• Title/Summary/Keyword: 물량 정보

Search Result 248, Processing Time 0.022 seconds

Status of Nuclear Power Plant Decommissioning Cost Analysis in USA (미국의 원전해체 비용평가 기초자료 및 동향 분석)

  • Shin, Sanghwa;Kim, Soonyoung
    • Journal of the Korean Society of Radiology
    • /
    • v.12 no.2
    • /
    • pp.139-148
    • /
    • 2018
  • Assessment of NPP(Nuclear Power Plant) decommissioning cost is very important for safe decommissioning of nuclear power plants. In the United States, which has the most NPP decommissioning experience, the cost evaluation study has been conducted since the 1970s in order to decommissioning nuclear facilities. The US NRC has conducted studies on decommissioning technology, safety and cost for a variety of reactor type and nuclear installations. In the total decommissioning costs, the end of operation licenses accounted for the largest portion, followed by spent fuel management and site restoration. In case of immediate decommissioning, spent fuel management cost increased compared to delayed decommissioning, and delayed deocmmissioning increased the cost of terminating the operation license. However, in general, delayed decommissioning does not show any significant benefit as compared with immediate decommissioning. It is necessary to consider the evaluation according to the site conditions when evaluating the cost of decommissioning domestic nuclear power plants. Also, in Korea, IAEA recommendations were applied to reorganize the radioactive waste classification system. Therefore, it is necessary to develop a method to appropriately use the decommissioning data of the preceding US Nuclear Power Plant in the new classification system when estimating the amount of radioactive waste generated during decommissioning. In particular, the establishment of the evaluation methodology for the waste to be disposed of will be an important factor in securing the accuracy of the decommissioning cost. In addition, it is necessary to construct information data that can be applied to facility characteristics and work characteristics in order to evaluate the cost of demolition of domestic nuclear power plants.

The Study on the Internet-based Virtual Apartment Remodeling and Auto Estimation Simulator (인터넷 기반의 아파트 리모델링 및 자동 내역산출을 위한 시뮬레이터 디자인 연구)

  • 서재은;김성곤
    • Archives of design research
    • /
    • v.15 no.1
    • /
    • pp.191-202
    • /
    • 2002
  • As family types have been diverse, patterns of living and living space became diverse as much as users are. Therefore, it is needed to provide various remodeled design of living space corresponding to changes of users'living patterns, and to provide these remodeling process to users directly on the web. In this paper, use scenario for the Internet-based Virtual Apartment Remodeling Simulator is researched as an export system to remodel space in accordance with users diverse lifestyle paradigm and the website is developed. The study consists of four parts. First, the general concept of remodeling, including the range and types of remodeling, are defined, and the misleading terms in this field are reviewed and organized by secondary research Second, fixed factors and variable factors are differentiated in the complex building for residence and business that was decided as a basic building type in this study. Third, there needed a database for consulting, final material, pre-estimation real estimation for simulation of remodeling. This database was introduced along with floor plan and elevation. Finally, the remodeling simulator is presented by the case study developed on the web. The system structure and use scenario are also presented. In order to present and inspect design alternatives, prototype was produced. The Final simulator was enhanced by defeating problems regarding interface efficiency and missing information of existing online site.

  • PDF

Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge (대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로-)

  • Cho, Ji-Hoon;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.197-201
    • /
    • 2008
  • Conceptual cost estimates for domestic highway projects have generally been conducted using governmental unit-price references. Inaccuracies in governmental unit-price data has repeatedly addressed in the Korean construction industry which often lead to poor decision making and cost management practices. Thus, needs for developing a better way of conceptual cost estimating has been widely recognized. This research is considered as the first step in developing such model using real-world cost data based on actual construction activities. The data analyzed in this paper includes 41 P.S.C (Prestressed Concrete) Box bridges which broke into 4 categories based on construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). Actual design documents; including actual cost estimating documents, drawings and specifications were carefully reviewed to effectively break down cost structures for PSC girder bridges. Among more than 40 cost categories for each P.S.C girder bridge type, 7 of them were identified which accounted for more than 95% of total construction cost (ILM: 99.47%, MSS: 99.22%, FSM: 98.18%, and FCM: 98.12%). In order to validate the clustering of cost categories, the variation of each cost category has been investigated which resulted in between -1.16 % and 0.59%.

  • PDF

A Study on the Improvement of Efficient Execution System for Cadastral Resurvey Project (지적재조사사업의 효율적인 추진체계 개선에 관한 연구)

  • Kim, Jae Myeong;Choi, Yun Soo;Yoon, Ha Su;Kim, Young Dan
    • Spatial Information Research
    • /
    • v.21 no.4
    • /
    • pp.47-62
    • /
    • 2013
  • Recently there are growing arguments about the needs to improve Cadastral Resurvey Projects more efficiently and rationally since the projects have realistically started. This study aims to analysis some problems of the projects and finds out the solutions. With this purpose, we have surveyed some literatures related to the demonstration projects, and then have examined some similar domestic urban development projects and international Cadastral Resurvey Projects in order to apply their appropriate tools to the present or future projects. Generally the execution process of Cadastral Resurvey Projects has four steps and this study arranges the main problems in each steps. In the result it suggests that some improvements should change as the followings. (1) It is more effective to take planning-based approach than project-based one. (2) The project boundary needs to be decided with the rectangular patterns not the irregular ones for the efficient project. (3) The adjusting the current baseline of agreement should be reconsidered because too high baseline may make the project difficult to progress. (4) Not only systematical public relations to promote the projects but also a variety of incentives to induce the public participations is very important to solve the problems of involvement. (5) Institutional tools for collaborate planning is also desirable to solve the conflicts among stakeholders rationally and effectively.

A Study on the Problems in Third-Party Logistics in China (중국 제3자 물류의 문제점에 관한 연구)

  • Choi, Seok-Beom;Park, Geong-Hee
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.1
    • /
    • pp.191-222
    • /
    • 2009
  • The third party logistics is a new developing industry in China and is still in infancy stage. China's third party logistics market only represents 3.39% of the Logistics market in 2006. As international multinational corporations have taken part in China market, they use their current 3PL providers to assist them to deal with the substantial logistics issues that exist in expanding their business activities in China. Traditional 3PL services such as transportation, warehousing and customs clearance are main in China's 3PL market. A variety of domestic laws and regulations on logistics in China prevent 3PL Providers from supplying value-added additional services to their users. Chinese firms have not yet supply high value-added services in China's 3PL logistics market. The purpose of this paper is to contribute the activation of third party logistics in China by analyzing the present situations, and presenting the solutions to problems of Third-Party Logistics in China.

  • PDF

Development of an Application System for Efficient Management of Underground Water Supply Facility - Pilot Study in Chonju City - (상수도 지하시설물의 효율적 관리를 위한 응용시스템 개발 -전주시를 대상으로-)

  • 오권호;진철하;이근상;정승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.2
    • /
    • pp.111-120
    • /
    • 2000
  • Water, waste, electric and gas facilities are urban based facilities that needed in our life and are often located in underground. Therefore, underground facilities are more difficult to manage efficiently than ground facilities. It is needed to carry out survey/probe into underground facilities and to build database in order to prevent city-misfortunes being occurred because of negligent management and in order to minimize budget-waste and a traffic jam according to repetition of road excavation constructions. Also, the development of application system is required to manage efficiently underground facility. Chonju city has launched underground water supply facility computerizing project as a part of National Geographic Information System project until December 1998 and executed survey/probe into 402.89 km water supply that is 80 mm up inside central town area 39.6 $km^2$. Also, chonju city built database into 537 km water supply that is 80 mm below based on water supply card without other survey/probe works. Also, existing work process each department is changed into GIS applied work process and underground water supply facility management system is developed by its work process basis. Water supply underground facility management system that is developed is composed of sub-system like base-map management, water supply inspect, water supply management and water supply inquiry, construction work management, administration management and map management. This research presents the procedure and method of underground water supply facility survey/probe and problem being occurred during survey/probe procedure and also show the functions of each sub-systems composing underground water supply facility management system.

  • PDF

A Study on the Optimization Algorithm for Correlation Analysis of the Underground Utility Structure Density in Urban Areas and Recorded Ground Subsidence (도심지 지중매설물 밀집도와 이력지반함몰의 상관성 분석을 위한 최적화 알고리즘에 관한 연구)

  • Choi, Changho;Kim, Jin-Young;Baek, Sung-Ha;Kang, Jae Mo
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.10
    • /
    • pp.77-87
    • /
    • 2021
  • Several studies have been conducted to analyze, predict, and prevent the risk of ground subsidence occurring in urban areas. Nevertheless, there is insufficient research effort on risk analysis that utilizes the correlation between the density of underground structures (i.e., the spatial quantity of buried objects installed in the ground around the interested area) and the occurrence of ground subsidence. In this paper, a study was conducted to analyze the line density of underground structures using GIS-based spatial information data, and to link this with the recorded ground subsidences. An optimization algorithm was developed to maximize the correlation between the line density of 29 recorded ground subsidences and 6 types of underground structures that occurred between 2010 and 2015 for the analysis area. The concept of normalized line density was also proposed for the analysis. The normalized line density of the analysis area was divided into five grades (Grade 1: lowest, Grade 5: highest). When the optimization algorithm was applied, the case where the normalized line density was Grade 4 or higher at the location of the recorded ground subsidences was about > 80%. It is thought that the density analysis result of underground facilities can be applied to the ground subsidence risk analysis by using the proposed optimization algorithm.

Analysis on Barriers and Resolution Priority of Sea-Rail Multimodal Logistics among Korea and Eurasia Nations (한국-유라시아간 해륙복합운송 문제점 및 해결 우선순위 분석)

  • Lee, Eon-Kyung;Lee, Suyoung;Kim, Bokyung;Euh, Seungseob
    • Journal of Korea Port Economic Association
    • /
    • v.35 no.2
    • /
    • pp.109-126
    • /
    • 2019
  • The Panmunjom Declaration adopted by the leaders of South and North Korea on April 27, 2018, has created an environment conducive for peace and cooperation in the Korean Peninsula. In the June of last year, South Korea has joined the Organization for Cooperation between Railways (OSJD). The membership of OSJD has established a solid foundation for restoring a multimodal logistics system that connects the Korean peninsula to Eurasia countries, including China and Russia. In this paper, a questionnaire survey targeting working-level experts was conducted to find the barriers in constructing multimodal logistics that efficiently connect the port-continental railways of the Korean peninsula and the Eurasian nations. Survey items were divided into five categories-border crossing procedures, technology, facilities, operation, and government support. As a result, among the most important problems of international multimodal logistics in Eurasia that need to be solved on priority include improving transshipment facilities, eliminating inspection carried out at every country for transit, simplifying documents for customs clearance, and minimizing the changes in freight rates. In conclusion, for vitalizing the connection between the Korean peninsula and the continental railways, it is necessary to develop a transshipment system to facilitate the changes in tracks at the borders by making a joint effort with the international community. Second, railway and operational systems in South Korea, North Korea, China, and Russia should be standardized. Third, international cooperation among South Korea, North Korea, China, and Russia is essential for simplifying customs clearance at borders, priority departure of domestic cargo, sharing information about the changes in freight rates, and so on. Finally, the government should come up with measures to secure the quantity of cargo required to form block trains, while developing new business models.

Scaling up of single fracture using a spectral analysis and computation of its permeability coefficient (스펙트럼 분석을 응용한 단일 균열 규모확장과 투수계수 산정)

  • 채병곤
    • The Journal of Engineering Geology
    • /
    • v.14 no.1
    • /
    • pp.29-46
    • /
    • 2004
  • It is important to identify geometries of fracture that act as a conduit of fluid flow for characterization of ground water flow in fractured rock. Fracture geometries control hydraulic conductivity and stream lines in a rock mass. However, we have difficulties to acquire whole geometric data of fractures in a field scale because of discontinuous distribution of outcrops and impossibility of continuous collecting of subsurface data. Therefore, it is needed to develop a method to describe whole feature of a target fracture geometry. This study suggests a new approach to develop a method to characterize on the whole feature of a target fracture geometry based on the Fourier transform. After sampling of specimens along a target fracture from borehole cores, effective frequencies among roughness components were selected by the Fourier transform on each specimen. Then, the selected effective frequencies were averaged on each frequency. Because the averaged spectrum includes all the frequency profiles of each specimen, it shows the representative components of the fracture roughness of the target fracture. The inverse Fourier transform is conducted to reconstruct an averaged whole roughness feature after low pass filtering. The reconstructed roughness feature also shows the representative roughness of the target subsurface fracture including the geometrical characteristics of each specimen. It also means that overall roughness feature by scaling up of a fracture. In order to identify the characteristics of permeability coefficients along the target fracture, fracture models were constructed based on the reconstructed roughness feature. The computation of permeability coefficient was performed by the homogenization analysis that can calculate accurate permeability coefficients with full consideration of fracture geometry. The results show a range between $10^{-4}{\;}and{\;}10^{-3}{\;}cm/sec$, indicating reasonable values of permeability coefficient along a large fracture. This approach will be effectively applied to the analysis of permeability characteristics along a large fracture as well as identification of the whole feature of a fracture in a field scale.

A Study on the Effect of the Bidding Stage Factors of Logistics Outsourcing Service on Trust, Cooperation and Service Satisfaction (물류아웃소싱 서비스의 입찰단계 요인이 신뢰, 협력 및 서비스 만족도에 미치는 영향에 관한 연구)

  • Lee, Nam-Seung;Song, Sang-Hwa
    • Journal of Korea Port Economic Association
    • /
    • v.36 no.2
    • /
    • pp.19-36
    • /
    • 2020
  • The bidding phase for logistics outsourcing services is critical for both shippers and logistics companies. According to the logistics bidding phase, the shipper should provide logistics operation information to logistics companies to resolve uncertainty. In addition, the logistics company can win the contract volume that was placed in the bid by expressing their experience and know-how, and proposing to share the risks and benefits of the shipper's logistics operation. Therefore, it is necessary to examine the factors that can be identified during the bidding phase for logistics outsourcing and how these factors affect the satisfaction of logistics outsourcing services. Based on the factors identified in the preceding studies on logistics outsourcing partnership factors and those on logistics outsourcing determinants, a survey was conducted on experts engaged in logistics companies, performing logistics for domestic shippers and analyzed using Smart-PLS. This study presents the following implications. First, in the logistics bidding phase, the shipper should provide its logistics operation information to logistics firms to resolve uncertainties. Details An in-depth explanation of the operation details will be presented via the bidding presentation, and on-site tours of manufacturing plants and logistics centers should also be carried out if necessary. Second, in the bidding phase, logistics companies should appeal through proposals to their competitiveness, such as experience and knowledge of the logistics of the shipper, and also consider alliances with other logistics companies to supplement their insufficient logistics services. Third, logistics companies should make proposals to share profits and risks through logistics outsourcing during the bidding phase, propose accepting risks from environmental uncertainties of the shipper within its capacity to an acceptable extent, and share the benefits of carrying out the shipper's logistics.