Status of Nuclear Power Plant Decommissioning Cost Analysis in USA  

Shin, Sanghwa (Department of Radiological Science, Catholic University of Pusan)
Kim, Soonyoung (Radiation Core Technologies, Co., Ltd.)
Publication Information
Journal of the Korean Society of Radiology / v.12, no.2, 2018 , pp. 139-148 More about this Journal
Abstract
Assessment of NPP(Nuclear Power Plant) decommissioning cost is very important for safe decommissioning of nuclear power plants. In the United States, which has the most NPP decommissioning experience, the cost evaluation study has been conducted since the 1970s in order to decommissioning nuclear facilities. The US NRC has conducted studies on decommissioning technology, safety and cost for a variety of reactor type and nuclear installations. In the total decommissioning costs, the end of operation licenses accounted for the largest portion, followed by spent fuel management and site restoration. In case of immediate decommissioning, spent fuel management cost increased compared to delayed decommissioning, and delayed deocmmissioning increased the cost of terminating the operation license. However, in general, delayed decommissioning does not show any significant benefit as compared with immediate decommissioning. It is necessary to consider the evaluation according to the site conditions when evaluating the cost of decommissioning domestic nuclear power plants. Also, in Korea, IAEA recommendations were applied to reorganize the radioactive waste classification system. Therefore, it is necessary to develop a method to appropriately use the decommissioning data of the preceding US Nuclear Power Plant in the new classification system when estimating the amount of radioactive waste generated during decommissioning. In particular, the establishment of the evaluation methodology for the waste to be disposed of will be an important factor in securing the accuracy of the decommissioning cost. In addition, it is necessary to construct information data that can be applied to facility characteristics and work characteristics in order to evaluate the cost of demolition of domestic nuclear power plants.
Keywords
Nuclear Power Plant; Radioactive waste; Decommissioning; Cost;
Citations & Related Records
연도 인용수 순위
  • Reference
1 R.I. Smith, G J. Konzek, and W.E. Kennedy, Jr., "Technology, Safety and Costs of Decommissioning a Reference Pressurized-Water Reactor Power Station", NUREG/CR-0130 (Prepared for the U.S. NRC by Pacific Northwest Laboratory, Richland, Washington), 1978. 6 (Addendum 1, July 1979; Addendum 2, July 1983; Addendum 3, September 1984; Addendum 4, July 1988)
2 ENERGY SOLUTIONS, "2014 Decommissioning Cost Analysis of the San Onofre Nuclear Generating Station Unit 2&3", Document No. 164001-DCE-001
3 G.J. Konzek et al., "Revised Analyses of Decommissioning for the Reference Pressurized-Water Reactor Power Station", NUREG/CR-5884 (Prepared for the U.S. NRC by Pacific Northwest Laboratory, Richland, Washington), 1995. 11
4 Energy Nuclear Operations, Inc., "Update to Decommissioning Funding Status Report Vermont Yankee Nuclear Power Station", BVY14-082, 2014. 12
5 U.S. Nuclear Regulatory Commission, "Decommissioning of Nuclear Power Reactor", Regulatory Guide 1.184, 2013. 8
6 U.S. Code of Federal Regulations 10CFR50.75, "Reporting and recordkeeping for decommissioning planning", Office of the Federal Register National Archives and Records Administration
7 U.S. Nuclear Regulatory Commission, "Report on Waste Disposal Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities", NUREG-1307, Revision 15, 2013. 1
8 U.S. Nuclear Regulatory Commission, "Summary Findings Resulting from the Staff Review of the 2015 Decommissioning Funding Status Reports for Operating Power Reactor Licensees", SECY-15-0122, 2015. 09
9 TLG Services Inc., "Decommissioning Cost Analysis for the Wolf Creek Generating Station", W11-1598-002, Rev. 0 , 2008. 8
10 TLG Services Inc., "Decommissioning Cost Analysis for the Wolf Creek Generating Station", W11-1642-001, Rev. 0 , 2011. 8
11 TLG Services Inc., "Decommissioning Cost Analysis for the Crystal River Nuclear Plant Unit 3", P23-1697-002, Rev. 0, 2008. 10
12 TLG Services Inc., "Decommissioning Cost Analysis for the Crystal River Unit 3 Nuclear Generating Plant", P23-1680-001, Rev. 0, 2013. 12
13 TLG Services, Inc. "Decommissioning Cost Analysis for the Callaway Plant", A22-1599-002, Rev. 0, 2008. 8
14 TLG Services Inc., "Decommissioning Cost Analysis for the Callaway Energy Center", A22-1644-001, Rev. 0, 2011. 8