Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm (유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발)

  • Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.54-64
    • /
    • 2015
  • The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit (모듈러 경제성 확보를 위한 공장생산 프로세스의 다기능공 적용 방안)

  • Kim, Hakcheol;Hwang, Youngkyu;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.11-19
    • /
    • 2014
  • The Construction industry is a labor-intensive industry that its labor cost takes up about 30~40% out of the whole construction cost. However, due to a stereotype that on-site work is a 3D job there is a shortage of the labor forces. Modular construction method is to produce modular units in the plant so that workers could work stably. Also, after delivering the module from plant to the site, there will be only installment to be required that shortens construction duration. Even though the modular market is currently expanding based on military facilities in Korea, its best strengths are not demonstrated well which are shortened construction period and low cost. It also causes labor problem of production due to minimum utilization of the modular construction method. Multi-skilled labor means a technician that is able to perform more than two kinds of work with more than two techniques. Multi-skilled labor can proceed smoothly by figuring out the connectivity between the precedent and following operations. Therefore, this research is to apply the concept of Multi-skilled labors, suggest solutions and allocate manpowers efficiently. As a result, it helps to decrease idle manpowers during the operation and the total labor forces can be saved. Low cost is the original strength of the modular which can stand out so the modular market is expected to expand.

Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase (대규모 모듈러 건축 프로젝트 현장 시공 시 공장 생산량 및 현장 시공량 관리 모델)

  • Choi, Onekyu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.43-53
    • /
    • 2018
  • Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.

An Economic Analysis of Steel Framed Modular Housing: Compared with Case of Urban Type Living Housing of Wall-slab (강재 프레임 주택형 모듈러의 경제성 분석: 벽식구조인 도시생활형주택과의 사례비교를 통해)

  • Bang, Jong-Dae;Chun, Chu-Young;Park, Ji-Young;Kim, Jong-Yeob;Kim, Gap-Deug;Chun, Young-Soo
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.305-314
    • /
    • 2014
  • The technology-intensive unit modular method of factory production method is attracting attention by the limit of the labor-intensive and field centered wet construction method. In recent years, the unit modular method has been applied to the construction of schoolhouse and BOQ(bachelor offices' quarters), dormitories, etc. But the modular method still is not used in housing construction by the lack of verification of resident performance and construction cost. Therefore, this study analyzed the economics of modular house to vitalize the constructed residential building by modular method and to develop the modular method. According to the study results, the construction cost of the modular house was analysed more about 6.2% expensive than that of the existing housing. However, if the construction duration of modular house is shortened or the productivity of modular house is increased, the construction cost of modular house will be similar to the that of the existing house.

To Improve Production Process of the Modular Using the Conveyor System (모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 -)

  • Bae, Byung-Yoon;Kim, Kyung-Rai;Cha, Hee-Sung;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.103-112
    • /
    • 2012
  • Republic of Korea is recently becoming an advanced country with increasing standard of living. This is causing a lack of employment in the construction industry because of high labor costs and it is resulting rapid increase in foreign labors. Modular Method of Construction can be defined as 50%~90% of the entire process is completed in factory, and transferred to construction field to install. The main purpose of this process is to minimize the entire process that possibly can be done at construction field in order to maximize the quality. The current local usage of Modular Method of Construction started at Shin Ki Elementary School during 2003 and it is widely used for military facilities. It should be used more because it has strengths of spending short time period to complete and low production costs. It can make a change if Modular Method of Construction is applied. Toyota is currently producing vehicle with conveyor system and if Modular Method of Construction is applied, then it is possible to reduce the waste of labor, and automatic production time. Expansion of the modular Market can be expected by applying this method because it will improve producing costs, high quality, and enforced process. This research tried to solve the problem of factory's manufacturing production by applying local Modular Method of Construction to provide suggestions and analyze the profitability with applied conveyor system. It is depending on produced model, but this research's model will take 20 months including assessment of payback period.

Proposal of PC Core System for Modular Housing (모듈러주택 적용을 위한 PC코어 시스템 제안)

  • Minjun, Kim
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.115-122
    • /
    • 2023
  • Modular construction is popular as a smart building system because it can shorten the construction period. This study proposed a precast concrete (PC) core system that can further shorten modular construction time. The system was developed and its structural performance was verified through computational analysis. The proposed PC core system is a complete PC construction method using dry bonding. The results of the study indicated that the proposed PC core system has structural stability and performance suitable for modular housing.

Considerations in the early stage of Designing the Unit Modular Building (유닛모듈러 건축물의 설계 초기 단계에서의 고려 사항)

  • Lee, Young-Ho;Lee, Du-Heon;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.133-142
    • /
    • 2012
  • With the recent changes in building environments such as low-carbon green growth, there have been increasing demands for the new building system that is eco-friendly and can maximize efficiency such as the unit modular system. For the unit modular system, more than 80% of the whole process is carried out in the factory while in the field, mostly unit module assembling and finish work are done. Thus, the quality at the pre-construction stage when design and manufacturing are done determines the quality of the building as a whole. In the country, the unit modular method was first applied in 2003 to school buildings and has gradually expanded afterwards, but due to the lack of examples and related information as well as the small scale of modular manufacturers, its characteristics have not been sufficiently reflected in design, manufacturing and field constructions. This study, as an attempt to improve the design quality of unit modular buildings, points to the problem in manufacturing and field construction, compares and analyzes its causes, and suggests major points to be considered in the early stage of designing the unit modular buildings.

Flexible Unit Floor Plan of a Modular House Considering the Production System (생산 시스템을 고려한 모듈러주택의 가변형 평면계획 연구)

  • Lee, Ji-Eun
    • Land and Housing Review
    • /
    • v.12 no.3
    • /
    • pp.67-78
    • /
    • 2021
  • After World War II, modular housing was developed as a means of quickly and efficiently meeting the housing supply demand. For the past 30 plus years, efforts have been made to improve modular housing in South Korea and to increase their competitiveness in the housing market. This study investigated modular houses based on a steel framed rahem structure which provides a flexible floor plan where walls are easily reconfigured to create rooms of various sizes and functions. Similar to the factory production methods used in the automotive industry, the modular housing industry can also benefit by standardizing such aspects as building components, manufacturing and construction methods, materials, process management, and floor plans. This study examined the feasibility of using a 3m × 3m module for developing various floor plans which are easy to produce and transport. Each 3m × 3m module can be configured to meet different living needs resulting in a complete home when multiple modules are connected. The module configurations can be varied to meet ground transportation and crane limitations. This study found that a 3m × 3m steel framed modular unit is a promising step towards providing residents with plans that meet their living preferences while improving and increasing the supply of modular houses.

Factory Production Management of Modular Units Using MFD 2019 (MFD 2019를 활용한 모듈러 유닛의 공장생산 관리)

  • Lee, Doo-Yong;Nam, Sung-Hoon;Lee, Jae-Sub;Jung, Dam-I;Kim, Kyoung-rai;Cho, Bong-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.6
    • /
    • pp.139-146
    • /
    • 2019
  • The modular building system is a type of prefabricated construction method, and is an industrialized building system that transports, assembles, and completes a three-dimensional module manufactured in a factory to the site. The economics of a modular building system where 50 to 80% of the entire process takes place in a modular factory is dominated by productivity of the factory manufacturing process. Since the building of the module is finished by the combination of unit parts produced by each material, it is necessary to manage the process in each module unit. However, currently marketed process control programs do not reflect the features of these modular methods. In this paper, we introduce Modular Factory Design software(MFD 2019) that can make modular unit production plan which reflects production base(modular factory) and production target(application and number of modular units). In order to verify software compatibility and reliability, two production plans with different production methods were formulated and simulated.