• Title/Summary/Keyword: 리스크 요소

Search Result 168, Processing Time 0.023 seconds

Deriving of Major Risk Factors for Planning Phase of u-City Project (U-City사업 계획단계에서의 핵심 리스크 요인 도출)

  • Kim, Ho-Ki;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.139-148
    • /
    • 2011
  • u-City projects are different with the existing urban development projects progress via convergence with IT technology. Therefore, it inheres many risk factors more than the existing development projects as including more complexity and variety. The risk management system to systematically manage those risks which get identified and quantified is required. Especially, the planning phase that is appeared the various forms has a large effect on the success of the business. However, the management of risk factors remains in the passive form. So the problems on u-City project in the planning phase and risk factors of existing development business were analyzed for the continuous growth and the successful performance of u-City project, and those risk factors was identified and quantified by using statistical technique. In the results of it, the core risk factors were obtained through which way and the basis for the effective risk management in u-City business is provided.

A New Methodology for Flood Prediction Mapping Using Levee Risk Map (제방 리스크 지도를 활용한 새로운 침수예상도 작성)

  • Lee, Jae Yeong;Park, Jun Hyung;Han, Kun Yeun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.116-116
    • /
    • 2016
  • 최근 이상기후로 인해 다양한 원인으로 홍수가 발생하고 있으며, 이에 대한 대책으로 가상의 강우 시나리오에 대한 침수예상도가 작성되어 해당지역의 주민들에게 정보를 제공하고 있다. 하지만 이러한 침수예상도가 나타내는 모든 지역에 대해 예산을 투자하여 대비를 할 수 없는 실정이다. 이를 보완하기 위해 본 연구에서는 제방에 대한 수리학적, 지반공학적 위험도, 제방 자체의 성질과 특성을 반영한 취약도를 포함하는 제방 리스크 지도를 작성하여 외수범람에 대한 안전도를 등급화 하였다. 그 결과 침수예상도를 작성하는데 있어 제방 리스크 지도에서 등급이 높은, 즉 리스크가 높은 제방에 대한 재해대책을 수립하는 것이 효율적이다. 본 연구에서는 안성천 유역을 대상으로 제방 리스크 평가를 실시하고, 작성된 제방 리스크 지도를 바탕으로 제방의 붕괴 및 월류시나리오에 대해 1차원 외수범람 해석 및 2차원 침수해석을 실시하여 침수예상도를 작성하였다. 또한 기존의 침수예상도는 침수심에 대한 위험도만을 구분하여 나타내고 있지만, 본 연구에서는 다양한 요소에 대한 침수예상도를 제시함으로써 연구결과물이 재해예방 및 재해경감대책 수립을 위한 기초자료로 활용할 수 있을 것으로 기대된다.

  • PDF

The Analysis of the Weights of Country Risk by Participants of Overseas Construction Projects (건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석)

  • An, Byung-Ho;Kim, Jin-Eon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.150-159
    • /
    • 2013
  • The government has focused on activation of overseas construction projects and strengthening competitiveness in the long term. In recent years Public construction contract as well as design, engineering, construction management(CM) are gradually expanding into other countries, but risk analysis cases in the field are slight. In this study, We utilized PI scale and drew a conclusion about the importance of overseas risk by participants. We compared its features from the risk factor based on Risk Matrix. As a result of this study total of 6 section 31 Country Risk factors for the importance of overseas risk by participants were drawn, and the key risk factors (17 constructor, 14 designers, 17 CMr) based on Risk Matrix were derived. By utilizing the result of this study will be used as the basic data for establishing risk management strategy to meet each business and planning evaluation model.

A Study on Cybersecurity Risk Assessment in Maritime Sector (해상분야 사이버보안 위험도 분석)

  • Yoo, Yun-Ja;Park, Han-Seon;Park, Hye-Ri;Park, Sang-Won
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.11a
    • /
    • pp.134-136
    • /
    • 2019
  • The International Maritime Organization (IMO) issued 2017 Guidelines on maritime cyber risk management. In accordance with IMO's maritime cyber risk management guidelines, each flag State is required to comply with the Safety Management System (SMS) of the International Safety Management Code (ISM) that the cyber risks should be integrated and managed before the first annual audit following January 1, 2021. In this paper, to identify cyber security management targets and risk factors in the maritime sector and to conduct vulnerability analysis, we catagorized the cyber security sector in management, technical and physical sector in maritime sector based on the industry guidelines and international standards proposed by IMO. In addition, the Risk Matrix was used to conduct a qualitative risk assessment according to risk factors by cyber security sector.

  • PDF

A Case Study of the Risk Identification in Construction Project (건설사업의 리스크 식별에 관한 사례연구)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.15-23
    • /
    • 2015
  • In the construction industry, risk management has gained constant attention as the factor not only to evaluate global competitiveness of the country but also to secure competitiveness of public institutions and private companies. For effective construction risk management, the specific work process improvement that can be employed in the field in terms of risk management of the entire corporation such as financial, insurance and safety management is necessary. To manage construction risks, what is important is the step to identifying inherent risks in the construction project. The identification of risks will be followed by the step to seeking ways to establish and manage strategies responding to the risks. This study suggests ways and processes to make a checkslit to identify risks through case studies. To that end, the focus will be placed on working process improvement of risk identification among stages to manage construction risks such as risk identification and analyses, planning to respond to risks, risk monitoring and management. The case study checklists show that setting up the system to classify risks by stage is helpful to figure out causes of risks to reduce or eliminate risk factors. The checklist making process that considers features of the project is expected to contribute to successful completion of the project by enabling effective risk identification and systematic risk management.

Scheduling Risk Management at the Preconstruction Phase (공사 착공 전 단계의 공정리스크 대응방안)

  • Park Ji-Hoon;Kim Sun-Kuk;Han Choong-He
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.457-461
    • /
    • 2004
  • The insufficient management o( the risk of preconstruction phase causes the risk of construction phase so it makes bad effects such as the extension of construction time and raising of cost. Therefore, the management of the risk of preconstruction phase is being considered as an important element of success of project and the competitive power of construction companies. This study Is to suggest solution methods for each progress after examining reasons of the risk for the management of the risk of preconstruction phase 1'he progress is limited as earth work, RC work, steel work and curtain wall work. Through the introduction of Knowledge Management system, work flow is made by specialist of each part. The reasons of the risk of progress are chosen through the analysis of work flow and I suggest detailed solutions such as person in charge, the starting point of progress and the information of requirements according to the grade of importance about elements of the risk

  • PDF

Implementing Software Risk Management Process based on CMMI (CMMI기반의 소프트웨어 리스크 관리 프로세스 구축)

  • Do, Sung-Ryong;Han, Hyuk-Soo
    • Journal of Convergence Society for SMB
    • /
    • v.1 no.1
    • /
    • pp.45-53
    • /
    • 2011
  • There are always many kinds of risks in software development such as frequent changes of requirements. Especially those risks related to the software characteristic of non-visibility can be threat to the project success. That lead us to the need of process implementation to reduce and minimize those risks. Although, most of the organization recognizes the importance of risk management, actual implementation requires professional knowledge in this area. CMMI, the de facto standard in process reference model, also emphasizes on risk management process area but only provides goals and practices to be implemented, not detail procedure and methods. In this paper, we developed Risk management implementation model based on IDEAL, the process improvement model based on CMMI. The proposed model will help the organizations to implement risk management process which is proper to their situation in the factor of organization size and project characteristics.

  • PDF

Risk Influencing Factors in Performance of River Disaster Prevention Project (하천재해예방사업의 성과에 미치는 리스크 영향요인)

  • Cho, Jin-Ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.417-428
    • /
    • 2020
  • The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.

국내 인터넷전문은행 설립시 예상되는 전자금융리스크에 대한 대응방안 연구

  • Kim, Tae-Ho;Park, Tae-Hyoung;Lim, Jong-In
    • Review of KIISC
    • /
    • v.18 no.5
    • /
    • pp.33-48
    • /
    • 2008
  • 최근 은행의 소유지분한도와 설립자본금 등에 대한 정부의 금융규제 완화로 인터넷전문은행의 설립 가능성이 높아지고 있다. 그러나 우리나라의 전자금융환경은 전자금융거래법 제정에 따라 금융기관의 입증책임을 강화함으로써 금융기관의 전자금융리스크가 상대적으로 크게 증가하였다. 또한, 정보 공격기술 및 수법의 발달로 전자금융보안에 대한 위협이 지속적으로 증가하고 있다. 이외 에도 신BIS 리스크 평가에 IT운영리스크가 포함되는 등 금융환경 변화 및 정보통신 기술의 발전으로 인한 전자금융리스크가 계속 확대되고 있는 추세에 있다. 이러한 금융환경 변화와 함께 서비스채널이 인터넷에 집중되는 인터넷전문은행은 기존의 전통적인 은행과 차별되는 리스크에 추가적으로 노출될 위험성이 높다. 이러한 리스크에 대한 인식 및 대비 부재는 금융소비자가 금융권 전자금융거래에 대한 불신으로 확산되거나, 금융시장의 불안정성을 야기하는 금융사고로 이어져 자칫 국내 전자금융의 발전을 저해하는 심각한 요소가 될 수 있다. 본 논문에서는 국내 금융환경과는 차이가 있지만, 인터넷전문은행이 가져올 전자금융의 기술적 변화는 유사하다는 점에서 해외 주요국가의 인터넷전문은행 현황과 전자금융부문을 중심으로 인터넷전문은행 설립인가 사례를 살펴보고, 국내에서 인터넷전문은행 설립시 우리가 취해야 할 입장에 대해 시사점을 얻고자 하였다. 그리고 국내 전자금융 환경에서 전통적인 일반은행과 차별되거나 인터넷전문은행 고유의 특성으로 발생되는 주요 전자금융리스크를 다섯 가지로 분석하였고, 이러한 전자금융리스크를 줄이기 위한 대응방안을 모색해 보았다. 정부의 금융규제 완화는 금융자유화를 진전시켜 금융거래가 자유경쟁원리에 입각해 이루어짐에 따라 국민경제의 발전에 있어서 바람직한 결과를 얻고자 하는 것이다. 그러나 다른 한편으로 과도한 리스크에 노출 될 경우에는 금융시장의 불안정성을 야기하고 이로 인해 역 선택과 도덕적 해이를 야기 시키는 등 여러 가지의 폐해를 줄 수도 있다 이러한 폐해를 줄이기 위해서는 인터넷전문은행의 고유한 특성으로 수반되는 리스크와 상대적으로 그 중요성이 부각되는 전자금융리스크에 대한 관리 감독을 강화해야 한다. 또한 이러한 리스크 관리강화를 위한 제도적 장치는 인터넷전문은행의 자율성과 책임성을 부여하는 방향으로 이루어지는 것이 바람직하다. 인터넷전문은행이 실질적으로 다수의 금융이용자에게 다양한 혜택과 효율적인 금융서비스를 제공하기 위해서는 초기 사업계획 심사 단계에서부터 위험성이 크게 증가하는 전자금융리스크에 대해서, 적절한 관리방안 수립을 통해 예상되는 리스크를 줄이기 위한 노력이 필요하다고 생각한다. 그리고 인터넷전문은행에 대한 구체적인 인가요건이 마련되지 못한 현 상황에서, 국내 인터넷전문은행 설립이 우리나라 전자금융거래에 발전적 역할을 할 수 있도록 앞으로 더 많은 논의와 연구가 진행될 필요가 있다.

An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project (초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석)

  • Kim, Nam-Gyun;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.73-83
    • /
    • 2013
  • Recently, not only around Korea but also other countries shows a pattern of arising high-rise building construction project which was delayed or aborted during global economic crises and recession. Although the market starts to stretch, It is getting competitive to win a contract in high-rise construction project between contractors due to lack of competitive advantage especially to Korea contractors. To get that, Korean contractors needs lifting equipment plan. But currently, they depend on the empirical methods and that cause schedule delay, not controlled cost management problem. Therefore, this research is to improve the accuracy of Lifting plan by analyzing the current issues of Lifting plan system and deducing the types of failures with planning factors, as well as analyzing the impact on schedule and cost control and safety management by each failure mode. Also, by analyzing detail risk factors per Lifting Equipment with FMEA, to infer the critical risk factor on high-rise construction project.