to establish an open book policy of CM at Risk aiming a better customers satisfaction through staff training, simplifying and improving a payment system, and a way to settle down an open book policy by improving a performance management system on site. It's expected that this research will contribute to a more competitive system with more dominating the market and a differentiation of the service so as clients to rely more on the CM at Risk.

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.

Conceptual Cost Estimating System Development for Public Apartment Projects (공공아파트 프로젝트 기획단계 공사비 산정시스템 개발)

  • Lee, Hyun-Soo;Lee, Heung-Keun;Park, Moon-Seo;Kim, Soo-Young;Ahn, Jo-Seph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.152-163
    • /
    • 2012
  • At the conceptual phase of a construction project, estimated construction cost is very important as it significantly influences the owner's decision-making. Accurate cost estimating, in the early stage of a public construction project, serves as a critical factor because initial decision-making effects the final cost of a construction project. However in the cases of Korean public apartment projects, excluding a few of the public owners, there is a problem in properly estimating construction cost due to the lack of construction cost estimating system. Thus, this research developed a public apartment cost estimating system using case-based reasoning that was suggested by a previous research with 66 cases of Korean public apartment projects. Based on the system experiments involving 19 public officers and 10 cases of Korean public apartment projects, the effectiveness of the system in terms of estimation accuracy and user-friendly was confirmed. As a result, the developed system has an error range of 1.47% to 13.74% and mean of 6.15%. In addition, the system was evaluated that it could greatly improve the current estimation task of public officers. Consequently, the results of this research can be used as a foundation for a technological advance in estimating construction cost and improving the accuracy and consistency of construction cost estimation.

법령과 고시 ② - 최저가낙찰제가 종합심사낙찰제로 개정

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.306
    • /
    • pp.94-98
    • /
    • 2016
  • 300억원 이상의 국가 및 공공기관 발주공사에 대해 최저가낙찰제를 대신하여 종합심사낙찰제 전면 실시 등의 내용을 담은 국가계약법 시행령이 개정되어 2016년 1월 1일부터 시행에 들어갔다. 종합심사낙찰제는 가격 뿐만 아니라 공사수행능력, 사회적책임을 종합 평가하여 낙찰자를 선정하는 제도로 기존의 최저가낙찰제에서 발생한 덤핑낙찰 및 이로 인한 잦은 계약변경, 부실시공, 저가하도급, 임금체불, 산업재해 증가 등의 문제점을 해소하기 위해 도입된 제도이다. 종합심사낙찰제 도입에 따라 공사 품질이 제고됨으로써 생애주기(lifecycle, 유지보수비용 등을 포함) 측면에서의 재정효율성 제고를 비롯하여 불공정 하도급 관행 개선 등 건설산업의 생태계 개선과 함께 시공결과에 책임짐으로써 기술경쟁 촉진 등 건설산업의 경쟁력 강화 효과도 기대된다. 또한 국가계약예규도 개정되어 주계약자관리방식에 의한 공동계약(주계약자 공동도급)이 최저가낙찰제에서 종합심사낙찰제로 전환됐다.

  • PDF

A Suggestion of a New Rock Mass Classification System (새로운 암반분류법의 제안)

  • Kim, Min-Guon;Lee, Yeong-Saeng
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.11
    • /
    • pp.43-53
    • /
    • 2008
  • The rock mass classification systems used in Korea are not standardized. And also the criteria values differ between agencies. So different opinions for rock mass classification can occur among engineers who participate in each design process. In this research, a new rock mass classification system was suggested to correct these problems. For this purpose, the criteria used in the Korean agencies were compared with the criteria used in foreign agencies and standard criteria were selected. Thereafter rational and objective criteria values were suggested quantitatively for the new classification system.

An Exploratory Research on Quantitative Risk Assessment Methodology Throughout Success Factor Analysis in Project Financing (PF 개발사업의 성공요인 분석을 통한 리스크 평가체계 구축을 위한 기초연구)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.92-102
    • /
    • 2013
  • A Project Financing (PF) is a form of project delivery system that is carried out for the purpose of trying to give help to the development of national economy and the construction industry in order attract private investment. However, in the case of Korea, many PF projects are only taking into account the aspect of maximizing development benefits, and the proliferation of PF results in project failure. In addition, the interruption of business has been one after another in the aftermath of the recent financial crisis. These major cause is the result of efforts to block the potential risk of objectively quantifying operations. Nowadays, PF risk analysis in terms of various factors is insufficient. The purpose of this study is to identify and quantify the extensive risk elements to classify the cause of affecting the success of the project PF study prior to propose a methodology for evaluating the integrity of the project PF based on this and to provide a quantitative system that can evaluate the business risk. This study identified the factors that affect the PF business success and failure and establish the metrics that can be quantified through existing research and expert interviews. Factors influencing the success of the PF obtained as a result of surveys and interviews in assessing the soundness of the PF development conditions in the future be able to take advantage of, as well as an objective assessment tool to be able to take advantage of the development is expected.

Structural and Functional Measurements of a Space Truss Frame for Maintenance Works in Tunnels (터널의 유지보수공사 개선을 위한 가설 스페이스 트러스 프레임의 사용성 및 안정성 평가)

  • Lee, Dong Kyu;Kim, Do Hwan;Kim, Jin Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.92-98
    • /
    • 2012
  • This study shows details of a specific space truss frame structure devised to carry out maintenance and repair temporary works in tunnels. The purpose of this study is to verify structural safety and function of the innovative truss structure through an analysis tool, i.e.. ABAQUS, which is a suite of software application for finite element analysis and computer aided engineering. And then optimized size, i.e., thickness and diameter of truss members is evaluated in practice. In this study, construction methods in the temporary works are additionally represented by using the new space truss frame structure.

A Basis Study on the Integrated System for the Evaluation and Public Announcing System of the Contractor's Construction Capacity (시공능력평가 통합시스템 기반구축에 관한 기초연구)

  • Noh, Jae-Yoon;Jun, Young-Joon;Park, Eun-Soo;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.568-571
    • /
    • 2008
  • To help a owner selecting proper contractors about the specified contract, the Evaluation and Public Announcing System of the Contractor's Construction Capacity has been introduced since 1997. But, the system has been done violence to its original meaning and purpose as time went on. When annually announcing the Contractor's Construction Capacity, especially, there was frequently a large range of opinion on the issues. On that account, MLTM(Ministry of Land, Transport and Maritime Affairs) has had to make a alteration to improve those and is making efforts for a constructive policy now. The purpose of this paper is to conduct a basis study on the Integrated System after reflecting points to be considered about improvements and the current of the times.