The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects  

Moon, Hyun-Seok (서울시립대학교 건축공학과)
Hong, Tae-Hoon (서울시립대학교 건축학부)
Koo, Gyo-Jin (서울시립대학교 건축학부)
Hyun, Chang-Taek (서울시립대학교 건축학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.9, no.3, 2008 , pp. 75-84 More about this Journal
Abstract
Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.
Keywords
Multi-Family Housing; Delivery Method; Impact Factor; Factor Analysis;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Luu, D., Ng, S., and Chen, S. (2005)." Formulating procurement selection criteria through case-based reasoning approach", Journal of Computing in Civil Engineering, ASCE, 19(3), pp.169-276
2 서울시립대학교 (2003). 사업발주방식, 한국엔지니어링진흥협회
3 이상호 (2006). "건설산업의 최고가치 구현수단으로서의 CM", 제2회 CM서울포럼, 한국건설관리학회
4 Alhazmi, T. and McCaffer, R. (2000). "Project Procurement System Selection Model", Journal of Construction Engineering and Management, ASCE, 126(3), pp. 176-184   DOI   ScienceOn
5 Chan, A., Yung, E., Lam, P., Tam, C., and Cheung, S. (2001)." Application of Delphi method in selection of procurement system for construction projects", Construction Management and Economics, 19(7), pp.699-718   DOI
6 Florida Department of Transportation (FLDOT) (2003)." Design Build Program", Florida Department of Transportation Project management, Research & Development Office, Tallahassee, Florida
7 Flad & Associates (1994). Delivery System Selection Matrix : Purpose and Definition, Flad & Associates
8 US Army Corps of Engineers (USACE) (1994). Design-Build Insruction(DBI) For Military Construction, US Army Corps of Engineers
9 Gorden, C. M. (1994). "Choosing Appropriate Construction Contracting Method", Journal of Construction Engineering and Management, ASCE, 120(1), pp. 196-210   DOI   ScienceOn
10 Washington State Department of Transportation (WSDOT) (2004). Guidebook for Design-Build Highway Project Development, Washington State Department of Transportation, Seattle, Washington
11 Mahdi, I. and Alreshaid, K. (2005). "Decision support system for selecting the proper project delivery method using analytical hierarchy process", International Journal of Project Management, 23(7), pp.564-572   DOI   ScienceOn
12 Al-Khalil, M. (2002). "Selecting the appropriate project delivery method using AHP", International Journal of Project Management, 20(6), pp.469-474   DOI   ScienceOn
13 Sanvido, V. and Konchar, M., 1999, Selecting Project Delivery Systems, Project Delivery Institute
14 Masterman, J. (1992). An Introduction to Building Procurements Systems, E & FN SPON
15 김광인 (2000). 국내 대형 공공 건축물공사의 발주방식 선정기준에 관한 연구, 서울시립대학교 석사학위논문
16 서울시립대학교 (2006). 턴키공사방식의 성과평가에 관한 연구, 건설교통부
17 AASHTO (American Association of State Highway and Transportation Officials) (2005). Recommended AASHTO Design-Build Procurement Guide, AASHTO, Washington, DC
18 Cheung, S., Lam, T., Wan, Y., and Lam, K. (2001). "Improving Objectivity in procurement selection", Journal of Management in Engineering, ASCE, 17(3), pp.132-139   DOI   ScienceOn
19 Sanvido, V. E. and Konchar, M. D. (1998). Project Delivery Systems : CM at Risk, Design-Build, Design-Bid-Build, Pennsylvania State University, p. 12
20 Al-Sinan, F. M. (1986). "Evaluation of construction management contracts in development countries", Ph.D thesis, Purdue University
21 Reverio, F. L. (2001). "Project Delivery system selecting : a cased-based reasoning framework", Logistics Information Management, 14(5/6), pp. 367-375   DOI   ScienceOn
22 Ireland, V. (1982). Virtually Meaningless Distintions Between Nominally Different Procurement Methods
23 States of Geogia (SOG) (2003). "Project Delevery Option - Understanding Your Options", Georgia State Financing and Investment Commission, Atlanta, Geogia
24 한국건설산업연구원 (2005). 최근 외국의 입.낙찰제도 운영현황 및 우리나라 입.낙찰제도 개선방안 연구, 재정경제부
25 박성현, 조신섭, 김성수 (2006). Ver. SPSS 12K 한글SPSS, 한나래
26 서용칠 (2003). 대형 공공건설사업의 발주방식 선정모델 개발, 서울시립대학교박사학위논문
27 현창택, 김성일, 조규만 (2005). 대형공공공사 입찰방법 선정기준 개발 연구, 국토연구원
28 Nahapiet, H. and Nahapiet, J. (1985)." A comparison of contractual arrangements for building projects", Construction Management and Economics, 3(3), pp. 219-219
29 Love, P., Skitmore, M., and Earl, G. (1998). "Selecting a suitable procurement method for a building project", Construction Management and Economics, pp.221-233