• Title/Summary/Keyword: 린 설계

Search Result 72, Processing Time 0.029 seconds

Application of Lean Theory to BIM-Based Coordination - A Case Study on Process Re-Engineering of MEP Coordination - (린 기법의 BIM 기반 설계조율 프로세스 접목 - 설비전기 설계조율 프로세스 재설계 사례연구 -)

  • Jang, Se-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.67-79
    • /
    • 2018
  • This paper provides theoretical deformation of lean concept and its application for usage of building information modeling (BIM) process. Recently, much research is focused on application of lean concept for more efficient usage of BIM. The lean theory and its basic function and feature is based on manufacturing industry. The manufacturing process can be improved by process re-engineering steps of lean concept which consist of the steps of value, value stream, flow, pull, perfection. However manufacturing process and construction process has different characteristics. Due to the differences, five steps of the traditional lean's process re-engineering can't be directly applied to the BIM based engineering process. In order to solve this problem, we conduct analysis on the characteristics of the manufacturing process and BIM based engineering. We propose modified and expanded concept of lean for process re-engineering and the modified theory was applied to the mechanical, electrical and plumbing (MEP) coordination process. Through the proposed 8 steps of methodology, 2D based process was changed to integrated and using BIM based MEP coordination process. In addition, the results showed the potentiality of cost reduction and process improvement. The results of this study can be a foundation for the theoretical combination of lean and a variety part of construction engineering process.

A Study on the Application Methodology of Set-based Design Approach of Outrigger System based on Lean Process (린 프로세스 기반 아웃리거 시스템의 Set-based Design 적용 방안에 관한 연구)

  • Lee, Seung-Il;Cho, Young-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.50-58
    • /
    • 2011
  • Lean concept is management philosophy that defines a customer's value and eliminates wasteful and impeditive factors. Management philosophy of Lean in the construction industry is referred to as "Lean Construction". Now this concept has expanded to achieve effective productivity during the design phase. Currently the norm of the domestic design process has been Point-based Design(PBD). It involves selecting a single structurally-feasible design option early and then refining that single design as more information becomes available throughout the design process. This single design is then re-worked until a solution is found that is feasible for all parties. On the contrary, Set-based Design(SBD) is based on lean processes to eliminate waste and improve project productivity. It focuses on keeping the design space as open as long as possible, to allow "subdesign" to advance and not labeling them as secondary in importance. Preserving the maximum number of feasible designs as long as possible reduces the likelihood that rework will be necessary and allows all project participants to utilize their unique expertise to make the project successful. This study proposes that the design methodology of minimizing waste and increasing productivity through SBD of AHP, one of the decision making process so as to compare PBD with SBD and tries to find decision making process and then suggest that application methodology through performs case study of SBD process.

A Study on Preconstruction Process in Support of Lean Project Delivery System - Case Study of Children's Hospital at Bellevue, Wa, U.S.A. - (린 건설 관리 방식의 공사 전 설계 진행에 관한 연구 -미국 벨뷰 어린이 병원 사례 조사-)

  • Kim, Yong-Woo;Kim, Kwang-Ho
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.14 no.4
    • /
    • pp.47-54
    • /
    • 2008
  • Preconstruction process in a lean project delivery system was studied in one large healthcare project working for a general contractor. Researchers joined a new lean delivery project for approximately six weeks and participated in preconstruction process including design coordination, management coordination, and target costing while concurrently interviewing other project participants and employees, recording activity in meetings, and otherwise observing the process. The preconstruction process in lean project delivery system, called integrated project design, showed many benefits such as brining expertise of downstream players (i.e., mechanical and electrical contractors) into the design phase. However, lack of leadership and lack of design-integrator blocked the successful application of a new concept of design process.

  • PDF

Effects of Taurine Supplementation on Growth Peformance, Backfat Thickness and Cholesterol and Taurine Concentrations in Finishing Pigs (식이내 타우린 첨가가 비육돈의 성장, 등지방두께, 체내 콜레스테롤 및 타우린 농도에 미치는 영향)

  • 홍종욱;김인호;권오석;김지훈;이지훈;민병준;이원백;임미형;최수정
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.32 no.4
    • /
    • pp.598-602
    • /
    • 2003
  • The purpose of the this experiment was to evaluate taurine supplementation on growth performance backfat thickness and cholesterol and taurine concentrations in finishing pigs. A total of forty eight pigs (71.11$\pm$0.14kg initial body weight) were used in a growth assay. The control diet (CON) was corn-soybean meal based diet, whereas the other dietary treatments were supplemented by additional 0.3 and 0.6% of taurine into the control diet (TAU 0.3 and TAU 0.6, respectively). As the addition of taurine in the diets increased average daily weight gain (Quadratic effect, p<0.05) and gain/feed (Quadratic effect p<0.02) were improved. Total - cholesterol concentrations of serum (Linear effect, p<0.04) and liver (Linear effect, p<0.01) decreased with increasing taurine. As the addition of taurine in the diets increased taurine concentrations of plasma (Linear effect, p<0.01), liver (Linear effect, p<0.01) and boston butt (Linear effect, p<0.01) were increased. In conclusion, finishing pigs fed the dietary taurine had improved growth ratio and decreased total-cholesterol concentrations of serum and liver. Also, finishing pigs fed the dietary taurine had increased taurine concentrations of plasma and boston butt.

Web-based Distributed Lean Construction Information System;Development of System Prototype (웹 기반 분산형 린건설 정보시스템 개발;시스템 프로토타입 개발)

  • Park, Moon-Seo;Yoon, You-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.182-189
    • /
    • 2007
  • To reform and improve the productivity of construction industry, 1) it should be encouraged to improve the construction production process and 2) it is required to enhance reliability of construction information based on the systematic thinking process. To promote the information reliability created during construction production process, Lean Construction Research Center(LRC2) is developing a supporting system to improve design/material supply/schedule management, functioning to efficiently manage the information created at construction production processes and developing a web based construction information system that provides result management/decision making support/knowledge based information services.

  • PDF

A suggestion of in-depth interview guidelines using generative AI services for lean startups (린 스타트업을 위한 생성형 AI 서비스 활용 심층 인터뷰 가이드라인 제안)

  • Lee Soobin;Jung Young-Wook
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.2
    • /
    • pp.471-485
    • /
    • 2024
  • This study explores the effective utilization of generative AI for conducting in-depth interviews within the lean startup environment. With recent technological advancements, the application of generative AI in enhancing operational productivity has been on the rise across various organizations, and this trend extends to the lean startup milieu. The research develops specific guidelines and a guidebook aimed at assisting practitioners in lean startups to conduct in-depth interviews using AI, even amidst the constraints of limited time and capital. The proposed guidebook facilitates practitioners to swiftly design and conduct interviews, thereby promoting an agile and flexible working environment within lean startups. Moreover, this study investigates practical methods for applying text-based generative AI services like ChatGPT 4 and Luyten in the fields of design and interviewing, thereby contributing to the academic discussion and practical implementation in these areas. The significance of this research lies in its potential to broaden the horizon of scholarly debate and practical application of generative AI in lean startups.

Design of Metadata and Development of System for Managing Connection Information of Digital Contents (디지털 콘텐츠 연관 정보 관리를 위한 메타데이터 설계 및 시스템 개발)

  • Kim, Jae-In;Kim, Dae-In;Song, Myung-Jin;Han, Dae-Young;Hwang, Bu-Hyun
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.7
    • /
    • pp.27-36
    • /
    • 2009
  • The advances in communication technology and the popularity of network have rendered the increment of demand and desire to digital contents, and a number of creative digital contents produced. According to the time of compilation and a production of raw data, and manners, the format of digital contents may be variable and there can be existed in many connection information about digital contents. Although there are many metadata for standardizing the digital contents, they do not consider for expressing the connection relation about digital contents. In this paper, we proposed the new metadata for expressing the connection information about digital contents. This metadata is compatible the metadata of dublin core out of international standard of digital contents. Our metadata can express the variable direct or indirect connection relation about digital contents by expanding the relation element of dublin core. Also, our system can provide more useful information since we develop a system for managing connection information of digital contents based on our metadata.

Three-Dimensional Flow in Turbomachinery (터보기계에서의 3차원 유동)

  • Joo, Won-Gu
    • The KSFM Journal of Fluid Machinery
    • /
    • v.2 no.1 s.2
    • /
    • pp.114-126
    • /
    • 1999
  • 터보기계내의 유동은 복잡하며 3차원적 현상을 나타낸다. 3차원 설계에 대한 개념은 간단한 모델로부터 유도될 수 있다. 날개의 스윕, 린, 엔드벤드 기법들은 성능을 개선하는데 사용될 수 있지만 만능적인 도구가 아니라 필요할 때 설계자가 채택할 수 있는 추가적인 설계도구로서 생각해야 한다. 이들을 성공적으로 응용하기 위해서는 이들의 영향에 대한 물리적인 이해를 필요로 한다. 설계된 날개로 흘러가는 유동을 상세하게 연구하는데 3차원 Navier-Stokes 수치계산방법이 유용하게 사용될 수 있을 것이다.

  • PDF

Case-Based Reasoning Method Using Case Data Base of Tall Buildings in Korea (국내 초고층 건물의 사례 데이터베이스를 이용한 사례기반추론기법)

  • Song, Hwa-Cheol;Park, Soo-Yong;Kim, Soo-Hwan
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.6
    • /
    • pp.75-82
    • /
    • 2007
  • In this study, a design-supporting system, which is intended to assist engineers in the schematic phase of the structural design, is developed using a case database that contains design information of tall buildings in Korea. A case-based reasoning method utilizing the case database is proposed. The inductive retrieval module for selecting structural system, in the initial stage, from the design information of case database for 47 tall buildings is presented. Also, the nearest-neighbor retrieval method for selecting similar design cases is introduced.

  • PDF