1 |
Kim, K. and Lee H. (2003). "Skill Grouping for Utilizing Multiskilled Labor in Building Construction", Journal of Architectural institute of Korea, CAK, 19(11), pp. 215-222.
과학기술학회마을
|
2 |
Kim, W. (2012). "A Study on Energy Consumption and Emission of Modular Construction Method : Focused on the Comparison with Alternative Methods for Suburban Housing", Ajou university 77ster's thesis.
|
3 |
Kim, K., Yu, J., and Lee H. (2002). "A Conceptual Approach for Productivity Improvement in Construction Using Multi-Skilled Labor" journal of Architectural institute of Korea, CAK, 18(7), pp. 163-170.
과학기술학회마을
|
4 |
Bae, B., Kim, K., Cha, H. and Shin D. (2012). "To Improve Production Process of the Modular Using the Conveyor System" Korean journal of Construction Engineering and Management, KICEM, 13(5), pp. 103-112.
과학기술학회마을
DOI
|
5 |
Lee, K., Kim, K., Shin, D. and Cha H. (2011). "A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation", Korean journal of Construction Engineering and Management, KICEM, 12(6), pp. 14-19.
DOI
ScienceOn
|
6 |
Jorge A. Castaneda, Richard L. Tucker, Carl T. Haas (2005). "Workers' Skills and Receptiveness to Operate Under the Tier II Construction Management Strategy", ASCE, Journal of Construction Engineering and Management 131(7), pp. 799-807.
DOI
|
7 |
Jorge E. Gomar, Carl T. Haas, David P. Morton (2002). "Assignment and Allocation Optimization of Partially Multiskilled Workforce", ASCE, Journal of Construction Engineering and Management, 128(2), pp. 103-109.
DOI
ScienceOn
|