Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm  

Kim, Minjung (Department of Architecture & Architectural Engineering, Seoul National University)
Park, Moonseo (Department of Architecture & Architectural Engineering, Seoul National University)
Lee, Hyun-soo (Department of Architecture & Architectural Engineering, Seoul National University)
Lee, Jeonghoon (Department of Architecture, Seoul National University)
Lee, Kwang-Pyo (Department of Architecture & Architectural Engineering, Seoul National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.16, no.5, 2015 , pp. 54-64 More about this Journal
Abstract
The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.
Keywords
Modular construction; Modular Unit; Multi Project; Factory Scheduling; Genetic-Algorithm(GA);
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Alvanchi, Reza Azimi, SangHyun Lee, Simaan M. AbouRizk, Paul Zubick. (2011). "Off-site construction planning using discrete event simulation", J. Archit. Eng. 18. pp. 114-122.
2 Gilberto C. Pereira, Marilia M. F. de Oliveira*, Nelson F. F. Ebecken. (2013). "Genetic Optimization of Artificial Neural Networks to Forecast Virioplankton Abundance from Cytometric Data", Journal of Intelligent Learning Systems and Applications, 5(1).
3 Goncalves, J. F., Mendes, J. J. M., and Resende, M. G. C. (2008). "A genetic algorithm for the resource constrained multi-project scheduling problem." Eur. J. Oper. Res., 189(3), pp. 1171-1190.   DOI   ScienceOn
4 Hammad, A. A., Salem, O., Hastak, M., and Syal, M. (2008). "Decision support system for manufactured housing facility layout.", J. Arcit. Eng., 14(2), pp. 36-46.   DOI   ScienceOn
5 Hosein Taghaddos, Ulrich Hermann, Simaan AbouRizk, Yasser Mohamed. (2014). "Simulation based multiagent approach for scheduling modular construction", J. Comput. Civ. Eng., 28, pp. 263-274.   DOI
6 Jeong,J. G., Hastak, M., and Syal,M. (2006). "Supply chain simulation modelling for the manufactured housing industry." J. Urban Plann. Dev., 132(4), pp. 217-225.   DOI   ScienceOn
7 J. Holland. (1992). "Adaptation in Nature and Artificial Systems." MIT Press.
8 Kang, Sung-O. (2007). "A Study on the process analysis and setting up normal duration of Large scale military modular building.", MS thesis, Mokwon University, Korea.
9 Kelly, J. E., and Walker, M. R. (1959). "Critical path planning and scheduling." Proc. Of the Eastern Joint Computer Conference, Dec., pp. 160-173.
10 Kim, D., Kim, K., Cha, H., Shin, D. (2013). "A Study on the Strategy for Creating Demand of Modular Construction through Case Analysis by Building Type." Korean journal of Construction Engineering and Management, KICEM, 14(5), pp. 164-174.   DOI
11 Kim, H., Hwang, Y., Kim, K. (2014). "Study on the application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit." Korean journal of Construction Engineering and Management, KICEM, 15(1), pp. 11-19.   DOI
12 Kim, Jung Kyeong. (2014). "Improvement plan of modular plant production process for residential buildings.", MS thesis, University of Seoul, Korea.
13 Kim, Jae-young, Lee, Jong-kuk. (2014). "A Basic Study on the Application of Modular Construction . Focused on the Analysis of Case Study -", Journal of the Korean Housing Association, 25(4), pp. 39-46.   DOI
14 Kumanan, S., Jegan Jose, G., Raja, K. (2006). "Multi-project scheduling using an heuristic and a genetic algorithm." Int. J. Adv. Manuf. Technol., 31(3-4), pp. 360-366.   DOI
15 M. Gen, R. Cheng, and L. Lin. (2008). "Network Models and Optimization: Multiobjective Genetic Algorithm Approach.", Springer.
16 M. Moghadam, M. Al-Hussein, S. Al-Jibouri, A. Telyas. (2012). "Post simulation visualization model for effective scheduling of modular building construction", Can. J. Civ. Eng., 39, pp. 1053-1061.   DOI   ScienceOn
17 Meyer, L, and Shaffer, R. (1963). "Extensions of the critical path method through the application of integer programming." University of Illinois, Urbana, 111, July.
18 Nasereddin, M., M. Mullens, and D. Cope. (2007). Automated simulator development : A strategy for modeling modular housing production. Automation in Construction, 6(2), pp. 212-223.
19 Mohamed, Y., Borrego, D., Francisco, L., Al-Hussein, M., Abourizk, S., and Hermann, U. (2007). "Simulation-based scheduling of module assembly yards: Case study." Eng., Constr. Archit. Manage., 14(3), pp. 293-311.   DOI   ScienceOn
20 Mohsen, O.M., Knytl, P.J., Abdulaal, B., Olearczyk, J., and Mohamed, A.-H. (2008). "Simulation of modular building construction." Proc., Winter Simulation Conf., IEEE, Piscataway, NJ, pp. 2471-2478.
21 Noh, hong woo. (2008). "Process Planning and Scheduling in Job Shop with Multiple Work Centers." MS thesis, Soongsil University, Korea.
22 Odeh, A. M. (1992). "CIPROS: knowledge-based construction integrated project and process planning simulation system.", PhD thesis, University of Michigan, Ann Arbor, MI.
23 Oguz, O., and Bala, H. (1994). "A comparative study of computational procedures for the resource constrained project scheduling problem." Eur. J. Oper. Res., 72(2), pp. 406-416.   DOI   ScienceOn
24 Park, Jae sik, (2007). A Study of the Modular System of Construction to Build Defense Bachelor Officers' Quarters, PhD thesis, Mokwon University, Korea.
25 Payne, J.H. (1995). Management of multiple simultaneous projects: a state-of-the- art review. International Journal of Project Management, 13(3), pp. 163-168.   DOI   ScienceOn
26 Robinson, R. (1975). "A dynamic programming solution to cost time tradeoff for cpm." Mgmt Sci., 22(2), pp. 158-166.   DOI   ScienceOn
27 R.M. Lawson and R.G. Ogden. (2008). "'Hybrid' light steel panel and modular systems", Thin-Walled Structures, 46(7-9), pp. 720-730.   DOI   ScienceOn
28 Yu, H., M. Al-Hussein, and R. Nasseri. (2007). Process Flowcharting and Simulation of house structure components production process. Proceedings of 2007 Winter Simulation Conference, S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R.R. Barton, pp. 2066-2072.
29 Seren Ozmehmet Tasan. (2008). "A Priority-based Genetic Algorithm Approach for Solving Multiple Alternative Project Scheduling Problems with Resource Constraints and Variable Activity Times." International Conference on Systems, Man and Cybernetics, IEEE, pp. 2537-2542.
30 Taghaddos, H., AbouRizk, S. M., Mohamed, Y., and Hermann, R. (2009). "Integrated simulation-based scheduling for module assembly yard." Proc. Construction Research Congress 2009, ASCE, Reston, VA, pp. 1270-1279.