• Title/Summary/Keyword: 발주방식 선정기준

Search Result 22, Processing Time 0.022 seconds

A Project Delivery System Selection Model for Large Public Construction Projects (대형 공공공사의 적정 발주방식 선정모델)

  • Hyun Chang-Taek;Seo Yong-Chil;Lee In-Keun;Ryu Kil-Sang;Lee Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.71-80
    • /
    • 2000
  • Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

  • PDF

The Improvement Plan of Project Delivery Systems in the Public Construction Projects (공공건설사업의 발주방식 개선방안)

  • Choi, Eun-A;Kim, Hyun;Park, Sung-Yong;Cho, Hyeong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.509-512
    • /
    • 2008
  • Clients demands have been changed by construction circumstances such as high-technology, mega-projects, and the complexity of construction. Advanced foreign countries have already introduced and applied new project delivery systems(i.e, CM, DB, etc.) to deal with the change of such that. Recently, Korea also launched two new project delivery systems, "Best Value Contracts to which the State is a Party" to provoke the project delivery system, which helps a public owner select a project delivery system appropriate to the project characteristics. Even though government has made his efforts as stated above, some clients have still used those to public construction projects uniformly. That is because there are not a selection criteria of project delivery system for clients. Therefore, this paper proposes the selection criteria of project delivery system based on project types in the public large construction projects.

  • PDF

The Selection Criteria of Delivery Method based on Project Characteristics;focused on the Multi-Housing Projects (프로젝트 특성에 따른 발주방식 선정기준;공동주택 건설 사업을 중심으로)

  • Moon, Hyun-Seok;Cho, Kyu-Man;Hyun, Chang-Teak;Koo, Gyo-Jin;Hong, Tae-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.390-395
    • /
    • 2006
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods (i..e, CM, DB, etc.). However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough project characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the model for selecting criteria of delivery method based on project characteristics in the Multi-housing projects.

  • PDF

AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments (지자체 공공건설사업의 발주방식 선정기준에 관한 연구)

  • Choi, Eun-A;Kim, Byung-Ok;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.111-117
    • /
    • 2009
  • With the current trend in the industry toward increasingly complex, diversified and large construction projects, advanced countries in the construction field have already introduced and applied a variety of methods for placing orders in order to cope with such changes in construction circumstances. In Korea, there have been efforts to continuously improve approaches to placing an order. With the aim of diversifying the methods of Delivery Systems, the "Technical Proposal Type Bid," and the "Design Competition and Technical Proposal Type Bid" were introduced through a revision of Korea's contract law enforcement ordinance. In line with the government's efforts, criteria for a method of placing an order that is suitable for a public construction project should be presented. This study enumerates the current issues using a survey for construction projects already placed and an analysis of the current status, and presents the selection criteria for Delivery Systems by business type as an improvement for the problem.

A Selection Model For Power Plant Project Delivery Method (화력발전소 발주방식 비교를 통한 적정 발주방식 선정 모형)

  • Kim, Sun-Kuk;Park, Jong-Kyoo;Park, Chan-Sik;Son, Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.66-77
    • /
    • 2007
  • With the electricity industry structure reformation of the government in April, 2001, Korea Power Electric Corporation was divided in to Korea water power nuclear power and 5 thermal power plant. After, various delivery method is introduced and applied for active profit creation according to the competition between each development companies for the public company privatization. However, the current situation does not satisfy the project participant by selecting the delivery method without reflecting the business goal and project characteristics of power plant construction business. The objective of this study is to research the influencing factors that should be considered to select the delivery method in thermal power construction business and develop a standard of selection of appropriate delivery method through questionnaire and interviews to establish a model to select the delivery method that fits the business goal of the subject of delivery. In the future, if the delivery method selection model suggested in this study is applied, it is expected to select the appropriate delivery method of power plant construction business by effectively reflecting the business goal, characteristics and demand of the delivery subject, and characteristics of the construction business apart from the existing customary practices that decided the delivery method dependent on the subjective and experience based judgement.

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

A Model for Deciding Evaluation Weights in Design-Build Delivery Method (일괄입찰방식의 적격심사분이별 배점 결정모델 개발)

  • Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.91-100
    • /
    • 2005
  • Design-build that a single entity performs whole construction process under singular responsibility is one of the project delivery system comes to take expectation effects of time savings, cost saving, and quality assurance. On the other hand, a current domestic method for selecting a design-build contractor is difficult to reflect the purpose of owner and the project characteristics when owner selects the design-build contractor. The purpose of this research is to suggest a model for deciding evaluation weights in design-build which can reflect the purpose of owner and the project characteristics. This research can help owner to select the best suitable design-build contractor for the project.

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

A Study of Factors Influencing Delivery Methods Selection on Public Construction Projects (공공공사 발주방식 선정에 영향을 미치는 요인 연구)

  • Kim, Dae-gil;Lee, Ung-Kyun;Lee, Hak-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.218-219
    • /
    • 2014
  • The selection of an appropriate contract method is vital for the successful operation of the project. However, there has been a lack of studies on objective decision making support models for use in the planning stage of a project contract. The present study had the goal of analyzing the factors that influence contract method selection, as an initial study for developing a project contract method selection model. The existing related studies were analyzed, and the factors considered in the literature were selected. Then, based on the findings, the opinions of an expert group on the important factors for contract method selection were collected through a survey. The collected opinions were analyzed using factor analysis, a statistical analysis method. The results will be utilized in the future as preliminary data for developing a decision making model for selecting a contract method.

  • PDF

A Study on the Selection Method of Construction Management based on Public Construction Projects (공공건설사업의 건설사업관리방식 선정 방법에 관한 연구)

  • Kim, Kwan-Su;Park, Hyung-Keun;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.65-73
    • /
    • 2013
  • Even though the construction management (CM) system was introduced for the purpose of increasing the efficiency of the domestic construction industry along with the establishment of construction industry fundamental laws in December of 1996, now it is very difficult that the public institutions can judge their application of construction management methods due to the lack of clear guidelines or directions to select construction management methods when the public institutions were executing public construction projects. Therefore, this study was executed to prepare for the selection criteria which could be referred in reviewing the application of construction management ordering methods according to public institution's competences and project characteristics. It is expected that future domestic demand of construction management will be gradually increasing both in public and private construction sectors. However under the current construction management systems, it is judged to be difficult that the construction projects that apply the construction management methods will be activated with full-scale. Therefore, it could be said that active efforts in domestic sectors are required in order that the construction management systems of developed countries levels could be activated. Additionally in order to vitalize the construction management systems, it is expected that public institutions could use this study results as the review data for feasibility of construction projects for the consignment of construction management in selecting the ordering methods.